31. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
32. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
33. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
34. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers.
35. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
36. Air conditioning units shall be located in a manner which prevents noise nuisance beyond the
subject land in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. On the spot fines
apply for such offences.
36.1. An occupier of premises where there is air-conditioning equipment must not use or
allow the use of the equipment -
36.2. before 7am or after 10pm on any day if it makes noise or causes noise to be made of
more than the higher of the following -
36.2.1. 40 dB(A)
36.2.2. 3 dB(A) above the background noise level
36.3. from 7am to 7pm on any day if it makes noise or causes noise to be made of more than
the lower of either of the following -
36.3.1. 50 dB(A)
36.3.2. 5 dB(A) above the background noise level
36.4. from 7pm to 10pm on any day if it makes noise or causes noise to be made of more
than 3 dB(A) above the background noise level.
Building
37. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to
be submitted to Council at the time of foundation inspection or immediately thereafter. Such
survey shall set out the boundaries of the site and the position of the buildings on the site.
38. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
minimum required floor level and the maximum building height above natural surface, required
by the provisions of the Planning Scheme.
Additional Condition
39. The Pool is to be isolation fenced in accordance with the requirements of AS 1926.1 and the
Building Act. Direct Access from either dwelling to the pool enclosure is not permitted.
Page 5 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision - Change to an Existing Approval & Extension to Relevant Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.