Overtops Embankment
Summary
Table A and B below indicate a comparison between existing and developed flood levels and
velocities within the existing channel on site.
Table A – Flood Level Comparison
Cross Section Ex WSL (m AHD) Dev WSL (m AHD) Difference (m)
A 98.77 98.67 -0.09
B 98.58 98.57 -0.01
C 98.30 98.30 0.00
D 97.97 97.95 -0.02
As indicated in Table A there are reductions in flood levels at each cross section location within the
existing swale due to the peak flow mitigation measures proposed. It is also noted that flood levels
will be significantly lower since they overtop the left channel embankment and sheet flows across
the site boundary (under both existing and developed conditions).
Table B –Velocity Comparison
Cross Section Ex Velocity (m/s) Des Velocity (m/s) Difference (m)
A 0.68 0.95 0.26
B 0.73 0.87 0.14
C 0.72 0.94 0.22
D 0.69 0.68 -0.01
While velocities within the existing swale have been slightly increased. The design velocity is less
than 1.0m/s which is not expected to cause scour.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.