Condition 20 – Streetscape connections

20. There are to be no private footpath connections within Council’s road reserve to
Units 101, 102, 105 & 701-704, this area is to be returned to grass.

Malolo allows for streetscape pathway connections and there are no specific outcomes
in the planning scheme restricting this arrangement. Please delete this condition in
accordance with the information request response and good planning practice for
connecting people to active streetscapes.

25. The notated “drying court” as shown on the Upper Level Plans of Units 205-208, 603,
604 & 706-708 are not to be enclosed, with the area to present as an upper level terrace.
The screening element of the “drying court” is to achieve a minimum of 50%
transparency, with the remaining terrace being open with a balustrade.

Revised plans are provided with appropriate screening device details with this condition
to be deleted.

30. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan (or part thereof) prepared by a qualified person* and endorsed
through an Operational Works approval. *(Refer to Advisory Note)

The vegetation surrounding the house has been removed as part of the demolition
approvals. The site is not covered by a Biodoversity overlay and is in the middle of the
built environment – with the risk to fauna therefore minimal and is an unreasonable
imposition on the development.

41. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must include
in particular:
         a. a 3 metre wide footpath within the road verge for the entire length of the site’s
         frontage to Eumundi Noosa Road;
         b. the resealing of the existing asphalt path fronting the development.

Condition 41 is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.

The condition for Malolo (MCU21/0156) required the construction of a 2.0m footpath to
match the balance of the site frontage. The landscaping approval and information
requests sought for dense landscaping between the footpath and the fence line (also
setback from the boundary).

Eumundi Noosa Rd is classified as a ‘2 lane Distributor’ (minor - 5k to 15k VPD). The
requirement seeks for a 2m desirable pathway width and for major distributor roads to
have a 3m pathway. This part of Eumundi Noosa Rd has a 3m pathway on the western
side of the road and this side of the road should have the extra landscaping and
vegetation in accordance with other recent approvals along the street.




                                                                               Page 9 of
                                                                               10
Log in to download the original file

Change Reps 30 Jan 2024.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.