Original source · versioned page text
16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
MUSIC Layout Configuration – Developed Mitigated (With External Catchments) Model
[OCR of page images]
MUSIC Layout Configuration — Developed Mitigated (With External Catchments) Model
A2 Ground 3 Root
D3 Ground
A2 Root A2 Road A2 Park ™
CA D2 Roof
At Road
@
D3 Ground Bypass. Bio Pod D3
At Gr At thern Basin A Receiving Node. D
Ground Northern Basi 9 X Bio Pod D2 02 Car Park
el @ -
ey N
m2 foot \
82 Ground XN Al
‘ XN
S 2 Ground
~
N
se Eee N
N
82 Road @ Ft High Flow (rena) N
N
2 C2 Rood
NX
_
NX
N
- e
ExT B1 Ground ExT 1
Southern Basin Bio EXT Ct EXT C4 Ground
comtral Basin Big Bc
C3 Rosa 3 Ground
EXT Bt Road 83 Roof BS Bt B4 Ground ° EXT C1 Road
4 Park C3 Root
B3 Road 83 Ground B4 Roof
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.