REPS - Technical Memorandum
applied to the sizing of all detention tanks.
c. A stormwater design calculation table.
d. Details of detention outlet orifices / controls.
f. Prepared by a suitably qualified person (RPEQ)
RECOR RESPONSE:
A 12d Model drainage analysis was conducted for the entire site. The 1% AEP (Q100) and 10% AEP
(Q10) hydraulic grade lines (HGLs) are presented in the stormwater long section plans for reference.
The site drainage and detention/ rainwater harvesting tanks have been modelled in 12d using the
ILSAX method of dynamic drainage analysis. All rainfall data was obtained from the Bureau of
Meteorology (BOM) Intensity-Frequency-Duration (IFD) data website and is based on the latest 2019
data. The rainfall data obtained was then multiplied by a factor of 1.2 to simulate an increase of 20%.
Refer tables 1 and 2 below for the original and climate change adjusted rainfall data.
Table 1: IFD Table
Annual Exceedance Probability (AEP)
Duration 63.2% 50%# 20%* 10% 5% 2% 1%
1 min 173 195 263 308 351 405 446
2 min 147 167 230 273 316 375 420
3 min 138 157 215 254 293 346 386
4 min 131 149 203 239 275 321 357
5 min 125 142 193 227 259 301 333
10 min 103 116 155 181 205 236 259
15 min 87.0 98.1 132 153 174 199 218
20 min 76.0 85.7 115 134 152 175 192
25 min 67.8 76.5 103 120 137 158 173
30 min 61.4 69.3 93.5 109 125 144 159
45 min 48.6 55.0 74.9 88.2 101 118 131
1 hour 40.8 46.3 63.5 75.2 86.5 102 113
1.5 hour 31.7 36.1 50.2 59.8 69.4 82.2 92.2
2 hour 26.5 30.3 42.4 50.8 59.2 70.6 79.5
3 hour 20.5 23.6 33.5 40.4 47.4 56.9 64.4
4.5 hour 16.0 18.4 26.5 32.2 37.9 45.8 52.0
6 hour 13.4 15.5 22.5 27.4 32.4 39.2 44.6
2