Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Meeting papers

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Asset Management Plan: Parks and Playgrounds   Page 24

                                                 Page 32 of 86

ACTIVITY                                SERVICE LEVEL TARGET

   Cyclic Inspections           Turf maintenance (mowing) contract Monthly — based on approx. 30 sites
                                                                generated ad hoc by Work Order
                                                                system.
                                 Open space cleaning contracts   Mont
                               fem
    Scheduled 0                       : lenance mowing contract)> atege 1 — 32 cuts (very hag orotile
                                                                — only 2 parks sites)
                                                                Category 2 - 22 cuts per annum (high
                                                                profile areas)
                                                                Category 3 — 18 cuts per annum
                                                               (local roads/rural)
                                                               Category 4 -— 10 cuts per annum (site
                                                                specsfic)
                                Cleaning & litter pick-up (includes
                               85Q cleaning
                                Peregian Beach; Sunshine Beach;
                               Sunrise Beach; Noosa Junction
                               Noosa Heads; Noosaville & Tewantin
                                commercial area precincts

                               Boreen Point & Cooroy - commercial | 3 x week
                               area precincts
                               Cooran & Kin Kin - commercial area 2x week
                                precincts
                                SSB Skatepark — cleaning & bins
                                emptied
    ————                       See
    requests]
                               Graffit / Vandalism              10 business days
                                Note: Counci endorsed Graffiti Policy
                               dsted 24 August 2014 provides that
                               upon notification of 8 graffit! incident a
                               graded approach is taken to removal:
                                   - Obscene, racist & other    24 hours
                                      offensive material
                                   - Large areas of graffiti or in 3 business days
                                      nightly visible
                                   - Minor graffiti incidents   14 business days
                               a a

Asset Management Plan: Parks and Playgrounds                                                   Page 24
                                                                                                  Page 32 of 86
Log in to download the original file

81be2e7c69.pdf · 6.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.