Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix G - development permit 132007.2398.02

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application G - Original Development Permit & Approved Plans Email 8 of 8.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                132007.2398.02

99.   The transportation of all materials to and from the site shall be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site shall be covered to prevent materials including dust being
      windblown from the vehicle.
100. As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted to
     Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to
      roadworks, pathway, sewer main, water supply main, finished ground levels and
      pavement surface levels and drainage structures that will become Council asset. The
      data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been
      supplied and accepted by Council.
Waste Management
101. Deleted
102. Deleted
103. Deleted
104. Deleted
105. Deleted
106. Deleted
107. Deleted
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
     demolition, removal or relocation of any building other than a shed. Waste Management
     Plan (construction and demolition) is also required for construction of 15 or more
     dwelling units or for any business use of greater than 500m².
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table
      below. Waste storage areas are to provide for adequate separation of all reusable,
      recyclable and waste materials. These shall be located so that they are convenient and
      safe to use. The Plan shall contain the following information:
           The site area for the storage and separation of waste is to be shown on the plan
            drawings accompanying the application.
           A waste management table as indicated below is to be completed showing how
            waste material is to be segregated - recycled – reused or disposed.




                                                                                Page 13 of 20
Log in to download the original file

Appendix G - development permit 132007.2398.02.pdf · 106 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.