Original source · versioned page text
Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)
Le Lt NOOSA COUNCIL IDAS Development Application Decision Notice 14 76.2. Demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. 76.3. Meet the provisions of the Queensland Fire and Rescue Authority Act 1990. 77. Deleted. Environmental Management Plan (EMP) 78. The EMP prepared by URS and dated 5 November 2002, is endorsed as the draft EMP for the development, as amended by the conditions of approval. The applicant shall submit an amended EMP to the reasonable satisfaction of the Manager - Environmental Services prior to the issue of a development permit for operational works. 79. With regard to the particular plans within the EMP, the following are to be addressed: 79.1. The applicant shall prepare a Wetland and Aquatic Ecosystem Monitoring Plan providing for Monitoring of performance against the relevant criteria in the Wetland and Aquatic Ecosystem Protection EMP, for the maintenance of suitable habitat characteristics for the Wallum Froglet population. The Monitoring Plan shall be to the reasonable satisfaction of the Manager - Land Development and Manager - Environmental Services and shall be provided prior to the application for operational works. The applicant shall report to the Council in writing the results of the Monitoring of performance in accordance with the Monitoring Plan quarterly for five (5) years following the commencement of use. 79.2. The applicant shall prepare an Erosion and Sediment Control Ecosystem Monitoring Plan ~ providing for monitoring of performance against the relevant criteria in the Erosion and Sediment Control Ecosystem Protection EMP, for the maintenance of suitable habitat characteristics forthe Wallum Froglet population. The Monitoring Plan shall be to the reasonable satisfaction of the Manager - Land Development and Manager - Environmental Services and shail be provided ‘prior to the application for operational works. The applicant shall report to the Council in writing the results of the monitoring of performance in accordance with the Monitoring Plan on a quarterly basis for five (8) years following the commencement of use. 79.3. The applicant shall prepare a Water Quality Ecosystem Monitoring Plan providing for monitoring of performance against the relevant criteria in the Water Quality Ecosystem Protection EMP, for the maintenance of suitable habitat characteristics for the Wallum Froglet population. The Monitoring Plan shall be to the reasonable satisfaction of the Manager -Land Development and Manager - Environmental Services and shall be provided prior to the application for operational works. The applicant shall report to the Council in writing the results of the monitoring of performance in accordance with the Monitoring Plan on a quarterly basis for five (5) years following the commencement of use. 79.4. The applicant shall prepare a Soil Contamination and Groundwater Protection Monitoring Plan providing for monitoring of performance against the relevant criteria in the Soil Contamination and Groundwater Protection Monitoring EMP, for the achievement of the control strategies of the Stormwater Management Plan in respect to the influence of groundwater on the Wailum Froglet habitat. The applicant shall report to the Council in writing the results of the monitoring of performance in accordance with the Monitoring Plan on a quarterly basis for five (5) years following the commencement of use. 80. The applicant shall commission an independent audit of the Proposed designs and site layout to demonstrate compliance with the EMP by suitably qualified Environmental Auditor. The audit shall conform to ISO 14010 and ISO 14011 - Guidelines for Environmental Auditing and shall be to the Teasonable satisfaction of the Manager - Environmental Services and shall be submitted prior to the issue of a development permit for operational works. 81. The Environmental Management Plan shall incorporate the requirement for monthly environmental Compliance monitoring and annual audit reports to be submitted to the Manager - Land Development for the construction stages of the development. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 81.1. include tables of the monitoring results (digital form should be in Excel); A o:\database\onestap\decision.doc Page 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.