Council archive · source document
4 CrankSt_24056(SWM) - 21.03.2014 · MCU14/0006
Attached to the e-mail MCU14/0006 Information Response (various of emails).
1.0 INTRODUCTION: SCG Consulting Engineers have been commissioned to provide a Storm Water Management Plan for the proposed development at 4 Crank St, Sunshine Beach. The objective of this plan is to demonstrate that the following measures will be incorporated into the design and construction of the development:- e Maintain stormwater quality — Protect receiving waters e Manage storm water rates of runoff and existing flow path characteristics e Protect against flooding e Adopt Water Sensitive Urban Design (WSUD) principles throughout. This report should be read in conjunction with our detailed site plan (attached) drawing (No.) 24056- C4. Referenced Documentation:- Queensland Urban Drainage Manuai 2006 Water by Design - Deemed to Comply Solutions Stormwater Quality Management S.E. Queensland Sunshine Coast Regional Council - Planning Scheme Policy No. 5 Sunshine Coast Regional Council - Manual for Erosion and Sediment Control 2.0 SITE DESCRIPTION: The allotment is described as Lot 430 on RP48112 and is within Noosa Shire Council. It is fronted by Crank Street, Sunshine Beach. The allotment is currently vacant. The existing ground slope within the allotment falls towards Crank Street. Council records indicate stormwater infrastructure in close proximity to the allotment. The allotment is served by Council/Unitywater sewerage infrastructure. SCG CONSULTING ENGINEERS 2 SCG Ref: 24056(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
4 CrankSt_24056(SWM) - 21.03.2014.pdfRelated documentApplication case desk ↗
About this file
- File size
- 756 KB (small file)
- File type
No other editions are linked here.