Skip to the record
Accept no imitations.

Original source · versioned page text

16-001014-01A (Swmp)

Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Results Comparison


Site Only (No Mitigation)
                                             Source            Residual           Reduction
Flow (ML/yr)                                             187                187                 0
Total Suspended Solids (kg/yr)                         29700              29700                 0
Total Phosphorus (kg/yr)                                64.8               64.8                 0
Total Nitrogen (kg/yr)                                   425                425                 0
Gross Pollutants (kg/yr)                                4270               4270                 0


Site + External Catchments with Mitigation
                                             Source            Residual           Reduction
Flow (ML/yr)                                             214                213                  1
Total Suspended Solids (kg/yr)                         36500              12700                 65
Total Phosphorus (kg/yr)                                77.1                 33                 58
Total Nitrogen (kg/yr)                                   480                289               40.6
Gross Pollutants (kg/yr)                                4630                488               92.9


Music Modelling Results
             Description                       TSS                TP                 TN              Gross Pollutants
                                             (kg/yr)            (kg/yr)            (kg/yr)               (kg/yr)
    Developed Site Only (Without
             Mitigation)                     29700               64.8               425                   4270
    WQOs (Percentage Reduction)               80%                60%                45%                   90%
        Load Retention Target                23760              38.88              191.25                 3843
Developed Site plus External Catchment
         (Without Mitigation)                36500               77.1               480                   4630
Developed Site plus External Catchment
          (With Mitigation)                  12700                33                289                   488
      Load Retention Achieved                23800               44.1               191                   4142
   Load Retention Achieved as % of
         Developed Site Load                  80%                68%                45%                   97%
         Objective Achieved?                  YES                YES                YES                   YES
Log in to download the original file

16-001014-01A (SWMP).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.