Council archive · source document
07/0738 Request for Further Information - 010.2007.00000738.001 [As Published] · 132007.738
Environmental Services / Works
24. It is requested that further discussions are held with Council to confirm an
appropriate layout for the bicycle path any fire fighting access path necessary to
protect the development. Appropriate connectivity is also required with other
development currently being assessed in the area.
Environmental Health
25. Please submit a Waste Management Plan (Operational) in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”, for the day-to-day operation of the
development.
It is critical that waste areas are properly planned. A copy of Planning Scheme
Policy No. 9 explaining exactly how to predict waste quantities and design waste
areas is available from Council or online. The Plan shall include the following
information: -
The types of waste that will be generated from the activities approved within
the development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
Description of procedures for getting all waste to the bins; the storage of bins
and the collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing and
system to prevent storm water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of containers
for all waste and recycling materials including putresable matter, non-
recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil,
styrofoam boxes, etc, and bin washing facilities connected to sewer.
A detailed description of vehicular access to collect waste. Where collection
is off street, access must allow vehicles to enter and leave the site in a
forward direction.
26. The application has not addressed the typical uses that may be anticipated, and
hence has not allowed for associated infrastructure, vehicle wash down bays,
sound-proof walls, grease traps etc. Given the difficulty in retrofitting such
infrastructure consideration should be given to their provision at this stage.
Please provide six (6) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 Request for Further Information - 010.2007.00000738.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28 KB (small file)
- File type
No other editions are linked here.