Appendix G - development permit 132007.2398.02
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application G - Original Development Permit & Approved Plans Email 8 of 8.
132007.2398.02
24. Transformers, waste storage areas, etc shall be screened to reduce their visual
intrusiveness.
Aged Care Residence
25. A maximum of 82 employees at anyone time are permitted to be engaged in the
operation of the aged care residence.
26. Deleted.
Lot Amalgamation and Road Dedication
27. All separate, adjoining lots that form part of this application shall undergo a boundary
realignment to reflect the approved layout so that the aged care facility solely occupies
one allotment and the retirement community solely occupies the second allotment. The
boundary realignment shall occur in accordance with the Sustainable Planning Act 2009
. Proof of title being issued for the realigned lot shall be submitted to Council prior to the
issue of the Development Permit for Operational Works.
28. Prior to commencement of use the applicant shall dedicate road reserve truncation at the
intersection of Pearsons Road with Elm Street to ensure that the existing power lines
crossing this corner of the site be located within the road reserve. The new boundary
line setback from the power line shall be in accordance with ENERGEX’s requirements
and adequate to accommodate any proposed or future pathway at this corner of the site.
Vehicle Access, Roadworks and Frontage Works
29. All pathways and roadworks required by this approval including the works required by
Department of Main Roads (DMR) on Cooroy Connection Road (Elm Street) at its
intersections with Pearsons Road and Lamonts Road, and the roadworks required by
Council on Trading Post Road, Pearsons Road and Lamonts Road must be included in
the first stage (Stage 1a) of the development with the exception of roadworks relating to
the site’s access from Lamonts Road which must be carried out as part of the
development of Stage 3.
30. The applicant must design and construct kerb and channel along the western side of
Pearsons Road with any associated road widening and drainage works to achieve Local
Road standard for Urban area (8m Kerb to Kerb) in accordance with Council’s Planning
Scheme Policy 5 - Engineering Design Standards – Roads, Drainage and Earthworks.
The existing kerb line at the intersection of Pearsons Road and Elm Street must also be
upgraded in accordance with Department of Main Roads Standard to match the
proposed new width and new kerb line of Pearsons Road or as may be specified by
Department of Main Roads in the operational works approval. A Development Permit for
Operational Works shall be required.
31. The applicant must construct a cul-de-sac head at the end of Trading Post Road in
accordance with Section 3.12 of Council’s Planning Scheme Policy 5 - Engineering
Design Standards – Roads, Drainage and Earthworks. A Development Permit for
Operational Works shall be required.
32. The applicant must design, construct and seal Lamonts Road from Elm Street to 10m
beyond the access to the development site in accordance with Council’s Planning
Scheme Policy 5 - Engineering Design Standards – Roads, Drainage and Earthworks
with 7m wide seal and flush kerb be provided on both sides of the seal. The intersection
of Lamonts Road with Elm Street must be designed in accordance with Department of
Main Roads Standard or as may be specified by Department of Main Roads in the
operational works approval for this intersection. Accesses to other properties shall be
adjusted as necessary to match the new levels of Lamonts Road. A Development
Permit for Operational Works shall be required.
Page 5 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.