DEVELOPMENT PERMIT FOR RECONFIGURING A LOT (RAL23/0014)

Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the table/s below. The plans must be amended to
incorporate the amendments listed within the table below and resubmitted to Council
prior to the issue of any Development Permit for Building Works*

The plans have been amended removing the pool from this area and an approval.
Please amend the condition to reflect the changes.


DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW23/0113)
(Road work, Earthworks, Signage, Vegetation Clearing)

3. Prior to commencement of works within the development site, maintenance and
rectification of the underground stormwater drainage network downstream of the site is
to be completed and is to ensure that the capacity of the network is consistent with the
capacity assumed in the Stormwater Management Plan Rev C (prepared by SCG
Consulting Engineers, dated 5.12.2023).


SCG consulting engineers have reviewed the condition and seeks further clarification
regarding the wording. Council should not be able to condition the developer for the
maintenance & rectification of Council’s existing stormwater network prior to
commencement of works. If the existing network has been damaged it is prudent to
advise Council of the problem, however it is not the responsibility of the developer to
rectify works that could be hundreds of metres away from their site that they have not
caused damage to. Please review the wording of the condition.


PRELIMINARY APPROVAL Development Permit FOR OPERATIONAL WORKS
(OPW23/0113) (Landscaping, Drainage Work, Stormwater)

Please find attached the updated landscaping and engineering drawings addressing
Council’s plan requiring amendments including:

-   Bioretention layout plan updated
-   Detention tank details
-   Landscaping adjacent to Lot 2 includes syzigium and callistemon
-   Headland Dr landscaping basin landscaping extended into road reserve
-   Landscaping species updated

A full Development Permit should be issued, and standard conditions included.
--------------------------------------------------------------------------------------------------------------------

If you have any further queries in relation to the above, please do not hesitate to contact
myself.


Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
                                                                                                    Page 10 of
                                                                                                    10
Log in to download the original file

Change Reps 30 Jan 2024.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.