07/0738 Request for Further Information - 010.2007.00000738.001 [As Published] · 132007.738
18. All existing drainage flow paths that enter the site, whether overland or within a
pipe, shall be accepted and safely carried through the site. In this regard
Gateway Drive will act as an overland flow path in a major storm event and due
to the grade of this road stormwater runoff will be directed into and across the
subject site towards Lake Doonella at the rear. This overland flow will therefore
need to be taken into consideration with the design of the industrial development
and an appropriately sized flow path provided through the site to safely carry this
volume of water past the Industrial Units.
As such, please arrange a Registered Professional Engineer Queensland to
design the overland flow path through the site, with consideration given to the
actual drainage catchment and the future development potential for the area that
will see further industrial developments and a likely increase in runoff.
This overland flow path will need to be shown on the proposal plans for Council
to review and ascertain the level of impact.
19. Demonstrate how the site is proposed to be drained such that there is no impact
to any of the adjacent land and no increase in run-off for storm events up to and
including a 1 in 100 year Average Recurrence Interval design storm (Q100).
Consideration will also need to be given to the likely contaminants that could be
expected off an industrial site and to erosion caused by concentrated flows that
scour the natural landform. It is noted that the present proposal does not give an
indication of the extent of scour that could occur nor the measures that will be
necessary to avoid the affects of scouring.
20. On review of the Stormwater Quality Management & Assessment Report by
Callaghan & Toth it is noted that a number of different devices are proposed to
manage and treat stormwater runoff. In this regard please indicate on the
Architectural plans these devices (i.e. once they have been correctly sized to
cater for the Q100 flow), particularly when they are proposed to be located above
ground (such as rainwater tanks), as Council will need to review the devices in
context with the proposed buildings and carpark. As such the Architectural plans
and elevations will need to be reviewed.
21. Please provide a detailed Traffic Report assessing the impacts of the proposed
development and making recommendations as to the level of upgrading works
that may be necessary to the road network to cater for the development. Traffic
generation rates should be based on a worst-case scenario for the actual Uses
proposed (including the Café and Outdoor Dining Area particularly if that is what
is going to be ultimately proposed by the applicant).
22. Please submit a copy of the Environmental Management Plan for the site, and
incorporate the relevant aspects of the Acid Sulphate Soil Report, the Stormwater
Quality Management & Assessment Report, the Ecological Assessment Report,
the Traffic Report, and any other site-specific reports.
23. It is noted that some of the outcomes proposed and recommended by the various
reports submitted with the proposal are in conflict with one another. In this regard
each individual consultant should be given copies of the other consultants reports
to review and to ensure that they each have a workable and consistent approach
to developing the site. The applicant should then review the various reports to
ensure consistency prior to resubmitting the amended reports to Council.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 Request for Further Information - 010.2007.00000738.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28 KB (small file)
- File type
No other editions are linked here.