16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Stormwater Management Construction & Maintenance Plan (SMCMP) Report (No. 16-001014-02A dated September
2016) – provides design checklists, construction management and operation maintenance procedures for proposed
stormwater devices.
The design, management and maintenance procedures for stormwater management devices detailed in these
documents, also address previous concerns from Council and are in accordance with past approvals.
This report provides details on peak flow, stormwater quality and water stability management to demonstrate compliance
with the relevant local and state guidelines and Council’s requirements. The site development layout is generally in
accordance with the approved layout and the stormwater management strategies remains consistent with previously
approved documentation.
1.1 SCOPE OF THIS REPORT
The scope of this report includes the following:
Peak flow (or hydrological) analysis using XP-RAFTS software to determine existing peak flows and developed
mitigated peak flows from the site, to ensure no adverse impact as a result of the development;
Stormwater quality analysis using MUSIC software to determine the adequacy of the proposed SQIDs to meet the
Water Quality Objectives (WQO’s) required under the State Planning Policy (SPP, 2014); and
Management of Waterway Stability required under SPP (2014).
While a flood investigation has not been undertaken in this report, it is noted that flood information was previously
provided to Council in Letter No. B14158.W.10LA.AMcP.ms.docx dated 21 April 2016. This document demonstrated no
loss of regional floodplain storage and therefore no increase in the severity of flooding or interference with the existing
watercourse. The peak flow investigation and internal drainage strategy detailed in Section 3.2 demonstrates no
worsening in peak flows discharging from the site, also demonstrating that the development will not adversely impact
flood conditions downstream. Since the site strategy is generally in accordance with concept designs previously provided
to Council (i.e. earthworks, drainage and stormwater management solutions) the above outcomes are maintained.
1.2 PREVIOUS DOCUMENTATION
The following documentation has been previously prepared by Calibre Consulting (Qld) for the Cooroy Retirement
Community development:
Reduced Site Layout - MCU Development Application
Concept Stormwater Management Report (No. B07056.W-02A dated June 2008) – in support of the DA;
Concept Stormwater Quality Management Plan (SWQMP) Report (No. B14158.W-01A dated December 2014) in
support of the permissible change application;
Reduced Site Layout – Bulk Earthworks Approval
Stormwater Management Construction and Maintenance Plan (SMCMP) Report (No. B14158.W-04A dated
September 2015) – in support of the Operational Works - Bulk Earthworks Application; and
Framework Letter Report (No. B14158.W.07L dated 8 October 2015) – Addressing Council’s Change to Existing
Approval Condition Item 72 (dated 2 March 2015).
Reduced Site Layout - Stage 1A Operational Works Application
Stormwater Management Plan (SWMP) Report (No. B14158.W-05B dated 2015);
Stormwater Management Construction and Maintenance Plan (SMCMP) Report (No. B14158.W-06A dated
November 2015);
Response to Information Request Letter No. B14158.W-11A dated 22 April 2016; and
Queries Clarification Letter (No. B14158.W.14 RFI.AMcP.lms Response to RFI.docx dated 6 June 2016) –
Addressing Council Officer Cherie O’Sullivan’s further queries in email dated 27 May 2016.
16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP) COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS ROAD, COOROY |2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.