Asset Management Plan: Parks and Playgrounds Page 23
Page 31 of 86
vos a Ee SERVICE LEVEL TARGET
When the playground inspection is done a quick visual scan is also done of the immediate area to pick up any
&pparent maintenance issues. Similarly where @ reactive maintenance request is received the same visual checks
occur.
Essentially this resufts in 8 higher level of inspection than captured in Council's systems.
>yche inspections Developed Ps Inspectic 5 month lormal spect program
(except for Noosaville Foreshore
which ts inspected by the Roads
Landscaping crew at same frequency
88 program for road landscaping
activities).
Note: The six monthly inspection is
based on 8 checklist that covers
landscaping, trees, turf and hard
infrastructure items (other than
Playgrounds which have a different
nes feet
Playgrounds — Priority locations Fortnightly
Note:
Exceptions that are not captured in
the Asset Management system:
e Pirate Park, Noosaville (Almost
daily in peak periods of use)
. Skate facility, Peregian Beach
(Twice weekly)
Playgrounds — comprehensive
(detailed check/bolts
removed/foundations checked etc.)
WHS inspections:
~ Botanical Gardens
~ Tewantin Splash Park
Scheduled work Generall as identified 0 inspections o nased on site conditic
Special Precincts - Wedding groves
(5 sites at Main Beach, Noosa Twice weekly (contract work)
Coconut trees at Noosaville Twice yearly (not a documented
Foreshore, Noosa Heads Main inspection regime)
Beach & Noosa Waters (remove
flowering sterns/fruit)
Asset Management Plan: Parks and Playgrounds Page 23
Page 31 of 86See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.