Council archive · source document
SPA Decision - Change to an Existing Approval & Extension to Relevant Period [As Published] · 132003.220721.4
2003/220721
Land Development:
Vehicle Access
13. A vehicular access driveway to serve the development shall be constructed from the Duke
Street frontage of the site with a maximum width of 3.5 metres.
The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
14. All vehicles shall enter and leave the site in a forward direction.
Carparking
15. Carparking shall be provided within the site as shown on drawing number 10.0303.1A dated
March 2003 by Andrew McKellar Design, except as modified herein.
16. A minimum of 4 covered carpark spaces shall be provided on site.
17. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 1 with a minimum head clearance (headroom) at any point of 2.2m.
18. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Roadworks Contributions
19. A roadworks contribution of $1,002 towards the Coastal Major Road Network shall be paid to
the Council prior to the commencement of the use. This amount will be subject to variations in
the Price Index, All Groups Brisbane from March 2003 until the date of payment.
Frontage Works
20. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Duke Street frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
21. A new 1.2 metre wide concrete path shall be constructed along the Duke Street frontage of the
site in accordance with Council’s design standards and to a meandering alignment. Care shall
be taken to protect any significant vegetation or any underground services.
Stormwater Drainage
22. All stormwater drainage shall be collected on site and discharged to Council’s existing
drainage structures in Duke Street. In this regard, plans shall be prepared by a Registered
Professional Engineer (specialising in hydraulics and hydrology) and submitted to Council
prior to obtaining a Development Permit for Operational Works.
23. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
24. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
25. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
26. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units are served by a single service, multiple water meters to
each individual unit shall be installed. All fees for the supply of water meters shall be paid to
the Council.
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision - Change to an Existing Approval & Extension to Relevant Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.