PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               10 SEPTEMBER 2019


Change to conditions
An assessment of the applicants request to change condition 1 and 2 is further detailed below.
Condition 1
Vessels associated with the marine use of the facility must only be moored within the approved
lease area.
Applicant’s Request
The applicant requests modification of Condition 1 to reference berthing instead of mooring as
detailed above.
Assessment of Request
The applicant’s request is not supported as the terms of lease, planning scheme requirements
and Concurrence Agency Response refer to mooring and not berthing. The terminology should
therefore be consistent and refer to mooring.
Condition 2
Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.

 Plan No.     Rev.    Plan/Document Name                                            Date
 26236-J1     D       Jetty Plan and Details prepared by SCG Consulting Engineers   12 October 2017
 26236-S2     C       Jetty Plan and Details prepared by SCG Consulting Engineers   12 October 2017
Applicant’s Request
The applicant seeks to amend the approved plans to detail no setback to the northern lease
boundary as detailed above.
Assessment of Request
As previously detailed the applicants request is not supported as all mooring temporary or long
term should be provided for within the lease area to minimise further cluttering of the Noosa
River. As demonstrated by the aerial photograph below, the jetty is an area that already contains
a number of commercial jetties in close proximity to each other that currently have all boats and
services located within their respective lease areas.




                  Figure 5 – Aerial photograph of subject site and surrounding jettys


                                                                                        Page 18 of 76
Log in to download the original file

2019-09-10 Planning & Environment Committee Agenda(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.