16-001014-01A (Swmp)
Attached to the e-mail Operational Works Application OPW16/0203 - 3 of 4.
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Overall Site Layout - MCU Development Application
Concept Stormwater Management Plan Report (No. B14158.W-03A dated November 2015);
Concept Stormwater Management Construction and Maintenance Plan (Concept SMCMP) Report (No. B14158.W-
09A dated January 2016)
Response to Information Request Letter No. B14158.W.10A-Response to RFI.docx dated 5 February 2016.
Outstanding Information Request Response Letter No. B14158.W.10LA.AMcP.ms.docx dated 21 April 2016.
The above reports have been considered in the latest analysis.
1.3 RESPONSE TO APPROVAL CONDITIONS
A summary of the responses to Council’s Approval Conditions relating to stormwater management are provided in
Table 1-1 below. Some responses have been addressed in other submissions, such as the SMCMP Report
(No. 16-001014-02A dated September 2016).
Table 1-1: Summary of Responses to Approval Conditions Relating to Stormwater Management
Item Brief Summary of Item Response to Item
59 Adequate flood immunity maintained Design of roadworks and drainage network throughout the site ensures
during local and regional events. adequate management of local flows. Refer to Roadworks and
Drainage Plans. Section 3.2.6 in this report indicates basin water
surface levels provide adequate freeboard to allotment levels.
Section 1.1 in this report provides details of regional flood levels below
developed lots.
60 Site earthworks does not adversely Section 1.1 in this report provides details of regional flood levels
impact flood conditions on adjacent or and site filling well outside of regional flood extents.
downstream properties Furthermore, Section 3.2.6 indicates a reduction of peak flows back to
or below existing levels discharging from the site, which demonstrates
no adverse impact to flooding downstream.
61 Design of stormwater drainage and Stormwater drainage and basin detailed design drawings have been
management devices to be certified by certified by RPEQ. Refer to Drawing No. 16-001014-400 series for
RPEQ specialising in hydraulics. details.
62 Minor Drainage System Capacity – 10% Stage 2 Operational Works drainage has been designed accordingly.
AEP storm, Major Drainage System Refer to Stage 2 Operational Works Design Package for details. Future
Capacity – 1% AEP storm stages will also be designed accordingly. Details are also provided in
Section 3.2.8 of this report.
63 No adverse impact to downstream peak Section 3.2.6 in this report demonstrates that proposed detention
flows up to and including the 1% AEP basins are adequate in reducing peak flows to meet this requirement.
Storm
64 Demonstrate the Stormwater Quality Section 4 in this report provides stormwater quality analysis, outlining
Management Strategy meets Water the proposed Stormwater Quality Management Strategy, which
Quality Objectives as per the SPP, 2014. demonstrates compliance with WQO’s for the site. Discussion of the
treatment of external catchment runoff and modelling methodology is
provided in Section 4.
65.1 Letter from Water By Design or eWater In the proposed modelling (refer to Section 4 in this report), there has
where MUSIC modelling deviates from been no deviation from specifications provided in the MUSIC Modelling
MUSIC Modelling Guidelines (2010). Guidelines (2010). Therefore, a letter is not required. As per previous
correspondence with Council, the pond node has not been modelled in
MUSIC. This is a conservative assumption considering that the pond
will capture suspended solids through a process of sedimentation and
provide some reduction of nutrients.
65.2 Contingency plan with costs to be A contingency plan has been provided in Appendix A of the SMCMP
provided to Council. Stormwater runoff Report. Stormwater runoff is to receive primary treatment from
from roads and car parking areas to be proprietary GPT’s that can remove grease and oil, and tertiary
pre-treated for grease and oil. treatment from Bioretention Basins before discharge into the Pond.
Note that all areas likely to generate significant amounts of grease and
16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP) COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS ROAD, COOROY |3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.