Original source · versioned page text
Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
Document Set ID: 24377726 STORMWATER MANAGEMENT PLAN Client: Noosa Shire Council Location: Doonan Figure 5-1 Site Stormwater Quality Catchment Pian The areas used to model the source nodes were extracted from the proposed development plan. The nominated fraction impervious for each source node modelled in MUSIC was therefore: e Road source node: 100% impervious * Ground cover source node: 0% impervious ¢ Roof source node: 100% impervious 5.2 MUSIC Model Parameters The MUSIC Modelling Guidelines - South East Queensland Version 1.0 (WBD, 2010) was used to source base and storm flow concentrations and runoff generation. The model was calibrated using the Bureau of Meteorology (BoM) data from Cooroy, 1973 - 1983 at a 6-minute time step in accordance with the W8D (2010) guidelines. All source nodes were set up in accordance with this guideline, specifically for split catchments. No routing of drainage links was applied as a conservative approach. This approach assumes that the flow through the drainage system is instantaneous, which likely overestimates the pollutant load. Refer to Table 5-2 for the split catchment source node characteristics for each sub-catchment. A copy of the MUSIC model is found in Appendix B. Table 5-2 MUSIC Source Node Characteristics 0.778 0.168 0.400 1.346 8 0.600 0.110 0.186 0.896 3 Project No: 244035 a covey M25-0042 Rpt Issue A Version: 13, Version Date: 23/12/2025 Page 60 of 72
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.