Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CALIBRE CONSULTING APPENDIX E STORMWATER DESIGN CALCULATIONS E1: Existing Swale – Manning’s calculations E2: Energy Dissipater Calculations (Bioretention Basins and WQCP) E3: Design Velocity Check (WQCP and Bioretention Basin)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.