SCG) consulting EnGineers WORKING FOR YOUR PROJECTS SUCCESS STORM WATER MANAGEMENT PLAN Address Client Date Report No p 07 5455 5604 f 075455 5696 @ [email protected] www.scg-engineers.com po box 1661 noosa heads qld 4567 unit 1/11 project ave noosaville qld 4566 Debuild Pty Ltd Tradingas ABN 40098 481 899 : 4 Crank Street Sunshine Beach :S Lehmann : 21 March 2014 : 24056(SWM) STRUCTURAL * CIVIL * GEOTECHNICAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
1.0 INTRODUCTION: SCG Consulting Engineers have been commissioned to provide a Storm Water Management Plan for the proposed development at 4 Crank St, Sunshine Beach. The objective of this plan is to demonstrate that the following measures will be incorporated into the design and construction of the development:- e Maintain stormwater quality — Protect receiving waters e Manage storm water rates of runoff and existing flow path characteristics e Protect against flooding e Adopt Water Sensitive Urban Design (WSUD) principles throughout. This report should be read in conjunction with our detailed site plan (attached) drawing (No.) 24056- C4. Referenced Documentation:- Queensland Urban Drainage Manuai 2006 Water by Design - Deemed to Comply Solutions Stormwater Quality Management S.E. Queensland Sunshine Coast Regional Council - Planning Scheme Policy No. 5 Sunshine Coast Regional Council - Manual for Erosion and Sediment Control 2.0 SITE DESCRIPTION: The allotment is described as Lot 430 on RP48112 and is within Noosa Shire Council. It is fronted by Crank Street, Sunshine Beach. The allotment is currently vacant. The existing ground slope within the allotment falls towards Crank Street. Council records indicate stormwater infrastructure in close proximity to the allotment. The allotment is served by Council/Unitywater sewerage infrastructure. SCG CONSULTING ENGINEERS 2 SCG Ref: 24056(SWM)
Page 3
Losta Noosa Espresso Y1) Frateltini . Sunshine Beach Walker cz & Beck a z D Classic Malibu a The Od Webb fig 3.0 PROPOSED DEVELOPMENT: A duplex development (2 units) is proposed for the allotment. The proposals are in sketch detail provided by the client. 4.0 OBJECTIVES: 4.1 STORMWATER QUALITY: The following factors have been identified as potential contributors which can adversely effect stormwater quality draining from the site:- « Silt and sediment erosion « Hydrocarbon runoff « Nutrient runoff 4.1.1. SILT AND SEDIMENT EROSION: A potential for sediment mobilization/transportation exists during and beyond the construction of the proposed development. This can elevate Turbiltiy lebels of stormwater runoff. SCG CONSULTING ENGINEERS 3 SCG Ref: 24056(SWM)
Page 4
A RUSLE assessment of the site confirms proposed development is a Low Risk for soil loss (< 150 Tonnes). Potential Causes Stormwater scour and erosion of excavated or stripped surfaces and stockpiled soils Disturbance/breakup of soil profile via vehicular traffic followed by stormwater scour and erosion Mitigating Measures Construction of silt fences around the development site located to cut off all runoff Provide 80-100mm crushed rock (no fines) hardstand under all vehicle paths expected during construction. Generally this would be provided from the existing crossover and extended to a distance within the site that would accommodate the maximum delivery vehicle length expected Where possible maintain existing landscaping/grasses downslope from construction areas to act as buffer/silt trap Install temporary downpipes from completed roof structures and ensure runoff passes through silt fences. Minimise concentrating surface flows. 4.1.2 HYDROCARBON RUNOFF: Hydrocarbons can be mobilised and transported in stormwater runoff from the site. This can contaminate stormwater runoff compromising Water Quality Objectives. Potential Causes Leaks from parked vehicles within the completed development Washing of vehicles within the completed development. Mitigating Measures Drain driveways and parking areas through inground soakage pits. 4.1.3. NUTRIENT RUNOFF: Nutrients such as Nitrogen and Phosphorus can be mobilized and transported in Stormwater runoff from the site. This can compromise Water Quality Objectives. Potential Causes Detergents used in car washing and similar activities Fertilisers used in propagation of landscaped areas Embodied nutrients contained in silt (topsoil) runoff SCG CONSULTING ENGINEERS 4 SCG Ref: 24056(SWM)
Page 5
4.2 4.2.1 Mitigating Measures e Capture runoff from areas used for car washing and divert through inground soakage -pits e implement management plan for landscaping propagation. Use stable organically bound fertilizers cultivated immediately prior to turf placement. Mulch over areas of exposed topsoil « Construction of silt fences during construction and maintained beyond completion of landscaping MAINTAIN EXISTING STORMWATER RATES OF RUNOFF: MAINAGE STORMWATER RATES OF RUNOFF AND EXISTING FLOW PATH CHARACTERISTICS: The allotment us currently vacant. The proposed development will increase the impermeable area of the site leading to a possible increase in the rate of stormwater runoff. The following factors are noted:- Pre-Development sub-catchments Post Development sub-catchments Pervious Area 370 m? Pervous Area 282 m? Impervious area 450 m* Impervious area 238 m? TOTAL 520 m? TOTAL 520 m? STORM DATA Time of Concentration 5 min 10 yr 1 hr Storm! 70 mm/hr 5min Rainfall Intensities 10yr 220 mm/hr 20yr 250 mm/hr 100yr 320 mm/hr Coefficient of Runoff Fraction Impervious Cro Coo Cro0 Pervious Area* 0 0.7 0.74 0.84 Impervious Area 1 0.9 0.95 1.00 *Pervious area considered good grass cover with med. Soil permeability as per QUDM Q=CxIxA/360 Q - Pre-Development Q - Post-Development INCREASED ARI Pervious Imperv. TOTAL Pervious Imperv. TOTAL RUNOFF 10 0.0158 0.0094 0.0252 m¥/s | 0.0121 0.0131 0.0252 m/s] 0.0000 mis 20 0.0189 0.0099 0.0288 _mi/s 0.0144 0.0156 0.0300 m/s] 0.0013 m/s 100 0.0276 0.0133 0.0410 mvs 0.0211 0.0212 0.0422 m/s} 0.0013 m/s SITE RUNOFF COEFFICIENTS ARI Pre Development Post Development 10 0.79 0.79 20 0.80 0.83 100 0.89 0.91 SCG CONSULTING ENGINEERS SCG Ref: 24056(SWM)
Page 6
Using these figures calculated peak runoff of volumes for a storm with an Average Recurrance Interval (ARI) of 100yrs are as follows:- Pre Development Qo = 41 It/s Post Development Q199 (undetained) = 42.2 Itls Peak Flow Increase = 1.2 Its Peak flow increases will be minor. The use of infiltration pits and water storage tanks will offset this increase in peak runoff volumes. 4.2.2. MANAGE ALLOTMENT AND CROSS ALLOTMENT FLOWS: From the existing surface contours, runoff from the site travels from the rear of the allotment towards Crank Street. A series of townhouses exists at the rear of the allotment. These drain along a driveway adjacent the common boundary towards Crank Street. This ensures no cross allotment flows occur for the allotment. 43 MANAGE WATER DEMAND: A 5000It tank is proposed which will serve WC'’s and External Hose Cocks for irrigation purposes only. The tank are to be fitted with a switchover device which provides mains water supply when the tank volumes dropped to pre-determined levels. 4.4 PROTECT AGAINST FLOODING: Noosa Shire Council's major flood overlay map confirms the allotment is not prone to flooding. 5.0 CONCLUSION: The measures proposed in this report demonstrate that the development can incorporate Water Sensitive Urban Design principles into it’s construction and on-going use. The development will contribute positively to the built environment that will contain it. For and on behalf of SCG CONSULTING ENGINEERS Attachment: Drawing (No.) 24056 — C4 SCG CONSULTING ENGINEERS 6 SCG Ref: 24056(SWM)
Used in these records
4 CrankSt_24056(SWM) - 21.03.2014.pdfRelated documentApplication case desk ↗
About this file
- File size
- 756 KB (small file)
- File type
No other editions are linked here.