Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Attachment F - Engineering Report

of 118

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                     Gross Pollutants Vs Peak Intensity

                           200
    Gross Pollutant Load




                           150
            (Kg)




                           100                                        y = 100.4Ln(x) - 45.189
                                                                            R2 = 0.6655
                           50

                            0
                                 0           2              4             6              8      10
                                              Peak Rainfall Intensity (mm/6 min)

                                       Figure 6: Gross Pollutants and Peak Intensity.

Removal Volumes
Allison at the CRC suggests gross pollutants have a mass density (wet) of 250 kg/m3.
However the Enviropod retains captured material in a dry (damp) state with voids
between retained particles. During the study the level of fullness and weight of each
Enviropod was recorded at each service. A type A1 Enviropod contains 0.142 m3 of
storage. During the study it was recorded that the weights of a full type A1 Enviropod
were between 9 and 32 kg. Assuming a conservative value of 25 kg this gives an in-situ
density of 176 kg/m3.

Equating this to the total load removed over the year (10.5 tonnes) this equates to 60m3
of material was removed from the Blackbutt creek catchment or 3.5 m3/ha/yr. The
volume of material entrained in urban runoff is a important factor in determining the
appropriate sizing of a stormwater treatment device

Using this in-situ density, the following volume curve is derived Figure 7. In Blackbutt
Creek there are 80 Enviropods with a total storage volume of 8.6 m3, installed over a
total catchment area of 17.2 hectare. This equates to approximately 0.5m3 of storage for
each hectare. Assuming an Enviropod should be cleaned when it is 2/3 full, the
Enviropods should be cleaned after approximately 100mm of rainfall. This analysis
could be carried out on each sub-catchment to determine the most accurate frequency or
even on individual Enviropods. Ideally a rain gauge could be mounted within the
catchment to aid determination of cleaning frequency.




                                                            13
Log in to download the original file

RFI - Attachment F - Engineering Report.pdf · 15.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.