Skip to the record
For the highest quality transcripts.

Original source · versioned page text

16-001014-01A (Swmp)

Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

The Water Surface Levels (WSL’s) determined in each basin have been indicated in Table 3-10 below.

                        Table 3-10: Developed Mitigated Scenario Basin Water Surface Levels

                AEP                    Northern Basin                             Central Basin
                                WSL (m AHD)       Depth (m)1             WSL (m AHD)        Depth (m)1
                63%                99.92             0.52                  100.28               0.68
                39%               100.06             0.66                  100.50               0.90
                18%               100.19             0.78                  100.65               1.05
                10%               100.26             0.86                  100.77               1.17
                5%                100.37             0.97                  100.90               1.30
                2%                100.45             1.05                  100.97               1.37
                1%                100.51             1.11                  101.03               1.43
 Depth noted is the height above the stormwater quality temporary ponding level, which is 99.4m AHD and 99.2m AHD for the
                                          Northern and Central Basin respectively.

The results above indicate that 300mm freeboard has been achieved to the top of each basin’s minimum embankment
level. Results also indicate that the major overflow weirs are only overtopped during the major storm events (i.e. during
the 2% and 1% AEP storms). During the 1% AEP storm, discharge across the major overflow weir is limited to a depth of
200mm. The depth velocity (dV) products reaches a maximum of 0.15m2/s for the major overflow weirs, which is lower
than the QUDM requirements.

3.2.7     EXTREME EVENT SENSITIVITY CHECK

The major overflow/emergency weir for each detention basin has been designed to cater for extreme events, i.e. extreme
storms (i.e. 0.2% AEP storm event) and extreme blockage (100% blockage of basin pits/outlet pipes). To be conservative
the extreme 0.2% AEP storm event has been modelled with 100% blockage of the pits (considering weir flow only). The
0.2% AEP storm for 15 to 4320 minute durations has been modelled in XP-RAFTS with rainfall hyetographs generated
using the IFD parameters for Cooroy specified in Section 3.1.4. Results have been cross-checked with the 0.2% AEP
regional rainfall hyetograph for the 1440 minute storm duration adopted in Water Technology’s Cooroy Flood Study
(2013) model. The highest basin WSL was adopted from all these scenarios. Other than the rainfall parameters and basin
discharge values, all other modelling parameters remain the same as per the Developed Mitigated Scenario.

Table 3-11 below indicates 0.2% AEP basin WSL’s determined in XP-RAFTS.

                                  Table 3-11: Extreme Storm Event Weir Assessment

                                Parameter                         Northern Basin          Central Basin
               Minimum Top of Embankment Level (m AHD)                 100.8                  101.30
                Critical 0.2% AEP Storm Duration (minute)            45 minute              120 minute
                      0.2% AEP Basin WSL (m AHD)                      100.72                  101.22


As indicated in the above table, basin WSL’s indicated above are below top of the embankment levels.




16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP)                COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS                                                                         ROAD, COOROY               | 13
Log in to download the original file

16-001014-01A (SWMP).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.