Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
STORMWATER MANAGEMENT PLAN Client: Noosa Shire Council Location: Doonan 5.3 Proposed Stormwater Treatment Train Stormwater runoff from the proposed development will be treated by two (2) bioretention basins prior to discharging into the receiving environment. The proposed Bioretention Basin A will treat Sub-catchment A, and Bioretention Basin B will treat Sub-catchment B. Table 5-3 details the associated bioretention basin parameters used for the proposed treatment train. Table 5-3 MUSIC Details for the Proposed Treatment Train ee ee ree er ved tor ed er la Pret 2 " fen) bry ae p ‘ aie i] aay A 122 122 o7 03 80 80 Refer to the engineering plans in Appendix A for further details. 5.4 MUSIC Modelling Results MUSIC modelling of the proposed catchments was performed to ensure the nominated treatment strategy achieves the required pollutant reduction objectives listed in Table 5-1. The target reductions in stormwater pollutants are based on a comparison of an unmitigated scenario, having no treatment on site, and the mitigated scenario, which has stormwater treatment measures incorporated onto the site. As per the SPP (2017), MUSIC modelling is performed to demonstrate the environmental values of receiving waters are not negatively impacted through the release of nutrients and sediments into waterways. Table 5-4 provides the modelling results for the proposed development being treated by the proposed bioretention basins. Table 5-4 provides MUSIC modelling results for the overall catchment and considers all sub- catchments in Table 5-2 and the overall proposed treatment train. Table 5-4 MUSIC Model Results for the Overall Treatment Train Unmitigated Mitigated toe Toads) ts Tat Ly en A = pT (ean) ren Pete ts en eat) TSS 9590 1310 B11 30 Y ™. 16.7 4.39 73. 60 Y 1™N 72.6 37.2 48.8 45 Y GP 666 0 100 30 Y The MUSIC modelling results in Table 5-4 demonstrate that the stormwater management strategy proposed for the development site meets or exceeds the target reduction rates for major pollutants required by the NSC and the SPP (2017). 9 Project No: 244035 @] covey M25-0042 Rpt Issue A Document Set ID: 24377726 Page 61 of 72 Version: 13, Version Date: 23/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.