Original source · versioned page text
Minor Change Existing Approval 131998 981643 3 [As Published]
Additional Conditions – specifically relating to Change Approval 16 February 2005 (Lot 1 SP
127822)
Land Development
Park Contributions
26 A Park contribution of $1,596 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid to the Council prior
to obtaining a Development Permit for Building Works in accordance with Council’s Planning
Scheme Policy PSP24 Park Requirements. This amount will be subject to variations in the
Consumer Price Index, All Groups Brisbane from September 2004 until the date of payment.
Pathway Contributions
27 A pathway contribution of $145 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Building Works. This amount will be
subject to variations in the Price Index, All Groups Brisbane from September 2004 until the
date of payment.
Headworks
28. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
September 2004 until the date of payment.
Water Supply $1,000
Sewerage $620
TOTAL $1,620
All headworks contributions must be paid prior to the issue of a Development Permit for
Building Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
General
29 Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
30 Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
31 The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
32 Security in the form of a cash bond or trading bank guarantee to the sum of $3000 must be
submitted, prior to the issue of a Development Permit for building works to ensure no damage
occurs to the environment and/or to any of Council’s infrastructure.
The cash bond or trading bank guarantee will be returned upon payment of the required
sums and performance of the conditions of approval.
Page 4 of 7
Document Set ID: 23644212
Version: 2, Version Date: 20/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original