Technical Memorandum
51 Elanda Street Stormwater Management Plan Addendum

Client: Archend
Council: Noosa Shire Council
Document reference: 51 Elanda Street- Response to Council information request
Prepared By: Adam Young
Signed: Eoin Whitmore RPEQ: 31423
Date: 26/09/2025



Purpose

This technical memorandum has been prepared in response to Council’s Further Advice Request for
application MCU24/0153, OPW24/0202, and PLM24/0024 at 51 Elanda Street, Sunshine Beach. The
purpose of this memo is to address the issues raised by Council and provide a detailed response to
ensure the resolution of outstanding matters related to the civil scope of works.

As part of this submission, amended Operational Works plans have been attached. These plans have
been updated to reflect the responses outlined in this memorandum and demonstrate compliance
with the relevant requirements.


Issue – Updated Stormwater Engineering Drawings and Report
Amended plans and associated reports must be submitted to Council prior to any further
development applications being made and must include the following to the reasonable
satisfaction of the Manager, Development Assessment:
1.1. Provide updated stormwater and engineering drawings including:
a. Additional detail demonstrating that the post-development peak flow rate
discharging to structure “7/1” does not exceed the pre-development peak flow
rate. The detail must clearly demonstrate that the development and calculations
incorporate appropriate climate change allowances in accordance with AO2.4 of
the Water Quality and Drainage Code.
b. Additional detail confirming an appropriate climate change allowance has been


T 1300 469 707 U WWW.RECOR.AU
                                                                                         PAGE 1 OF 7
Log in to download the original file

REPS - Technical Memorandum.pdf · 671 KB (small file)

Full text of the other 6 pages

Page 2

applied to the sizing of all detention tanks.
c. A stormwater design calculation table.
d. Details of detention outlet orifices / controls.
f. Prepared by a suitably qualified person (RPEQ)

RECOR RESPONSE:

A 12d Model drainage analysis was conducted for the entire site. The 1% AEP (Q100) and 10% AEP
(Q10) hydraulic grade lines (HGLs) are presented in the stormwater long section plans for reference.

The site drainage and detention/ rainwater harvesting tanks have been modelled in 12d using the
ILSAX method of dynamic drainage analysis. All rainfall data was obtained from the Bureau of
Meteorology (BOM) Intensity-Frequency-Duration (IFD) data website and is based on the latest 2019
data. The rainfall data obtained was then multiplied by a factor of 1.2 to simulate an increase of 20%.
Refer tables 1 and 2 below for the original and climate change adjusted rainfall data.

Table 1: IFD Table


    Annual Exceedance Probability (AEP)

    Duration                              63.2%   50%#   20%*   10%      5%       2%       1%

    1 min                                 173     195    263    308      351      405      446

    2 min                                 147     167    230    273      316      375      420

    3 min                                 138     157    215    254      293      346      386

    4 min                                 131     149    203    239      275      321      357

    5 min                                 125     142    193    227      259      301      333

    10 min                                103     116    155    181      205      236      259

    15 min                                87.0    98.1   132    153      174      199      218

    20 min                                76.0    85.7   115    134      152      175      192

    25 min                                67.8    76.5   103    120      137      158      173

    30 min                                61.4    69.3   93.5   109      125      144      159

    45 min                                48.6    55.0   74.9   88.2     101      118      131

    1 hour                                40.8    46.3   63.5   75.2     86.5     102      113

    1.5 hour                              31.7    36.1   50.2   59.8     69.4     82.2     92.2

    2 hour                                26.5    30.3   42.4   50.8     59.2     70.6     79.5

    3 hour                                20.5    23.6   33.5   40.4     47.4     56.9     64.4

    4.5 hour                              16.0    18.4   26.5   32.2     37.9     45.8     52.0

    6 hour                                13.4    15.5   22.5   27.4     32.4     39.2     44.6




2

Page 3

9 hour 10.5 12.2 17.8 21.8 25.9 31.5 35.9
12 hour 8.78 10.3 15.1 18.6 22.1 26.9 30.7
18 hour 6.85 8.02 11.9 14.7 17.5 21.4 24.6
24 hour 5.71 6.70 9.96 12.3 14.8 18.2 20.9
30 hour 4.95 5.80 8.65 10.7 12.9 15.9 18.3
36 hour 4.38 5.14 7.68 9.54 11.5 14.2 16.4
48 hour 3.60 4.22 6.31 7.87 9.50 11.8 13.7
72 hour 2.68 3.14 471 5.89 7.14 8.98 10.5
96 hour 2.16 2.52 3.78 4.73 5.76 7.26 8.52
120 hour 1.81 2.12 3.17 3.97 4.83 6.10 7.16
144 hour 1.57 1.83 ae) 3.42 4.16 5.24 6.15
168 hour 1.39 1.62 2.41 3.01 3.65 4.59 5.37

Table 2: IFD Table - Rainfall intensities with 20% increase

Annual Exceedance Probability (AEP)

Duration 63.2% 50%# 20%* 10% 5% 2% 1%
1min 207.6 234 315.6 369.6 421.2 486 535.2
2 min 176.4 200.4 276 327.6 379.2 450 504
3 min 165.6 188.4 258 304.8 351.6 415.2 463.2
4min aia 178.8 243.6 286.8 330 385.2 428.4
Smin 150 170.4 231.6 272.4 310.8 361.2 399.6
10 min 123.6 139.2 186 217.2 246 283.2 310.8
15 min 104.4 117.72 158.4 183.6 208.8 238.8 261.6
20 min 91.2 102.84 138 160.8 182.4 210 230.4
25 min 81.36 91.8 123.6 144 164.4 189.6 207.6
30 min 73.68 83.16 112.2 130.8 150 172.8 190.8
45 min 58.32 66 89.88 105.84 121.2 141.6 157.2
1 hour 48.96 55.56 76.2 90.24 103.8 122.4 135.6
1.5 hour 38.04 43.32 60.24 71.76 83.28 98.64 110.64
2 hour 31.8 36.36 50.88 60.96 71.04 84.72 95.4
3 hour 24.6 28.32 40.2 48.48 56.88 68.28 77.28
4.5 hour 19.2 22.08 31.8 38.64 45.48 54.96 62.4
6 hour 16.08 18.6 27 32.88 38.88 47.04 53.52

Page 4

    9 hour                                      12.6      14.64       21.36       26.16     31.08   37.8     43.08

    12 hour                                     10.536    12.36       18.12       22.32     26.52   32.28    36.84

    18 hour                                     8.22      9.624       14.28       17.64     21      25.68    29.52

    24 hour                                     6.852     8.04        11.952      14.76     17.76   21.84    25.08

    30 hour                                     5.94      6.96        10.38       12.84     15.48   19.08    21.96

    36 hour                                     5.256     6.168       9.216       11.448    13.8    17.04    19.68

    48 hour                                     4.32      5.064       7.572       9.444     11.4    14.16    16.44

    72 hour                                     3.216     3.768       5.652       7.068     8.568   10.776   12.6

    96 hour                                     2.592     3.024       4.536       5.676     6.912   8.712    10.224

    120 hour                                    2.172     2.544       3.804       4.764     5.796   7.32     8.592

    144 hour                                    1.884     2.196       3.276       4.104     4.992   6.288    7.38

    168 hour                                    1.668     1.944       2.892       3.612     4.38    5.508    6.444




The below table shows the climate change adjusted Pre-Development Catchment Runoff estimations
provided in the original SCCE SMP prepared in November 2024.

Table 3: Predevelopment site discharge (m3/s)

                           Flow Event                   Existing Scenario(m³/s)
                         Q10 (10% AEP)                           0.040
                          Q1 (1% AEP)                            0.062
The following unmitigated post-development flow results were derived from the 12d model which
was run with the climate change adjusted rainfall data in Table 2 Above.

Table 4: Unmitigated post-development site discharge – adjusted for climate change (m3/s)

                             Flow Event             Climate Change Incl. (m³/s)
                          Q10 (10% AEP)                       0.050
                            Q1 (1% AEP)                       0.084
The following mitigated post-development flow results were achieved with the use of an onsite
detention tank

Table 5: Mitigated post-development site discharge -adjusted for climate change (m3/s)

                                    Flow Event                        Climate Change Incl. (m³/s)
                                   Q10 (10% AEP)                                0.035
                                    Q1 (1% AEP)                                 0.057




4

Page 5

Table 6: Detention Tank Parameters

    Detention Tank Parameters
    Tank Volume                                        5.0m³
    Storage Volume                                     4.8m³
    Area                                               5.0m²
    Base RL                                            42.849m
    AEP1% max. water level RL                          43.807m
    AEP1% max. water level depth                       0.958m
    Orifice plate outlet diameter                      150mm
    Outlet pipe diameter                               225mm
    Orifice plate outlet control RL (middle of pipe)   42.924m


The 12d dynamic inflow and outflow outputs for the rainwater harvesting tank (structure 213) and
the detention tank (structure 6-1) are below:

AEP10%

Table 7: Structure 2-3 AEP10% inflows and outflows




5

Page 6

Table 8: Structure 6-1 AEP10% inflows and outflows




AEP1%

Table 9: Structure 2-3 AEP1% inflows and outflows




6

Page 7

Table 10: Structure 6-1 AEP1% inflows and outflows




In both the major and minor events, the climate change adjusted post development flows have been
effectively mitigated such that the outflows to the existing stormwater network are lower than the
predevelopment flow. It is therefore confirmed that Acceptable Outcome 2.4 of the water quality
and drainage code has been achieved.

The model also confirms that there is sufficient capacity in the external pit to take all flows from the
development. We trust that this Technical Memorandum, in conjunction with the amended civil
drawings, is sufficient to evidence to council that the stormwater quantity measures have been
designed to mitigate the 20% increase in rainfall allowing for climate change.

All other engineering items within the Decision Notice for application OPW24-0202 dated the 11th of
August 2025, have been addressed within the engineering drawings.

Please contact the undersigned for any further clarifications:

    ➢ Email- [email protected]
    ➢ Phone- 0451453640.




Eoin Whitmore, Associate Engineer
RPEQ Number: 31423
Date: 26/09/2025




7

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.