Council archive · source document
PM Submission Object - Sallie Strang - MCU18/0084
Photograph 6: Showing the new A adjoining fence that replaced that fence damaged by the fire in rural property ; Photograph 4 above. 11. The proposal does not sufficiently identify where either the potable or non-potable water supply. It is assumed that the 4000 litre tank proposed to be plumbed to each cabin will rely on roof water collected on the small roof of each respective cabins for both potable and non-potable supply. The potential peak population of say 24 people will therefore rely on water collected from possibly 37 square metres of the roof of each cabin. It is assumed that each tank will be independently plumbed to the motel villa that it services and possibly each with their own pressure pump. It is suggested that depending on occupancy rates, that this proposed source and associated storage of potable water may not be sufficient. For example, 4 people in a cabin for a week, would require 3220L just to have the septic system operating properly which is 80% of the tank’s capacity. Therefore, potable water may or may not need to be trucked in and therefore water tanker access may need to be possible to all proposed water tanks. | suggest that that would also require a hard surface for accessing each cabin as the ground can become boggy. This proposed hard surface would then encourage visitors to park adjacent to their unit rather than in the proposed car park. It is therefore suggested that the development application does not provide sufficient details on yet another critical design and operational element. 12. |The development application does not clearly indicate where the refuse bins/skip will be stored and whether any screening is proposed. The development application explains the waste management is “work in progress” as the applicant does not know what to expect until the proposed development starts operating. There should be sufficient information and science available to enable any applicant proposing 6 cabins with a potential peak occupancy of say 24 person (in 2 stages) to be able to provide proposed waste management details. Unfortunately, once again the limited information has been provided in the development application on yet another often important design and operational element. 9|Page Council Reference: MCU18/0084
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission Object - Sallie Strang - MCU18/0084Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.