Original source · versioned page text
2017-04-11 Planning & Environment Committee Agenda
The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 APRIL 2017
The first FHAs were declared in Moreton Bay in 1969 in response to increasing development
impacts on fish habitats and their dependent fisheries in south-east Queensland. There are now
70 declared FHAs in coastal Queensland, protecting over 1.15 million hectares of critical fish
habitats.
FHAs impose two management levels (A and B) with A being the strictest, to protect all fish habitats
such as sand bars, mud banks, rocky outcrops, mangroves, saltmarsh and seagrass etc. and allow
for legal commercial, recreational and indigenous fishing.
The FHA network in Queensland comprises 82% management A and 18% management B areas.
In the Noosa River system, the FHA network includes 5,974 hectares of management A (98.4%)
and 100 hectares of management B (1.6%).
A total of 6,074 hectares of critical fish habitat encompasses parts of the lower and upper Noosa
River estuary, Weyba Creek, Lake Weyba, Doonella Lake and Lakes Cooroibah, Cootharaba,
Como and tributaries (refer Attachment 2).
The proposed jetty infrastructure at Elanda Point is located in the Noosa River management A
FHA.
3. DEVELOPMENT IN DECLARED FHa
A challenge outlined by the Department of National Parks, Sport and Racing in the Declared Fish
Habitat Area Strategy 2015-20 is to maintain the integrity of the declared FHA network and
individual declared FHAs, in particular with increased population growth, associated development
pressure and response to natural disasters.
Any FHA boundary amendment proposals to facilitate development are subject to careful
assessment, must be adequately justified and must not affect the integrity of the declared FHA,
the network or the ability to provide comprehensive, adequate and representative protection of fish
habitats in Queensland.
The main differences between FHA level A and FHA level B are set out in the section below.
In management A critical fish habitat areas development is limited to activities like:
constructing public fishing infrastructure;
ensuring public health and safety;
maintenance of existing structures;
constructing temporary structures;
installing underground public infrastructure;
managing fisheries resources or fish habitats (e.g. installing a boardwalk for access);
research and education; and
environmental restoration.
In management B areas the following may also be allowed:
construction of some private structures (e.g. pontoons, boat ramps, revetments, buoy
moorings); and
beach replenishment.
Protecting and maintaining Noosa’s extent of management A declared FHA is a matter of State
environmental significance in the State Planning Policy and other State planning instruments. It is
also a desired environment outcome articulated within the Noosa Plan and the Noosa River Plan
(2004).
4. PROPOSED SUBMISSION
It is recommended that Council make a submission to the Eco Camp proposal based on the draft
submission outlined in Attachment 3.
Page 15 of 106
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.