Original source · versioned page text
App C - Current Decision Notice and Approved Plans
DEVELOPMENT PERMIT FOR RECONFIGURING A LOT (RAL25/0010) When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to the lodgement of a Plan Seal application. Currency Period 2. This development approval lapses if the requirements of the conditions have not been completed and an application for plan seal is not lodged with Council by 17 September 2029 unless an application to extend the currency period is approved by Council. Approved Plans 3. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed in the table/s below. Plan No. Rev. Plan/Document Name Date 01 - Subdivision Plan prepared by JL 12/05/2025 4. All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. Boundary Encroachments 5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which certifies that: a. all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement. b. all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement. c. all dams (including ponded water, dam walls and associated spillway structures) are wholly located within the boundaries of a single lot. d. all retaining walls and structures are fully contained within the lot they retain unless otherwise required by condition. e. any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties. f. for the community title scheme, the road pavement changes required by this Decision Notice accurately demarcate the boundaries of the public and private land. Water & Sewer Connections 6. An underground connection to reticulated water and sewerage must be provided to each Multiple Dwelling in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to each Multiple Dwelling. Services 7. Underground reticulated electricity and telecommunication services must be provided to each lot in accordance with an approval for Operational Works and the standards and requirements of the relevant service provider. 8. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Page 14 of 18 Document Set ID: 24223542 Version: 4, Version Date: 15/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (App C - Current Decision Notice and Approved Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.