Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CALIBRE CONSULTING
Existing Scenario Layout
Developed Mitigated Scenario Layout
[OCR of page images]
CALIBRE CONSULTING
Existing Scenario Layout
Al
Oe
OUT
B4 B2 B3 B4 D2
O- O— ~ O-
C1 C2 c 1
O..—_
Developed Mitigated Scenario Layout
Al A2
Ore BasinA
in a ec A OUT
lin!
B1 B2 Tt
2
in ink'
In D2 D_OUT
eS link28 ink10
CA C3 =
> SthBasii node L
c i ~ rid vue fas
link4™
3
\ D1
Divert @
{ Pipe
In}
“Diver
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.