Original source · versioned page text
Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
Document Set ID: 24377726 STORMWATER MANAGEMENT PLAN Client: Noosa Shire Council Location: Doonan 2.2 Existing Land-use, Topography and Drainage The site in its existing state is the Noosa Resource Recovery Centre which is mainly covered with maintained bushland in the northem portion of the site and existing buildings and land fill areas in the southern portion. The site is surrounded by bushland to the east, west and south. There are residential lots and a golf course to the north. The site slope is approximately 1.5%, with gradual changes in elevation from 30 m AHD to 16 m AHD. The site slopes from south to north and discharges over the northern boundary to the northern road reserve before flowing through the golf course. 3.0 Proposed Land-use The development is a Recycle and Transfer Station Centre and associated infrastructure which is replacing the Solid Waste Depot and Reviva Noosa Reuse Shop buildings. Refer to Figure 3-1. Earthworks have been proposed to accommodate the development of the site and to facilitate efficient drainage. Appropriate drainage infrastructure has been proposed in the design, including overland flow swales to discharge local flows from the site and to convey runoff from external catchments around the site. Figure 3-1 Proposed Development Concept 5 Project No: 244035 a covey 25-0042 Rpt Issue A Version: 13, Version Date: 23/12/2025 Page 57 of 72
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.