Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Proposed Channel Capacity Immediately Downstream of Culvert Outlet A check of the capacity of the proposed channel immediately downstream of the proposed culverts was determined using Manning’s calculations (refer to the section below). Results indicate that flood levels during the 1% AEP storm are well below the proposed level of the Caretakers building (by more than 2m). Therefore, in the instance that Caretaker’s building floor levels are adjusted slightly for detailed design, the building will not be impacting by flooding from the WQCP outflows.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.