Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Appendix G - development permit 132007.2398.02

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application G - Original Development Permit & Approved Plans Email 8 of 8.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                       132007.2398.02

    MATERIALS ON-SITE                      DESTINATION
                                           Re-use and Recycling                      Disposal
    Expected waste             Estimated   On-site            Off-site               *specify
    materials                  volume      *specify proposed *specify                contractor    and
                               (m³)        re-use or on-site contractor      and     landfill site or
                                           recycling          recycling outlet       other     disposal
                                           methods                                   site
    Excavation material
    Green waste
    Bricks
    Concrete
    Timber-please specify
    Plasterboard
    Metals - please specify
    Asbestos
    Other - please specify
     Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
     completed by the demolition contractor.

     The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
     effective reuse and recycling of such materials. Additionally Council rewards those who
     segregate waste by significantly reducing disposal fees at the landfill some items are free. Higher
     gate fees are charged for loads of mixed waste.

Mosquito Protection
109. Submit a Management Plan for the control of mosquitos from the three large water
     basins, including form of construction of basins, vegetation in and along the shoreline,
     on-going monitoring and eradication treatments. Plan is to be approved by Council’s
     Environmental Health Section.
110. Doors and windows of the Aged Care Residence, Apartments, Community Centre and
     Independent Living Units are to be fitted with insect screens.
Noise Management
111. The location and operational hours of mechanical plant equipment including domestic air
     conditioning units, is not to create a noise nuisance to occupiers.
112. Noise from building works associated with residential development shall comply with the
     following –
     112.1 Limited to between 7:00am to 6:30pm Monday to Saturday.
     112.2 All reasonable measures are taken to minimise noise emissions.
     112.3 Not permitted on Sunday or public holidays.
113. All water taps from the onsite rainwater storage system are to be labelled “Not fit for
     drinking”.


Additional Conditions 2 March 2015

      Waste Management
114. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
     No. 9 Waste Management must be submitted for the day-to-day operation of the
     development and approved by Council’s Waste and Health Section prior to issue of
     development permit for operational works.



                                                                                      Page 14 of 20
Log in to download the original file

Appendix G - development permit 132007.2398.02.pdf · 106 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.