Original source · versioned page text
SUPERSEDED - Decision Notice OPW26 0033 (As Published)
PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
Certification
73. Upon completion of the work:
a. a certificate must be issued to Council by an RPEQ certifying that the works have been
constructed in accordance with the Operational Works permit; and
b. a condition report of the drainage system must be issued to Council. The report must
include a CCTV inspection of the new stormwater network commencing from “1/A” and
concluding at “8/A” and include all new branches.
As Constructed Plans and ADAC XML Files (Council)
74. Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
“As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
information shall include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
prepared in accordance with industry standards and recorded in “MGA - UTM56 /
GDA94” projection.
Please Note: Further information and advice relating to the as-constructed drawing
presentation, as-constructed survey capture and associated guidelines for preparation
of a compliant ADAC XML digital file are available on the webpage titled “As-
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.
c. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
information, levels and applicable survey datum.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards” and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only.
On Maintenance
75. All municipal works must be accepted as ‘On Maintenance’ by Council in accordance with
Council’s Planning Scheme Policy 6 prior to plan sealing.
To achieve ‘On Maintenance’ status:
a. the supervising RPEQ must submit to Council for review and acceptance:
i. certification that all works have been undertaken and completed in accordance
with the requirements of this approval;
Page 15 of 21
Document Set ID: 25057225
Version: 2, Version Date: 14/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (SUPERSEDED - Decision Notice OPW26 0033 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.