Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
Document Set ID: 24377726 STORMWATER MANAGEMENT PLAN Client: Noosa Shire Council Location: Doonan 6.0 MAINTENANCE PERIOD The proposed bioretention basins will require management during both the construction period and maintenance period of the development. To establish vegetation and treatment functions in the bioretention systems, the filter media will require protection from the common pollutants generated in the construction phases of the development. During the operational phase, regular maintenance is required to ensure a comprehensive vegetation establishment, a critical component in stormwater pollutant uptake. Section 6.1 provides details for the general maintenance periods and the requirements for the bioretention basins. 6.1 Bioretention Basins 6.1.1 ‘Construction Period’ Maintenance Requirements Erosion and sediment control devices will be installed at the commencement of the works to capture and treat runoff during construction works. The sediment control devices should be cleaned out as required and at the end of the works. During the construction stage, all sediment control devices are to be inspected weekly, after runoff generating rain events and prior and after prolonged site shutdowns (e.g. holiday periods). Proposed bioretention basins may be excavated and used as a sediment basin, where appropriate. Any sediment basin will require weekly inspection to prevent scour and sediment build up. Basins should be inspected regularly and cleaned out when 1/3™ full. At the completion of construction, the sediment basins will be removed. The bioretention basin will be installed at the end of the construction phase when the site is stabilised. 6.1.2 ‘Maintenance Period’ Maintenance Requirements The bioretention basin on ground level may be temporarily turfed if required during the maintenance period. Once construction of 80% of the site in the catchment of the development is complete, the turf will be removed, and the basin will be vegetated appropriately. 6.13 ‘Operational Period’ Maintenance Requirements Maintenance is to be carried out as needed to ensure continued functionality of the system. Maintenance includes initial watering plants in new system, removal of litter or plant debris and reparation of eroded areas. 10 Project No: 244035 ma covey M25-0042 Rpt Issue A Version: 13, Version Date: 23/12/2025 Page 62 of 72
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.