Original source · versioned page text
Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
Client: Noosa Shire Council 4.0 STORMWATER QUANTITY Stormwater quantity management for the site ensures a “no-actionable nuisance” design for the proposed development. Development of the site will result in an increase in impervious area and a corresponding increase in peak stormwater runoff. However, as the proposed development area (2.24 ha) is much smaller than the overall catchment (287 ha) the minor increase in the fraction impervious has a negligible effect on the overall catchment peak discharges. As the proposed development has a fraction impervious higher than the overall catchment and is located closer to the downstream boundary (outlet) the peak discharge will arrive at the outlet much sooner than the overall catchment. Therefore, the increase in the peak discharge for the overall catchment will be negligible. Further, stormwater detention is not required for the proposed development. Refer to Figure 4-1 for the overall stormwater catchment. Refer to the Flood Impact Assessment (Report No. M25-0045Rpt Issue A) prepared by Covey Engineers for further details. Figure 4-1 Overall Stormwater Catchment (extract from report no. M25-0045Rpt) Project No: 244035 M25-0042 Rpt Issue A Document Set ID: 24377726 Page 58 of 72 Version: 13, Version Date: 23/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.