Properly made submission (object) Brett Kennedy MCU13/0171
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Plan. Surely, this plan must be seen is only one tool. Given the absolute threat to life and to
property that floods pose, it is incumbent upon them to adopt a more accurate and
informed (safer)practice when assessing flood threats when developing proposals for
developments.
The proposed factory site sits on land that has clearly been extensively filled and
raised.
Given;
-
that this expansive building is adjacent to a watercourse and not a drain,
-that the walls of the now man-made watercourse are narrow and steep (as
confirmed by the gradient lines in the schematics of the proposal plan),
-
that the constructed drains cannot contain the volume of flood water that occurs,
as I have repeatedly observed
-that there is an artificially (unnaturally)high profile of the huge majority of land
where the floodwaters enter the Wimmers property
-and that the extended profile of lifted land of the proposed factory site and the
parking areas at the rear of the factory juts out at an angle to floodwaters as they enter the
property forming an artificial weir
I am concerned about the effect that the current, modified soil levels that the factory and
yards would sit on has on the severity and frequency of flooding in my property. It lays out
and into the path of floodwaters as they enter the property. Floodwaters cannot rise and
spread out as they naturally would have done on the proposed factory side of the
watercourse. The "threshold" level of flooding, caused by the damming of the road is then
added to. Once the water clears the road there is not enough low lying land to lower the
levels ofthe flood waters. Bottlenecking of flood water backs water into my property.
The fact that the constructed drains built to carry the water of the creeks are
inadequate to carry the volumes of water that occur is clear. This not only puts my property
at risk. The proposed factory building itself is at risk from flooding. I have been told by a
Wimmers factory representative that the February 2012 floods came within six inches of
flowing into the building. My memory ofthe debris that was left after this flooding event,
puts the puts the flood levels as coming even closer. Even though the floor level of the
proposed building is to be raised, it is clearly perceivable, given its absolute proximity to the
creek, that the building is at serious risk in a major flood event. Such an event would put the
waterway at risk from the contents of the building. I remember an occasion when workers
at the brickworks were sent home due to concerns over flooding.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Properly made submission (object) Brett Kennedy MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.