SPA Decision - Change to an Existing Approval & Extension to Relevant Period [As Published] · 132003.220721.4
2003/220721
Service Easements
27. A registered easement shall be created over the existing sewer main that crosses the northern
portion of the site. The easements shall generally be parallel to and centred over the sewer
main and be equivalent in width to twice the depth to invert level of the sewer at the deepest
point within the allotment (measured from the finished surface) and be no less than 3.0 metres
wide.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
28. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s underground
must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1 metre below a
line of influence measured 1 metre in the direction of the foundation from the centreline of the
closest underground service and along the natural angle of repose of the foundation soil
type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed by
a registered practising Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Headworks
29. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of March 2003 under the current policies is as follows:
Water Supply $3,635
Sewerage $2,745
TOTAL $6,380
All headworks contributions must be paid prior to the commencement of the use. Alternatively
a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full. In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the contribution or trading bank guarantee will be returned.
Erosion and Sediment Control
30. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Please note that prior to the commencement of any work on site all site control measures shall
be installed and the approved plan adhered to.
Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision - Change to an Existing Approval & Extension to Relevant Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.