Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2022-02-14 General Committee Meeting Agenda

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 14 February 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-02-14 General Committee Meeting Agenda(PDF, 14MB).pdf · 14.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 80 (of 99)

Section 2

GENERAL COMMITTEE MEETING AGENDA                              14 FEBRUARY 2022


TABLE OF CONTENTS

ITEM                                                                      PAGE

1      ATTENDANCE & APOLOGIES                                                 3

2      CONFIRMATION OF MINUTES                                                3

3      PRESENTATIONS                                                          3

4      DEPUTATIONS                                                            3

5      ITEMS REFERRED FROM COMMITTEES                                         4

       1    PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY FOR
            NOVEMBER & DECEMBER 2021                                           4

       2    REFER TO CLOSED SESSION AT ITEM 7 – (REPORT 10)              4

       3    2021 DELEGATIONS OF AUTHORITY ANNUAL REVIEW                        4

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                    5

       4    30 TOULAMBI STREET, NOOSA HEADS DESCRIBED AS LOT 15 RP129286 -
            SITE INVESTIGATION FOR SOCIAL HOUSING AND MEMORANDUM OF
            UNDERSTANDING WITH COMMUNITY HOUSING PROVIDER                      5

       5    MCU21/0162 - APPLICATION FOR A MATERIAL CHANGE OF USE – COMMUNITY
            USE (SURF MUSEUM), FOOD AND DRINK OUTLET, INDOOR SPORT AND
            RECREATION AND OFFICES AT 3 HILTON TERRACE, TEWANTIN            23

       6    ORGANISATIONAL STRUCTURE                                         38

       7    COUNCILLOR REPRESENTATION ON COUNCIL OF MAYORS WORKING
            GROUPS                                                           53

       8    FINANCIAL PERFORMANCE REPORT – JANUARY 2022                      57

       9    OPERATIONAL PLAN PROGRESS REPORT – SECOND QUARTER 2021-22        70

7      CLOSED SESSION                                                  99

       10   MCU21/0013 & OPW21/0031 – PLANNING & ENVIRONMENT
            COURT APPEAL NO. BD2677 OF 2021 – REFUSAL OF AN APPLICATION FOR
            MULTIPLE DWELLING UNITS (19 UNITS), FOOD & DRINK OUTLET, INDOOR
            SPORT & RECREATION, HEALTH CARE SERVICE, OFFICE & OPERATIONAL
            WORKS AT 30-32 DOONELLA ST, TEWANTIN                            99




                                                                    Page 2 of 99

Section 3

GENERAL COMMITTEE MEETING AGENDA                                      14 FEBRUARY 2022


1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES

     The Minutes of the General Committee Meeting held on 17 January 2022 be received and
     confirmed.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS


     1.     DAVID MCCREADY, GOETZ VON SCHWEINFURTH & JAN DAVEY
            Topic:   30 Toulambi Street Zoning to Environmental Management & Conservation
                     Zone




                                                                             Page 3 of 99

Section 4

GENERAL COMMITTEE MEETING AGENDA                                           14 FEBRUARY 2022


5.   ITEMS REFERRED FROM COMMITTEES


     PLANNING & ENVIRONMENT COMMITTEE


     1   PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY FOR
         NOVEMBER & DECEMBER 2021
         (Planning & Environment Committee Agenda, 08 February 2022, Item 5, Page 67)
         Reason for referral – for further consideration.



     2   REFER TO CLOSED SESSION AT ITEM 7 – (REPORT 10)



     SERVICES & ORGANISATION COMMITTEE


     3   2021 DELEGATIONS OF AUTHORITY ANNUAL REVIEW
         (Services & Organisation Committee Agenda, 08 February 2022, Item 1, Page 4)
         Reason for referral – significance of the issue.




                                                                                   Page 4 of 99

Section 5

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


6.    REPORTS DIRECT TO GENERAL COMMITTEE


4     30 TOULAMBI STREET, NOOSA HEADS DESCRIBED AS LOT 15 RP129286 - SITE
      INVESTIGATION FOR SOCIAL HOUSING AND MEMORANDUM OF UNDERSTANDING
      WITH COMMUNITY HOUSING PROVIDER

Author            Glen Conforti, Senior Strategic Planner
                  Environment and Sustainable Development Department

Index             ECM/ Subject/ Noosa Plan 2020

Attachments       1.   Ecological Values Report (60 page attachment provided separately to this
                       agenda)
                  2.   Hydrology Overview


EXECUTIVE SUMMARY
The report is to provide preliminary site investigation results of 30 Toulambi Street, Noosa Heads
for social housing and formalise with Coast2Bay Housing Group a willingness to collaborate and
explore opportunities for social housing on Council owned land through a Memorandum of
Understanding (MOU).
At December 2021 Council Ordinary meeting Council resolved to endorse the Housing Needs
Analysis (HNA), which comprehensively outlines the current housing challenge Noosa faces. The
HNA identified a number of opportunities for Council to consider including the investigation for use
of Council owned property for social housing outcomes, specifically;
•     30 Toulambi St, Noosa heads and
•     62 Lake Macdonald Drive, Cooroy.
This report provides the results of the initial investigations into 30 Toulambi Street site. The Lake
Macdonald site is much larger and requires significantly more investigation. A further report to
Council will occur once investigations on 62 Lake McDonald Drive are further advanced.
The investigations of 30 Toulambi Street, Noosa Heads finds the site has constraints in relation to
vegetation, hydrology, bushfire, slope and community ownership of the lot being considered by
neighbours to be part of Pinaroo Park.
It is found the site, while some weeding is done by residents/neighbours and is home to a small
number of Koala and glossy black cockatoo food trees, is degraded and in part mown to reduce
bushfire risk and has limited ecological value. If development of the site for affordable or social
housing was to proceed, removal of vegetation would occur however offset planting may be
possible nearby in Pinaroo Park or Girraween. Hydrology has been modified and a secondary flow
path traverses the lower corner portion of the lot however it is considered this could be managed
and designed to ensure watershed and stormwater disposal with new development is managed.
Other constraints such as bushfire and slope are not considered major and could also be managed
through the development process.
In terms of the nature of this parcel as a Park, this land as a small park benefits surrounding
residents and is locally valued, whereas social housing is considered to benefit the greater
community. There is however some community concern over the potential for development of
social housing on this site. This concern has been shared with officers and Councillors regarding
this parcel. It is valued by local and surrounding residents as part of Pinaroo Park and contributes
to the local sense of place and liveability for these residents. These issues have been taken into
account in preparing this report.



                                                                                       Page 5 of 99

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022


Further to the above, the flying fox colony adjoining the site has significant impacts on surrounding
residents and Council has had many complaints from residents in the surrounding area regarding
noise, odour and the fear of disease transmission. Delivering housing on the lot would give rise to
more residents living alongside flying foxes, likelihood of more complaints to Council and the need
to increase resources to the Flying Fox Subsidy Scheme. Council has explored many management
strategies of flying foxes within the urban environment with limited success. For these reasons, it
is the Officer’s opinion that the flying fox issue cannot be overcome with a solution and it is not
prudent for Council or good planning to proceed with any further investigations of this site for
housing.
It continues to be very important for Council to continue to advance investigations on other Council
owned sites and explore all opportunities for social and community housing outcomes for its
community. In this regard this report recommends the preparation of a Memorandum of
understanding with Coast2Bay Housing Group is to enable a partnership and collaboration on
delivering social housing in the Shire. The process of engaging with Coast2Bay in this way is in
accordance with Section 236 of the Local Government Regulation 2012 which allows Council to
deal directly with not-for-profit community organisations such as Coast2Bay Housing Group.
RECOMMENDATION
That Council note the report by the Senior Strategic Planner to the General Committee Meeting
dated 14 February 2022 and agree to:
A.    Not proceed with any further investigation at 30 Toulambi Street for social or affordable
      housing;
B.    Resolve to amend the Noosa Plan 2020 by having 30 Toulambi Street included in the
      Environmental Management and Conservation Zone;
C.    Delegate to the Chief Executive Officer to finalise the details of a Memorandum of
      Understanding with Coast2Bay Housing Group to allow collaboration and investigations for
      social housing/affordable housing outcomes on Council owned land and other land or
      opportunities across the Shire.


REPORT
The objectives of this report are to:
1.    Provide Council with the findings of the investigation into the suitability of Council owned land
      at 30 Toulambi Street, Noosa Heads for social housing. The development would be
      commensurate with that of a dwelling house;
2.    initiate a memorandum of understanding with Coast2Bay as confirmation of a partnership in
      exploring social housing outcomes on Council owned land and other land in the Shire. This
      will also allow Coast2Bay to apply for State funding for social and affordable housing as
      opportunities avail;
3.    provide information to Council on potential ground/lands lease structures with a community
      housing provider to deliver social housing on Council owned properties for the Noosa
      community; and
4.    discuss amending the Noosa Plan 2020 to include 30 Toulambi Street, Noosa heads in the
      Environmental Management and Conservation zone.
An investigation for social housing suitability is provided for 30 Toulambi Street, Noosa Heads. The
site is zoned for low density residential under the Noosa Plan 2020 and therefore any proposed
development would be in the form of a dwelling house.
In advance of Council’s consideration of developing an MOU with Coast2Bay, a non-binding letter
of support to Coast2Bay Housing Group has been provided by the CEO which assisted Coast2Bay



                                                                                        Page 6 of 99

Section 7

GENERAL COMMITTEE MEETING AGENDA                                             14 FEBRUARY 2022


to apply for State funding for social housing delivery under the Department of Housing Quick starts
funding program in Noosa. This funding program closed in late January.
Site description
The site is located at 30 Toulambi Street, Noosa Heads bordering the southern boundary of
Pinaroo Park. The following Figures 1 and 2 identify the lot and provide a contour overlay of the
site. The lot contains both non-native and native vegetation and a watercourse is identified within
the Pinaroo Park Bushland Reserve Ecological Restoration Plan traversing the site. These aspects
are further detailed in this report.
A concrete footpath traverses the south west corner of the site with a rock retaining wall located
approximately 6 metres from the front boundary and runs across most of the site. The site is fully
serviced with reticulated water located at Toulambi Street, sewage at the rear north east corner
and stormwater could be disposed of to a lawful point of discharge. Figures 3, 4 and 5 show
services maps. Noting that a reticulated water pump station is located on the neighbouring Council
owned lot 14 (No.32 Toulambi St).




Figure 1 – Site identification




                                                                                     Page 7 of 99

Section 8

GENERAL COMMITTEE MEETING AGENDA       14 FEBRUARY 2022




Figure 2 – Contour plan




Figure 3 - Stormwater infrastructure




Figure 4 – Sewage infrastructure


                                            Page 8 of 99

Section 9

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022




Figure 5 – Reticulated water

1.   Site Background
Council was the owner of the larger parent parcel of land at the time of the original subdivision in
1971 / 1972 and has held title ever since. Historical corporate knowledge suggest that the large
parent parcel was handed over to Council for the failure to pay rates. Council undertook the
subdivision and sold off the lots as a source of income over many years.
The existing rock wall at 30 Toulambi Street was a result of the Pinaroo Park Beautification Project
in the 1980’s. A set of timber stairs were also constructed for the Cooloola Hill pedestrian
catchment to access the Junction. Since that time the timber stairs have been replaced with the
existing concrete footpath.
Superseded planning schemes from 1973 – 2006 zoned the land for residential purposes, where
a dwelling house was permitted. This resulted in the lot being zoned for housing for some 35 years
(1971 – 2006).
The Noosa Plan 2006 changed the zoning to Open Space Conservation as the land had not been
developed and adjoined the Park. This zone did not allow for any type of housing development.
The current Noosa Plan 2020 reverted the zoning back to a Low Density Residential, the equivalent
zoning to which it was for 35 years, as the land is:
•     a free-hold lot owned by Council;
•     historically zoned for residential purpose;
•     separate tenure from the park; and
•     considered suitable for residential purposes, pending investigation.
The zone was changed to Low density Residential and publicly exhibited as part of the second
round of consultation. No submissions were received as a result of this rezoning.
Under the superseded 2006 Panning Scheme, the site was zoned Environmental Protection
however was not affected by the Biodiversity Overlay. However, the Biodiversity Overlay was
introduced to the site in the Noosa Plan 2020 when zoned to Low Density Residential to ensure
that some of the vegetation would be retained where practical.
The site is included in the following documents:
•    Pinaroo Park Management Areas Map (date unknown);
•    Pinaroo Park Bushland Management Plan dated October 2004;
•    Native Plant list - Pinaroo Park dated 2004;
•    Bushfire Management Plan Pinaroo Park dated September 2005;
•    Pinaroo Park Bushland Reserve Ecological Restoration Plan dated March 2017; and
•    Noosa Bushland Reserves Strategic Management Plan 2021 – 2026.

                                                                                      Page 9 of 99

Section 10

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


2.    Site vegetation
Council engaged North Coast Environmental Services to undertake an Ecological Values Report
(EVR) of the site. The report is attached as Attachment 1.
In summary the report found the site contained a mixed open forest single vegetation community
over a disturbed understorey host to native species but also with a high weed presence. No
conservation significant listed plant species under the schedules of the Queensland Nature
Conservation Act 1992 (NC) or the Commonwealth Environment Protection and Biodiversity
Conservation Act 1999 (EPBC) were observed on or immediately bordering the site.
However, the site is home to some Koala food trees (Melaleuca quinquenervia, Eucalypt
propinqua, Corymbia intermedia and Callitris columellaris) and a few individual Allocasuarina trees
were observed onsite. The Allocasuarina trees are glossy black cockatoo food trees. The
vegetation also provides opportunities for other birds, possums and reptiles and potentially foraging
for the neighbouring fly fox colony. Some Koala scratches were observed and possum scats during
a site inspection.
The EVR indicates the site functions as edge habitat to that within Pinnaroo Park and offers an
approximate 40m wide vegetated buffer thereto which has inherently influenced the establishment
of rainforest flora abutting the northern boundary and provided some protection to the greater
Pinaroo Park from urban activities.
The EVR is generally consistent with the Pinaroo Park Bushland Reserve Ecological Restoration
Plan (PPRRP) which indicates the site has some mowed areas and revegetation with non-natives
and weeds extending from the boundary with dumping and plantings in the lot. The PPRRP
indicates there has been some good weeding by residents undertaken and some small areas of
native understorey exist but indicates this lot is a significant source of degradation for the Park.
Environment Operations suggest that the weeding activities by the resident is valuable, some of
the plantings may or not be conducive to the targeted RE 12.2.5, it could also be argued that
landscape infrastructure and hydrology has altered the feasibility of reaching this desired target.
Notwithstanding the site is home to some Koala and a few glossy black cockatoo food trees, the
site is degraded with much of the understorey cleared and a variety of non-natives exists. The
location adjacent to the urban environment, existing infrastructure and modified hydrology make it
difficult to restore the site to the target RE12.2.5.
Pinaroo Park Bush Care Management
Environment operations advises that Pinaroo Park is one of the oldest bushland management sites
in Noosa. Much of Council's activities in the past were focused around supporting the Pinaroo Park
Bushland Care Group. The group formed around 2002 / 2003 essentially from interest in the
reserve from the Rotary Club. The group unfortunately disbanded in 2015 for various reasons.
The Natural Areas team maintain the park to a point where only minimal resources are required.
Environment Operations indicate, if an updated Bushland Operational Assessment (BOA) was
undertaken, it would likely demonstrate a decline in structure and recruitment in the park.
In terms of maintenance, a mowing contract exists on part of the site and fire trail maintenance is
undertaken along private lot boundaries to the west.
Figure 6 shows the mowed areas and fire trial maintenance around and within the site.




                                                                                     Page 10 of 99

Section 11

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022




Figure 6 – Maintenance and mowing of the site. Mowing contract in green and fire trail maintenance
in orange hatched.
Effect of development
It is likely that much of the vegetation would need to be removed to accommodate the development.
Offset planting can be directed next door or nearby in the Park or at Girraween. While it is a loss
of vegetation and provides a buffer to urban activities to the greater Pinaroo Park, it is a small
parcel and is not considered to have significant ecological value.
Revenue from development of the site could go towards improving the vegetation structure and
natural recruitment of the whole park towards reaching target RE12.2.5 as set out in the Pinaroo
Park Bushland Reserve Ecological Restoration Plan.
While offset plantings on the adjoining property may be undertaken to physically replace the
removed vegetation, comparing the loss of the perceived park area to the surrounding residents is
difficult to measure.
3.   Fauna
The understorey is home to a few individual Allocasuarina trees which the EVR indicates may
provide foraging for the Glossy black cockatoo. In terms of the number and size of the trees, while
it is a loss of potential habitat it very minor in scale, and offset plantings could occur nearby.
A flying fox colony is known to exist in Pinaroo Park with roosting occurring near the rear of the
site boundary. The EVR indicates that the vegetation within the lot could offer foraging habitat for
the flying foxes. Flying foxes are a protected species under the Nature Conservation Act 1992.
Flying fox
Environment Services indicates the colony is transient and does not always roost in the Park. The
colony currently has been there since 2015 in numbers ranging from approximately 500 to many
thousands. Last season was especially busy, with flying foxes extending almost the entire length
of the Park. Environment Services indicate customer complaints regarding noise, odour, guano
and fear of disease transmission and specifically, last season 9 complaints were submitted to
Council from residents close to the park.
Council is familiar with impacts of flying foxes on the built environment with residents around
Wallace Park affected for many years now. Council initiated a Flying Fox Subsidy Scheme where
affected residents of Wallace Park, Kin Kin and Pinaroo Park colonies could be supplied with
helpful items such as car covers, washing line covers, solar panel cleaning and a range of other

                                                                                     Page 11 of 99

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                  14 FEBRUARY 2022


options to help live with flying foxes. The cost to Council of this subsidy is approximately $5,000
per year.
Effects of development
It is difficult to manage flying foxes in the urban environment. Council has implemented a range of
methods to try to manage the flying fox colony at Wallace Park. This exercise has been resource
intensive, acknowledges the presence of flying foxes in our community and seeks to manage the
impacts of flying foxes on residents. The methods used to manage the flying foxes are many and
not in the scope of this report.
In this instance many complaints have resulted from the current colony in Pinaroo Park. While it is
unlikely that development itself would adversely affect the colony, additional residents in the area
affected by the colony are likely to give rise to further complaints and concerns. In addition, further
expenditure from the Flying Fox Subsidy Scheme and more Council resources is likely to occur,
given the close proximity of the roost to this lot.
The flying fox colony represents a significant hurdle for residential development which cannot be
overcome. It is not considered prudent or good planning to place more residents in close proximity
to the flying fox colony for the above reasons.
Koala
The site is home to some Koala food trees with scratches from Koalas identified near Eucalyptus
propinqua, but no scats, however, Possum scats were observed. The EVR report indicates the site
represents the end point of the Pinnaroo Park vegetation corridor and whilst it is not expected that
Koalas would travel through the site heading southward, due to lack of suitable habitat beyond the
southern boundary, it is plausible that may access the site as part of their southern range within
the Pinnaroo Park habitat .
Effects of development
It is likely that the majority of the trees on site would be removed with a few retained within the front
6m setback and an odd tree in the side and rear setback areas. In terms of the Koala food trees,
they would be removed. In this case offset planting could occur in the neighbouring 32 Toulambi
Street or at Girraween with large ex-ground food tree species.
4.    Liveability survey
The Noosa Liveability Survey was carried out in November 2021 to gain an understanding of what
people most cared about where they live and how they rated their experience of living in their
neighbourhoods. The survey was undertaken Shire wide and provides statistically representative
data for each location across the Shire.
The top place attribute for the Noosa Heads Community was " Elements of natural environment "
which shows the importance of this attribute in terms of contributing to the overall liveability of
Noosa Heads. This attribute is highly valued (at 85%) and is also performing very well in terms of
peoples experience of this with it scoring 8.9 out of 10.
However, the bottom performing attribute for Noosa Heads was the range of housing prices and
tenures, at 3.7 out of 10. This attribute is not performing well in terms of contributing to the overall
liveability of Noosa heads and is of concern when a liveability score is this low.
Although this attribute was not valued as a high contributor to liveability overall within the Noosa
Heads Community (10%), when looking at the different age sectors for Noosa Heads, it increased
to 23% for under 25s and 21% for the 45-64 age groups, which shows that this attribute is a higher
priority for these groups of people and it's not performing well.
Local residents and neighbours have expressed concern over Council decision to investigate this
site for potential social and affordable housing outcomes. Residents have indicated to Council a
strong connection to the site, its use as part of Pinaroo Park and its local significance as a
vegetated area of greenspace within an urban context, these issues are relevant in terms of the
local residents perception and value of liveability in their neighbourhood.

                                                                                         Page 12 of 99

Section 13

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


5.    Site hydrology
A drainage path appears to have originally traversed the site as indicated in the Pinaroo Park
Bushland Reserve Ecological Restoration Plan (Map’s 1 and 2 Pg.6/7). An extract from these maps
is shown below in Figure 7 for reference.




Figure 7 – Part extract of the Pinaroo Park maps.

Council engaged Switchback Consulting Environmental and Civil Engineers to provide an overview
of site hydrology/hydrogeology. A copy of the overview is provided as Attachment 2. The report
identifies the lower corner of the site has the potential to have a secondary flowpath in significant
rain events, particularly given the stormwater infrastructure in Toulambi Street is not to current
standards and in poor condition. However, the watercourse identified in Figure 7 above was not
observed onsite nor were any springs. Switchback Consulting identifies the headwaters of the
Pinaroo Park ‘waterway’ at the discharge point located to the north east of the lot, behind No. 28
Toulambi Street. Figure 8 below shows the qualitative potential secondary flowpath and
headwaters of the ‘watercourse’. The watercourse has likely been modified as part of the road
works for the original subdivision.




                                                                                     Page 13 of 99

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022




Figure 8 – qualitative secondary flowpath and watercourse.
Effects of development
Although the watercourse is not observed on site, there is potential for a secondary flowpath in the
northeast corner, which does raise some considerations for any development. However, it is
considered that a solution could be designed to mitigate against any effect of a secondary flowpath.
This would increase the building cost but is not a significant hurdle.
6.    Bushfire
Council has a Bushfire Management Plan for Pinaroo Park dated September 2005 (BMP). The
BMP outlines several recommendations to reduce bushfire risk. Council generally undertakes
these recommendations with mowing near private lot boundaries, walking trails and verges. The
risk would be similar to that of adjoining properties to Pinaroo Park. The subject site is partially
mown by a Council contractor to reduce bushfire risk.
Effects of development
The site is subject to bushfire hazard. As part of the design stage of development a Building certifier
would determine a bushfire attack level and building materials / design implemented accordingly.
Depending on the bushfire risk level some cost to building could apply, it is considered that this
issue could be managed.
7.    Slope
The site originally had approximately 4.5m of slope diagonally across the site from the road verge
to the northern west boundary. However, that has been modified with a rock retaining wall with

                                                                                       Page 14 of 99

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


most of that slope now within the first 6m of the land, then gently sloping to the northern boundary.
A good building design could have the driveway located to the west side of the lot leading to a
ground level with garaging and services, and bedroom and living spaces on the upper level, which
would likely be at street level.
An engineer would be required to design the driveway and footings to ensure site stability. This is
a normal process on sloping lots and does not create any significant hurdles for development.
8.    Zone Amendment
Should the Council resolve not to advance investigations for social or affordable housing at 30
Toulambi Street, its future for housing development of any form should likewise be discounted and
the Environmental Management and Conservation Zone applied to the site when the planning
scheme is next amended.
9.    Council responsibility in housing
It could be said that it is not local government responsibility to provide social or affordable housing
for its community, but a State responsibility. However, it is Officers’ opinion that such a view is not
helpful. Housing for the most vulnerable in our community will only occur with government
intervention at all levels. Council shares responsibility, as it is required to adequately plan for and
ensure its community is housed and services are provided to sustain a happy and healthy
community. Further, as per many local employers, Council is finding it difficult to attract and retain
key workers because of the lack of local rental housing.
In December 2021 Council received and endorsed a Housing Needs Assessment which reviewed
in detail the unmet housing needs in Noosa Shire and the various social and economic impacts
this was having on the community.
The private market has created such high Noosa Shire land values, that land for social or affordable
housing is out of financial reach of community housing providers and therefore many in our
community are suffering.
The Noosa Plan outlines where and how dwellings are constructed in the Shire. The Councils’
planning scheme is a policy document regulated by State planning that sets targets for local
government to meet for dwellings numbers. However, it is Council that must ensure that the types
of housing needed is provided for its particular community and in the most appropriate locations.
Council’s intervention by offering its land for housing is essential and is likely to be one of the most
effective ways for social or real affordable housing to be provided because that way the land value
is removed from the equation, as it is generally the land and location which attracts most of the
property value. When the upfront capital investment required for the land component is removed
for community housing providers, this then affords a better chance of securing the needed housing.
Council’s contribution is the land component which can result in revenue from a ground/lands lease
arrangement of up to 40 years. In this way, the property is retained as social housing/affordable
housing for the long term, unlike in the private market where affordability is lost as the property
sells overtime.
In terms of the private market, there is currently no palatable way to entice developers to secure
social housing for the long term. The private sector currently relies on government subsidised rent
schemes for private investors (e.g., NRAS), but when the subsidies disappear, so do the social or
affordable housing. Officers are currently exploring opportunities where social housing can be
secured in the long term privately through advocacy, brokering and agreements as well as working
with the State Government to introduce inclusionary zoning.
Using Council owned land and partnering by entering into long term leases for residential purposes
secures social housing outcomes. Council can partner with or become lessor to community
housing providers (CHP). The CHP have the resources and experience to apply for funding and to
design, construct, manage and maintain the asset.



                                                                                        Page 15 of 99

Section 16

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


10.   Partnership structure
As part of the Housing Needs Analysis, the opportunity to partner to deliver social and affordable
housing outcomes was considered important and necessary to ensure the delivery of social
housing outcomes. Coast2Bay Housing is a registered community housing provider. Much of the
state funding currently available under the Housing Investment Growth funding for social and
community housing outcomes requires the involvement or partnering with a community housing
provider.
It is therefore proposed that Council indicate its intention to collaborate with a community housing
provider through entering into a memorandum of understanding (MOU).
A MOU is a non-legally binding agreement between parties that signals a willingness to work
towards a common goal and can be extinguished at any time. An MOU can be a precursor to
downstream negotiations or contracts in specific properties but does not provide exclusivity to the
parties. Downstream contracts or leases such as head or ground/land leases would still be required
to be considered and adopted/agreed to by Council.
An MOU is proposed between Noosa Council and Coast2Bay Housing Group which solidifies an
agreement to collaborate with Coast2Bay to provide social housing on suitable Council owned land
or other opportunities that arise and, apply for State/Federal funding when available. Council has
had a long-standing professional relationship with Coast2Bay Housing Group and the MOU will
ensure the best social and affordable housing outcomes occur to meet the needs of our community.
Coast2Bay is a well-respected not-for-profit community housing provider with a successful history
in Noosa Shire. They manage 491 dwelling through National Rental Affordability Scheme (NRAS)
on the Sunshine Coast and are a tier one community housing provider. Coast2Bay are fully
registered to apply and receive funding from the Department of Housing and Public Works and
other State and Federal departments.
Entering an MOU with Coast2Bay is the first step and signals Council intention to work directly with
Coast2Bay as a community organisation. Leasing of Council/community land must comply with the
contracting provisions of the Local Government Regulation 2021. The Local Government
Regulation 2012, Division 4 Section 236 allows Council to deal directly with a not-for-profit
community organisation. Prior to any further consideration of disposal of land or leasing of land
to a community organisation such as Coast2Bay a further report and consideration would come to
Council. The MOU simply signifies Councils intent to collaborate on these opportunities.
Noting a letter of support was provided to Coast2Bay Housing Group to allow an application for
funding to occur to the State. The funding available was part of the QLD Housing Investment
Growth Initiative - QuickStarts program. Quickstarts is a $1.59 billion capital grants funding
program for accelerated construction of social housing. There is a 4-year target of 137 houses for
the Sunshine Coast. Application closed on 21 January 2022.
Any potential future lease agreement with Coast2Bay would be reported for a Council resolution.

11.   Utilising Council land - options
Two options for Council utilisation of its land for affordable housing outcomes are via :
•    Head lease, or
•    Ground/lands lease
Head lease
Briefly, a head lease is when Council owns the asset and leases the building to a community
housing provider, who in turn subleases the asset as social or affordable. The property remains as
a Council asset. It means that Council would design, construct and maintain the property. A Head
lease arrangement is a significant intervention for Council into housing and carries some risk and
financial liability.




                                                                                      Page 16 of 99

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


Ground / lands lease
A ground/lands lease is essentially a long-term lease (say 40 years) of the land component only,
in this case, to a community housing provider. The community housing provider undertakes the
feasibility, design, construct, manage and maintains the asset/s at their cost. At the end of the
lease, the Council either:
•      renegotiates the lease; or
•      take ownership of the asset/s; or
•      the asset/s is demolished and the land handed back to Council in the original condition prior
       to the lease.
This ground/lands lease structure is not uncommon to Council and is a ‘hands off’ tenant/landlord
approach and resource efficient as Council does not manage or own the asset. For example,
ground/land leases are in place for Eco Cottages at Jarrah Street, Cooroy and the Flexible
Learning Centre at Girraween Court, Sunshine Beach.
If an agreement to lease Council owned land to a community housing provider is sought in the
future, the leasing of community land could also comply with the contracting provisions of Section
236 of the Local Government Regulation 2012 with the exceptions to standard tendering
requirements provided for in the Regulation as described in section 9 of this report. This essentially
allows Council to deal directly with a community organisation.
The ground/lands lease is likely to be what is recommended for Council owned land as it allows
Council to contribute to achieving social/affordable housing outcomes for little risk other than the
use of its land. This information is provided to Council for information only at this stage and is still
subject to further investigation and would be subject to a future report to Council.
Previous Council Consideration
Council on 16 December 2021 (item 8 of the General committee agenda on 13 December 2021)
resolved to investigate opportunities at 30 Toulambi Street for social housing and an undertaking
of $50,000 for budget review for this purpose. This report is the result of that undertaking.
Finance
Council on 16 December 2021 (item 8 of the General committee agenda on 13 December 2021)
made an undertaking for budget review of $50,000 for investigation of social housing on Council
owned land at 30 Toulambi Street.
Risks & Opportunities
This investigation for social housing at 30 Toulambi Street directly aligns with the following Council
Policies or strategies:
•    Council’s Housing Needs Assessment – progress unmet housing need;
•    Noosa Social Strategy –affordable community housing, crisis housing; and
•    Noosa Shire Local Economic Plan - provides social/affordable housing opportunities for
     works in the priority sectors.
There is currently no unconstrained land remaining in Council ownership in the Shire, any
consideration of land for social/affordable housing outcomes will present challenges and
considerations that will need to be weighed up in terms of managing the risks and constraints
against the opportunities for greater community outcomes.
The weighing up of the opportunity for social housing on this site which is considered to benefit the
wider community not just a few, against the risks of the negative impacts on liveability of the
proximity of flying fox roost has resulted in officers recommending that Council not proceed with
further investigations on this block for housing. However, that Council remain committed to
investigating further Council land and partner with Coast2Bay in exploring these and other
opportunities.




                                                                                        Page 17 of 99

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                  14 FEBRUARY 2022


Consultation
External Consultation - Community & Stakeholder
No formal public or stakeholder consultation has been undertaken for this report specifically. When
the site was rezoned to Low Density Residential public consultation was undertaken as part of the
second round of consultation of the draft Noosa Plan 2020. No submissions were received at that
time.
Council has however received a number emails and information from a small number of local
residents regarding this site and their concerns with any proposed development of the site.
Residents and neighbours do not want social housing on this site, they have a sense of ownership
and attachment to this block. That information has been taken into account in preparing this report
and recommendation.
The following external consultants were engaged to undertake preliminary investigations of 30
Toulambi Street, Noosa Heads:
•     North Coast Environmental Services – provided a fauna and flora survey
•     Switchback Consulting – Hydrology Overview

Internal Consultation
Comments from the following Council sections are integrated into this report:
•     Environment Services
•     Environmental Operations
•     Property

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      X   Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                              X   Procurement
                                  Waste & Environmental Health            X   Property
                                                                              Revenue Services

    Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture        X   Environmental Services                      Disaster Management
                              X   Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 18 of 99

Section 19

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


ATTACHMENT 2




                                       Page 19 of 99

GENERAL COMMITTEE MEETING AGENDA                                            14 FEBRUARY 2022

ATTACHMENT 2
         2                                   PO BOX 761 BUDERIM 4554 | PH: 0408 725 826

    2™ February 2022

    Glen Conforti
    Senior Strategic Planner
    Noosa Council
     [email protected]

    Dear Glen
    RE: HYDROLOGY CONSTRAINTS REVIEW FOR 30 TOULAMBI STREET NOOSA
    Please find below a review of the hydrology constraints for land located at 30 Toulambi St Noosa.
     Scope
    This review has been undertaken to identify constraints relating to hydrology so that Council can
    be informed of issues which may impact the development potential for land located at 30
     Toulambi St, Noosa. It is understood that Council is exploring social/affordable housing
    opportunities across various Council land holdings, of which this is one.
    This review was informed by the following tasks:
        1. Desktop review based on Council online mapping layers
        2. Site inspection to ground-truth online mapping and identify other potential issues

    Drainage Patterns
    The subject site is located adjacent to a sag point in the road network. The sag is located
    immediately in front of the adjacent property 28 Toulambi St and is identified by the presence of a
    side-entry stormwater pit in front of the property. The catchment contributing to this sag point is
    shown in Figure 1 and the sag is shown in Figure 2.
     Although the underground piped stormwater network continues from this sag point into Wyandra
    St, it is clear from the site inspection that excess surface flows/ponding from the sag will
    preferentially flow into 28 Toulambi St rather than continuing into Wyandra street, due to the
    relative levels at this location.
    The frequency with which surface flows will enter 28 Toulambi Street from the road drainage
    network is currently unknown and in practice will depend on both the magnitude of the specific
    rainfall events experienced as well as the degree of blockage of the stormwater inlets at the sag
    and at other locations in the upstream drainage network.
    It is expected that overland flows into 28 Toulambi St would occur relatively infrequently, however
    would almost certainly occur for events more frequent than the 1%AEP which is the current

     a

                                                                                   Page 19 of 99

Section 20

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 20 of 99

GENERAL COMMITTEE MEETING AGENDA                                             14 FEBRUARY 2022

       standard for which overland flow paths are not permitted to pass through private land for new
       development.
       It was noted during the site inspection that the stormwater inlets in the catchment are not to
       current standards (many are lintel-only with no grate) and were in poor condition. Refer Figure 3
       for examples.
        cs  us   z 3     - j          3          e             . ¥      >
            aye.          a             |  Rc                    MIR,
         :        WS                     Lae              x}           Lh /
        Foal            ~)  Ve              a a                 ATL
                  \                .         N)            ca     Vis)    it)
        SSA)           \ an    Kae 32) He
                            cf,                   7              S
           +s       Lal -  atti       .     -     }   a               =
         === 4         kK   SP           Loyd             TH Wn         t f
                 Fr exe                      7          See      h\       )
            Le                      te wre! Pi      4       ST         hf)
                   Ly   /            ee     97~  Li          a        Nees
              LR it                SE A               ae             ot
          ;       sy  _/    OS                  Ee            ale) ave >
         —~ saa                                 ay 4S              :
         ee                   ue    et ‘ss POEs ad fre:     )      ’   }
        vy       >         a CL 4            hee   fi
        J SS                  ee 4 od ee rN        Li { iF :  y   SS f
ISG Lopes) YP                                      SS     :  4  1) if)
            :           AEF nN ry | de                    a f             ¢
       os               A REN A               ICE          a
              Fo       eS           ANE           a      [|     HO ory
       Me       .      a a          8   ae gied Fat? i fs we )       i     5
               a ESN ed                                Gh             |
                    ~~  ea   are py Sa        e         om       J   y   >
                     7)     | YS ie i : } — Ot     4 o      My  tJ   H
                       | 3 au | Ie ay J Das a7 re » rf} D   Sa })
                         S      fo ep       el              me tuk
       PN    ae     5                   :               Sep    ea)        |
             NALA                   ry        VS                  EM led!
       Figure 1 — Catchment Plan to Sag at 28 Toulambi St
             es     \ Ha             oe     7                            _—
                                ,     nar]                             .
        r                            cg             a       wa
                                                         7 PO. os a es  x
                                                                7     pei

                                                  ¥     BF a. eo. 4 =

                        12              =         :

            ee   a     nM  —_  ~                    Vy              obs

       Figure 2 — Sag inlet at 28 Toulambi St

        Lm

                                                                                     Page 20 of 99

Section 21

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 21 of 99

GENERAL COMMITTEE MEETING AGENDA                                                  14 FEBRUARY 2022

           =       ;                               :   ar                                          a
           r 3                             .                                               PR     4

           a                 Me                                 3    —_     se               a
                                                                   Ce

           Small capacity (no grate and small lintel)      Damaged lintel and uneven grate
           Figure 3 — Examples of stormwater inlets within catchment (less than current standards}

           When overtand flows occur into 28 Toulambi St, the extent/width of the flowpath is not currently
           known. The frontage of 28 Toulambi St is relatively flat however and levels increase rapidly
           beyond the frontage of 28 Toulambi St. It is possible that some flow could also enter the frontage
           of the subject site from the sag point during such overtopping events, though this is considered
           unlikely and would be expected to be limited to the lowest point of the frontage (if it occurs).
           Once surface flows have entered 28 Toulambi Street, the direction of travel is highly dependent
           on localised surface features such as driveways, fencing, and raised garden beds. Based on the
           current site features it is possible that at least a portion of the surface flows from 28 Toulambi
           Street would enter the lower portions of the subject site during a major runoff event, before
           entering Pinarro Park.
           In terms of hydrogeology, no springs were observed during the site visit. The ‘waterway’ through
           Pinarro park appears to have headwaters originating at the headwall from the stormwater outlet
           from Wyandra St and no defined channel or flowpath was observed within the subject site

           Implications for Development of 30 Toulambi St
           The hydrologic constraints and risks are shown qualitatively in Figure 4. This Figure shows the
           expected preferential direction of overland flows based on the contour data and site inspection
           and are not intended to show the extent (width) of inundation.
           Overall, it is recommended that further analysis (modelling) is undertaken in order to quantify the
           extent of overland flow flooding which effects 28 and 30 Toulambi St in the 1% AEP event
           {including allowance for climate change). The identified overland flow flood extent should then be
           avoided, and sufficient (300mm) freeboard provided to any proposed building finished floor levels
           above the modelled overland flow flood level.
           It is recognised however that the subject site has over 4.5m of fall and therefore the implications
           for development do depend on the proposed built form and location within the lot.
           lf the driveway can be located on the high side of the lot frontage and the built form provided as
           elevated pole construction towards the front of the lot, then the hydrologic risks identified in the
           preceding sections would be minimised and Council may be willing to accept the residual risks
           without further analysis.

 Sa

                                                                                         Page 21 of 99

Section 22

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 22 of 99

Gq)
                                                                                                                                          m
                                                                                                                                          =
                                                                                                                                          m
                                                                                                                                          a
                oor                     s     Q=      7       a    =                ser               ri                                  >
                ® pt 8  \   ne ~        &     oy d    e  ,    7” ao 4     ’                 iy             .        Ps                    oO
                95 ay    \     es       o     O -     .             , &        '                                                          3
                o<        \      ~~     tn    5 >     =     >                                           Po                     ,          :
                 i  a                   ‘tire                               ¢/                           ;                                :
                aes           Nf)       2     ot      &        wf              °                         2                                =
                =   a.            wi,   Do    we +t            j               “J                        Aa
                a Oo        \     aa          ® ©     mx   Se               aa                           ro
                2m          \           :     3 =     t'   3                 a)         :                I         e                      m
                sp                            7 3     <                  Sosy          Pig.    r        Be                                =
                20                              s.    °                 r             P y        a,                                       m
                S~                                               .       ,   i                e
                *y                              a     5         £       j  RY                  ae                            a            m
                on                              $3                     So      eae                     a                                  =
                                                wo    a    5              ®         4                     o 2                             5
                so                              ec              ti        pA        ;                         =             my
                ®                               >     =          a                                        4                               5
                &                               5     9            erry            >             fx                  =      8
                5                               e     Off          By             :                s                  :                   >
                &                               2     ¢               3           |                Re                       r             @
                                                og                  \\a         f        4         I                 f       B            2
                                                o     So                          .                ant              7          Ss
                                                2     o   é. Y          Fe             roa                          J                     >
                                                —     a      -     d                   s;                          rs          ie
                                                z     ok          :    ff                a ~~   ;                              is
                                                3     %               fo            ‘         oe as ¢ 4        x               5
                                                =     :              3
5	1	1	1	32	4	2047	1290	18	68	0	BR
5	1	1	1	32	5	2190	1326	58	30	22	—
5	1	1	1	32	6	2475	1309	68	23	29	a
5	1	1	1	32	7	2765	1319	10	20	0	‘
4	1	1	1	33	0	1251	1347	1514	53	-1	
5	1	1	1	33	1	1251	1354	22	21	19	®
5	1	1	1	33	2	1615	1362	8	24	14	‘i
5	1	1	1	33	3	1782	1374	6	8	41	’
5	1	1	1	33	4	2165	1355	152	45	13	Perea
5	1	1	1	33	5	2390	1354	24	20	29	fe
5	1	1	1	33	6	2683	1347	82	42	17	ee
4	1	1	1	34	0	1257	1384	1491	36	-1	
5	1	1	1	34	1	1257	1384	18	36	48	zs
5	1	1	1	34	2	1608	1391	4	15	2	j
5	1	1	1	34	3	1773	1390	8	19	18	4
5	1	1	1	34	4	2158	1392	7	14	11	oe
5	1	1	1	34	5	2209	1400	1	3	41	7
5	1	1	1	34	6	2230	1390	110	23	33	See
5	1	1	1	34	7	2704	1393	44	15	0	_,
4	1	1	1	35	0	1244	1385	1237	94	-1	
5	1	1	1	35	1	1244	1409	36	41	5	s
5	1	1	1	35	2	1594	1412	11	29	9	i
5	1	1	1	35	3	1771	1435	8	44	0	)
5	1	1	1	35	4	1831	1385	24	66	0	Ni
5	1	1	1	35	5	2025	1419	17	22	11	Fi
5	1	1	1	35	6	2254	1401	53	47	0	3
5	1	1	1	35	7	2373	1442	20	17	2	r
5	1	1	1	35	8	2457	1392	24	57	0	i}
4	1	1	1	36	0	1587	1444	870	24	-1	
5	1	1	1	36	1	1587	1449	4	12	39	J
5	1	1	1	36	2	2015	1446	19	13	78	a
5	1	1	1	36	3	2149	1461	55	7	17	a”
5	1	1	1	36	4	2238	1444	68	13	22	a
5	1	1	1	36	5	2447	1449	10	19	87	/
4	1	1	1	37	0	1251	1432	1141	85	-1	
5	1	1	1	37	1	1251	1453	28	42	45	3
5	1	1	1	37	2	1462	1432	604	72	34	iS
5	1	1	1	37	3	2117	1450	189	55	21	Ay
5	1	1	1	37	4	2348	1470	44	47	0	S
5	1	1	1	37	5	2429	1469	17	33	42	/
4	1	1	1	38	0	1244	1477	1697	113	-1	
5	1	1	1	38	1	1244	1496	36	52	58	8,
5	1	1	1	38	2	1519	1490	66	100	52	4
5	1	1	1	38	3	1727	1477	133	80	35	Ne
5	1	1	1	38	4	2064	1504	20	20	0	‘.
5	1	1	1	38	5	2124	1504	46	25	54	=
5	1	1	1	38	6	2175	1512	27	51	0	-,
5	1	1	1	38	7	2221	1529	22	13	0	.
5	1	1	1	38	8	2270	1509	52	30	17	goa
5	1	1	1	38	9	2369	1545	8	5	0	?
5	1	1	1	38	10	2404	1503	24	46	59	A
5	1	1	1	38	11	2598	1488	43	37	56	a
5	1	1	1	38	12	2886	1515	55	66	86	%
4	1	1	1	39	0	1235	1546	1716	46	-1	
5	1	1	1	39	1	1235	1546	42	45	9	bid
5	1	1	1	39	2	1722	1565	4	6	42	‘
5	1	1	1	39	3	1831	1555	38	34	34	ae
5	1	1	1	39	4	1913	1574	19	18	0	~
5	1	1	1	39	5	2253	1547	6	2	0	‘
5	1	1	1	39	6	2378	1549	26	24	83	af
5	1	1	1	39	7	2735	1584	2	4	49	;
5	1	1	1	39	8	2949	1567	2	4	60	‘
4	1	1	1	40	0	1251	1557	1146	107	-1	
5	1	1	1	40	1	1251	1583	22	81	0	:
5	1	1	1	40	2	1520	1586	21	53	37	i
5	1	1	1	40	3	1828	1583	119	73	73	SS
5	1	1	1	40	4	2106	1614	31	23	55	a
5	1	1	1	40	5	2352	1557	45	94	58	“a
4	1	1	1	41	0	1250	1621	1838	84	-1	
5	1	1	1	41	1	1250	1658	24	45	13	gs
5	1	1	1	41	2	1470	1645	55	44	43	a
5	1	1	1	41	3	1677	1670	10	15	24	Oe
5	1	1	1	41	4	1748	1667	12	8	22	de
5	1	1	1	41	5	1934	1656	160	30	0	—ae
5	1	1	1	41	6	2218	1631	66	63	62	%
5	1	1	1	41	7	2334	1651	17	35	26	A
5	1	1	1	41	8	2498	1621	77	84	28	Five
5	1	1	1	41	9	2686	1646	9	23	0	/
5	1	1	1	41	10	3062	1646	26	12	0	-
4	1	1	1	42	0	1251	1656	1426	76	-1	
5	1	1	1	42	1	1251	1692	29	28	23	2
5	1	1	1	42	2	1477	1695	3	2	0	;
5	1	1	1	42	3	1484	1656	36	72	1	if
5	1	1	1	42	4	1669	1694	10	10	27	x
5	1	1	1	42	5	2006	1687	194	36	27	Sse
5	1	1	1	42	6	2324	1687	10	17	0	Z
5	1	1	1	42	7	2487	1680	45	52	25	on
5	1	1	1	42	8	2675	1701	2	5	54	7
4	1	1	1	43	0	1251	1710	1618	51	-1	
5	1	1	1	43	1	1251	1722	28	33	51	2
5	1	1	1	43	2	1455	1727	38	30	38	A
5	1	1	1	43	3	1651	1717	19	33	78	~
5	1	1	1	43	4	2088	1723	69	30	68	>
5	1	1	1	43	5	2201	1723	43	17	45	>,
5	1	1	1	43	6	2662	1723	8	23	14	j
5	1	1	1	43	7	2812	1713	31	34	11	EN
5	1	1	1	43	8	2842	1710	27	51	18	oe
4	1	1	1	44	0	1253	1743	1550	86	-1	
5	1	1	1	44	1	1253	1756	20	51	6	8
5	1	1	1	44	2	1459	1786	3	3	0	;
5	1	1	1	44	3	1590	1793	1	5	22	ia
5	1	1	1	44	4	1679	1808	4	1	0

                                                                     ys =.         te   ™ iif a              '   es
                                                a              Ry             Sr Sy          . i :  MES    yt    oe. i                    5
                                                a                                             =     ee te           a
                                               Ea               a                       ,   = = 5 hes   ~~        § g                     m
 vu                                             =                               7             z*   td NT ys . i    z 8                    w
2       |                                       °                       :  ‘                  =   - ~—  by SS   S &       ne  =           2
8                                               3        vag    es      wife                              ~           ==                  >
N                                               =          ,    Ps         ta.         ad 1              ca  . Ss =   >       i.          2
°                                               oO                                                                                        nD
©                                               .                                                                                         8
o                                                                                                                                         Ss

Section 23

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022


5     MCU21/0162 - APPLICATION FOR A MATERIAL CHANGE OF USE – COMMUNITY USE
      (SURF MUSEUM), FOOD AND DRINK OUTLET, INDOOR SPORT AND RECREATION
      AND OFFICES AT 3 HILTON TERRACE, TEWANTIN
    Author           Development Planner, Will Koschade
                     Environment and Sustainable Development

    Index            ECM/ Application/ MCU21/0162

    Attachments 1 – Proposal Plans


    APPLICATION DETAILS

    Applicant                      Okanui Museum Pty Ltd TTE

    Proposal                       Material Change of Use - Community Use, Food and Drink Outlet,
                                   Indoor Sport and Recreation and Offices

    Properly Made Date             23 September 2021

    Information Request Date       22 October 2021

    Information Response Date      3 November 2021

    Decision Due Date              13 January 2022

    Number of Submissions          Nil (0)

    PROPERTY DETAILS

    Property Address               Noosa Lakes Resort 95/3 Hilton Tce Tewantin
                                   Noosa Lakes Resort 3 Hilton Tce Tewantin

    RP Description                 Lot 0 SP115731
                                   Lot 95 SP115731

    Existing Use of Land           Residential Resort & Conference Centre with Ancillary Service
                                   Buildings

    STATUTORY DETAILS

    SEQRP Designation              Urban Footprint

    Zone                           Tourist Accommodation Zone

    Precinct                       Not Applicable
    Local Plan Area                Tewantin Local Plan Code

    Overlays                       Not Applicable

    Assessment Type                Impact

EXECUTIVE SUMMARY
The application is seeking approval to permit various uses to operate wholly within the existing
conference centre at the entrance of the Noosa Lakes Resort. The proposed uses include a
Community Use (Surf Museum), Food and Drink Outlet (Restaurant), Indoor Sport and Recreation
(Gym) and Office.
External works would include a new pedestrian pathway from the building’s entry and replacement
of the existing deck on the northern side of the building. Existing landscaped areas along the
building’s frontage would also be revitalised.
                                                                                  Page 23 of 99

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


The current land uses include a Residential Resort & Conference Centre with Ancillary Service
Buildings. The existing conference centre was approved by Council in 1997, when a Town Planning
Consent Permit was issued for “Indoor Entertainment/Function Room (Conference Centre) and
Multiple Dwellings of 94 units and accommodation building of 94 units”. At the time Council
acknowledged a nexus between the visitor accommodation use and the conference centre and
considered that the two uses are complimentary.
The purpose of the Tourist Accommodation Zone is to provide for short-term accommodation and
associated uses that serve visitors to support the tourism focus of the area.
The proposed uses are mostly considered appropriate for a Tourist Accommodation Zone as they
will support the area’s tourist accommodation facilities and recreational activities., apart from the
proposed offices. Professional offices do not provide a focus for visitor accommodation and are
more appropriately located in the centre zones.
It is recommended that the application is approved in part to enable the Community Use (Surf
Museum), Food and Drink Outlet (Restaurant) and Indoor Sport and Recreation (Gym) uses to
occur. The offices are not supported as they are contrary to the purpose of the Tourist
Accommodation zone and are more appropriately located in a centre zone. Further there is no
demonstrated need for additional land to be allocated for office space.
RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting dated
14 February 2022 regarding Application No. MCU21/0162 for a Development Permit for Material
Change of Use - Community Use (Surf Museum), Food and Drink Outlet (Restaurant), Indoor Sport
and Recreation (Gym) & Offices situated at Noosa Lakes Resort 3 & 95/3 Hilton Tce Tewantin:
A.     Approve the application in part in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
      the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table unless
      otherwise amended by these conditions.
       Plan No.   Rev.    Plan/Document Name                                                Date
       TP101      A       Site Plan, Skeco Building Design                                  13/08/21
       TP202      A       Existing First Floor Plan, Skeco Building Design (annotated)      13/08/21
       TP203      A       New Ground Layout Plan, Skeco Building Design (annotated)         13/08/21
       TP204      A       Café Bar Restaurant, Skeco Building Design                        13/08/21
       TP205      A       Gymnasium, Skeco Building Design                                  13/08/21

      Nature and Extent of Approved Use
3.    Service vehicle movements associated with the approved use (including loading and
      unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday and not at
      all on Sundays or public holidays.
4.    The outdoor dining area associated with the Food and Drink establishment must not exceed
      39m2.
5.    The gymnasium is limited to a maximum of 10 people at any given time (excluding staff).
      Currency Period


                                                                                         Page 24 of 99

Section 25

GENERAL COMMITTEE MEETING AGENDA                                            14 FEBRUARY 2022


6.    This development approval lapses if the use has not happened by 17 February 2028, unless
      an application to extend the currency period is approved by Council.
      Street Identification
7.    The street address of the development must be clearly visible and discernible from the
      primary frontage of the site by the provision of a street number and, where appropriate, the
      building name.
      Damage to infrastructure
8.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
      Building Appearance
9.    All mechanical equipment and other service infrastructure located on the site must be:
      a.   located not less than 2 metres from a property boundary
      b.   fully enclosed or screened such that they are not visible from the street frontages nor
           adjoining properties. Where screened by landscaping, landscaping beds must be at
           least 1.5 metres wide.
      No part of the site may be used for outdoor storage of materials unless specified on the
      Approved Plans or the conditions of this Decision Notice. Materials stored outside of the
      building must not exceed 4 metres in height or half the height of the building, whichever is
      the greater.
      Car Parking
10.   A minimum of 31 car parking spaces must be provided and marked on the site and made
      available and accessible at all times while the uses are open for business. All car parking
      areas and access driveways must be maintained exclusively for vehicle parking and
      manoeuvring and kept in a tidy and safe condition at all times.
11.   Directional signage must be provided to direct visitors and customers to the car parking
      spaces provided on site.
      Landscaping Works
12.   The development site must be landscaped. The works must be undertaken in accordance
      with an Operational Works approval and the Noosa Plan for that specific area and must
      include in particular:
      a.   the works shown on the Approved Plans
      b.   revitalisation of the existing landscape beds and landscape setbacks along the Hilton
           Terrace Road frontage of the subject site (where the conference building is located),
           exclusive of the access driveway, generally uncompromised by infrastructure items.
13.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be
      refurbished when its life expectancy is reached.
14.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
B.    Refuse the proposed Offices for the following reasons:
      1.   The proposed Offices are not consistent with the purpose of the Tourist
           Accommodation Zone as the use does not support short-term accommodation and
           tourist attractions.
      2.   The proposed Offices are not consistent with Overall Outcomes (2)(a), (2)(b) and (2)(y)
           and Performance Outcomes PO1, PO2, PO3 and Acceptable Outcome 3.2 of the

                                                                                   Page 25 of 99

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


            Tourist Accommodation Zone Code because:
            a) The offices will not complement and enhance the function and attractiveness of the
               areas a visitor destination as the offices do not cater to the needs of visitors or
               residents enjoying the area.
            b) The offices will not serve visitors and preserve the role of the area as tourism focus
               area.
            c) Offices are not intended to establish in the Tourist Accommodation zone unless
               they support the area’s accommodation facilities and tourism and recreation
               activities.
      3.    The proposed offices are contrary to the Strategic Intent and Outcomes for the Shire
            as commercial offices are intended to be located in the defined centres and key visitor
            areas intended for tourism activities.
      4.    There is no need for additional land or floor space outside the designated business
            centres for offices.
C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.     PROPOSAL
The application seeks approval to permit various uses to operate wholly within the existing function
centre. The proposed uses include a Community Use (Surf Museum), Food and Drink Outlet
(Restaurant), Indoor Sport and Recreation (Gym) and Offices.
The application also seeks approval for some external works which would include a new pedestrian
pathway from the building’s entry and replacement of the existing deck on the north side of the
building (currently dilapidated). In terms of landscaping, approval is sought to revitalise the existing
landscaped buffer along the function centre’s frontage to Hilton Terrace. No other external changes
to the building are proposed. Car parking and access arrangements would also remain unchanged.
The existing building is proposed to be laid out as follows:
Ground floor
•     Food and drink outlet (Restaurant) – 191m² (103m² indoor & 39m2 outdoor dining)
•     Indoor sport and recreation (Gym) – 387m²
Upper floor
•     Offices – 192m²
•     Community use (Surf Museum) – 607m²
The location of each use is identified on the proposal plans in Figure 3 and 4.
The applicant further summarises the development proposal as follows:
“The food and drink outlet (Vietnamese) will service Noosa Lakes resort’s permanent and short-
term residents as well as some external patrons attending the café. The restaurant would operate
during regular business hours.
The Indoor sport and recreation use will provide a gymnasium for the residents and visitors to the
resort with some general public attending.
The gymnasium would not operate like a traditional Jetts or F45 and rather focuses on
rehabilitation. The proposed gym operator would only have small class numbers (max 10 for
Vietnam Veterans – not including staff (3 to 4)) and is described as a rehabilitation gym.
Offices are expected to be a type of co-workspace with common facilities with the Community use.
The offices are designed for month to month /week to week contracts allowing for visitors to attend
to some work while also holidaying in the area – there are no long-term leases in the offices and


                                                                                        Page 26 of 99

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


the floor areas are limited in size, not akin to a traditional open floor plan commercial office.
The community use (museum) provides a cultural history of surfing, not only for the Noosa Shire’s
but to the greater surfing community. There are approximately 250 surfboards in the museum,
which forms part of the owner’s private collection (one of the largest in the country).
A surfing library with old magazines and paraphernalia is also provided for the general public to
use. The kitchen on the upper and lower level is directly associated with the museum and would
be used to provide food and drink for interpretive gatherings and occasional functions associated
with the museum.”
A total of 233 onsite car parking spaces are available to accommodate the development including
the existing residential use. This includes 31 exclusive use spaces immediately adjacent to the
existing function centre building. The applicant advises that 26 spaces have also recently been
constructed along Earl Street should additional parking demand be generated.




                                        Figure 1 – Locality plan




                                           Figure 2 – Site plan

                                                                                        Page 27 of 99

Section 28

GENERAL COMMITTEE MEETING AGENDA                       14 FEBRUARY 2022




                        Figure 3 – Ground floor plan




                         Figure 4 – Upper floor plan


                                                           Page 28 of 99

Section 29

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


2.    SITE DETAILS
2.1   Background
A rezoning application for the site was approved on 13 February 1997 to Special Facilities
(integrated residential development and ancillary facility) zone. This approval allowed for 94
multiple dwelling units and a small conference centre.
A Town Planning Consent Permit was issued on 4 March 1998 and amended on 8 April 1998
(11895TC). The permit was for resort, indoor entertainment/function room (conference centre) and
ancillary facilities (multiple dwelling of 94 units and accommodation building of 94 units).
Essentially, this approval allowed for the additional 94 accommodation units and a larger
conference centre. Condition 1 of this approval requires the development to be in accordance with
the rezoning approval, except where varied by the town planning consent permit.
The Indoor Entertainment/Function Room (Conference Centre) was designed to accommodate up
to 250 delegates and private functions. Under the Scheme at the time, Indoor Entertainment was
defined as ”…Any premises used or intended for the use for any activity, purpose or pursuit of an
indoor nature, which affords interest or amusement. Without limiting the generality of the foregoing,
the term includes the use of any premises for any activities, purposes or pursuits included in, but
not limited to, Table 1.3. The term does not include a nightclub as herein defined.”

 Table 1.3 Indoor Entertainment
 Amusement hall                     Museum                           Court
 Art gallery (commercial)           Music hall                       Covered swimming pool
 Billiard saloon                    School of art                    Dance hall
 Bowling centre                     Side show                        Exhibition
 Broadcasting studio                Skating rink                     Gymnasium
 Cinema                             Sporting club                    Meeting hall
 Concert hall                       Sports                           Stadium
It is noted that the previous approval permitted additional population density in excess of what the
planning scheme envisaged at the time. The additional population density was supported based
on a need to accommodate the future conference delegates on site. Council acknowledged that
there was a nexus between the development of a substantial conference centre and the need for
delegates to be accommodated in close proximity.
2.2   Site Description
The subject building is the existing indoor entertainment/function centre at the entry to the Noosa
Lakes Resort. The site is generally level.
Vehicular access is provided via Hilton Terrace near the eastern side of the Lake Doonella bridge.
A pedestrian crossing is located to the front of the site and footpaths are located along the frontage
of Hilton Terrace.
Gated access to Earl Street is also provided for pedestrians. The subject building and the resort
have well established gardens with some mature native trees within the site and street trees along
the street frontage.
2.3   Surrounding Land Uses
North – Hilton Terrace, Tewantin boat launch ramp and Lake Doonella bridge.
South – Noosa Lakes Resort multiple dwellings and riparian area of Lake Doonella.
East – Earl Street and shops on Hilton Terrace.
West – Lake Doonella.
3.    ASSESSMENT
3.1   Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:

                                                                                      Page 29 of 99

Section 30

GENERAL COMMITTEE MEETING AGENDA                                             14 FEBRUARY 2022


•     State Planning Policy;
•     South East Queensland Regional Plan;
•     Planning Regulation 2017;
•     Noosa Plan 2020.
3.2   State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the assessment
benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3   Statutory Instruments – Planning Scheme
The following codes are most relevant to the development proposal:
•     Tewantin Local Plan Code;
•     Tourist Accommodation Zone Code;
•     Community Activities Code;
•     Business Activities Code; and
•     Works Code.
Locality Provisions
The subject site is located in the Tewantin Locality and is zoned Tourist Accommodation. The
proposed uses are identified as consistent uses with the zone and are required to follow an impact
assessable application process. The pertinent issues arising out of the assessment are discussed
below:
Tewantin Local Plan Code
The Tewantin Local Plan Code contains limited relevant provisions to the proposal, apart from
Performance Outcome PO17 which requires that “…Noosa Lakes Resort at 3 Hilton Terrace
continues to operate as short term resort accommodation for visitors to the Shire”.
The proposed uses are generally consistent and compatible with the intent for the site to continue
to operate as short term resort accommodation for visitors to the shire, with the uses largely
supportive of the site’s tourism focus with the exception of the proposed offices. The proposed
offices do not directly support the site’s intended use.
Tourist Accommodation Zone Code
The site is located in the Tourist Accommodation Zone. The relevant Purpose and Overall
Outcomes of the Tourist Accommodation Zone Code are provided below. Other relevant
Acceptable Outcome/s and Performance Outcome/s are provided thereafter:
(1)   The purpose of the Tourist accommodation zone is to provide for:
      a.   short-term accommodation; and
      b.   community uses, and small-scale services, facilities           and   infrastructure,   to
           support short-term accommodation and tourist attractions.
(2)   The overall outcomes sought for the Tourist accommodation zone are as follows:




                                                                                    Page 30 of 99

Section 31

GENERAL COMMITTEE MEETING AGENDA                                            14 FEBRUARY 2022


      a.   Development provides for a mix of medium to high density visitor accommodation in
           the form of resorts, hotels and short-term accommodation such as hostels and self-
           contained holiday units.
      b.   Visitor accommodation in the urban areas is supported by a mix of business activities
           which create a vibrant atmosphere and complement and enhance the function and
           attractiveness of the area as a visitor destination. Cafes, restaurants, entertainment,
           function facilities and complementary shopping and personal services cater to the
           needs of visitors as well as Noosa Shire residents enjoying these areas.
      c.   Business activities are ancillary to visitor accommodation and should be of a
           nature and scale compatible with the mixed-use character and coastal amenity of the
           area and not compromise the viability of the Noosa Shire centres hierarchy by
           introducing activities at a scale that should be accommodated within a centre. No
           business uses are appropriate on 215 David Low Way, Peregian Beach.
      d.   Development in the Tourist accommodation zone is for visitor accommodation and
           associated uses that serve visitors to preserve and support the role of Noosaville as a
           tourism focus area.
PO1
Development provides a focus for visitor accommodation and a range of ancillary retail, food and
beverage and entertainment uses that contribute to the tourism focus of Noosa Shire.
PO2
Development provides for a range of visitor accommodation activities and non-residential uses
accommodated in mixed-use buildings, where such activities are compatible with and ancillary to
the predominant functions of the zone as visitor accommodation.
PO3
Business uses are secondary to accommodation uses and support recreational activities and
surrounding accommodation facilities without compromising or competing with Major Centres or
District Centres.
AO3.2 Banks, professional offices, supermarkets, discount department stores, showrooms,
hardware stores and health care services are not established in the Tourist accommodation zone.
PO20
Development in the Tourist Accommodation zone and other resort complexes provide visitor
accommodation into the future to preserve and support the role of Noosaville as a tourism focus
area.
The existing development comprises a Resort with 94 Multiple Dwellings and 94 Accommodation
Units and an Indoor Entertainment/Function Room (Conference Centre) at the site entrance. The
conference centre was approved on the basis that it would remain ancillary and complementary to
the visitor accommodation use given the nexus between the two uses.
At the time of the original approval, the Indoor Entertainment/Function Room (Conference Centre)
was designed to accommodate up to 250 delegates and operate as a space intended for private
functions. The Planning Scheme at the time also allowed the building to be put to a number of
other uses including a gymnasium, museum art gallery etc. or other uses defined as “Indoor
Entertainment” under the superseded Scheme. The Planning Scheme supported these uses given
they were considered complimentary and supportive of the primary tourist focus for the site.
The applicant submits that the conference building is no longer considered viable, and the
application seeks approval to introduce a range of business uses to operate from the existing
conference building. These uses include a Community Use (Surf Museum), Food and Drink Outlet
(Restaurant), Indoor Sport and Recreation (Gym) and some Office space. The associated floor
areas for each use are identified on the proposal plans and documented under Section 1 of the
report.
The purpose of the Tourist Accommodation Zone is to provide for short-term accommodation and
uses to support this accommodation and tourist attractions.

                                                                                   Page 31 of 99

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022


The proposal retains the site’s existing accommodation on the site. The proposed uses are also
mostly considered appropriate for a Tourist Accommodation Zone in the sense that the
combination of uses would support recreational activities and provide a tourism focus. These uses
include the museum, restaurant and gymnasium. The proposed professional offices however are
not considered appropriate for a Tourist Accommodation Zone and inconsistent with the purpose
of the zone. Professional offices do not support the role of the area for tourism and do not support
the site’s short term visitor accommodation. .
While some offices such as booking office or the like do have a role in the area zoned for tourist
accommodation, professional offices such as solicitors, architects, town planners and the like do
not have any real tourism focus. Such uses would be better suited in a business centre zone.
The restaurant, museum and gymnasium are uses readily expected in a resort environment and
are likely to be utilised by visitors staying at the resort. This is not the case for the professional
offices. The applicant advises that the “offices are designed for month to month /week to week
contracts allowing for visitors to attend to some work while also holidaying in the area – there are
no long-term leases in the offices and the floor areas are limited in size, not akin to a traditional
open floor plan commercial office.” Although the layout of the professional offices is not akin to a
conventional, open floor plan office, the activity would still compete with other office spaces
appropriately located in a centre zone and undermine the strategy for these centres to
accommodate retail and commercial business uses.
The application was referred to Council’s Strategic Planning Branch for comment whom advised
“…the proposal is located at 95/3 Hilton Tce, Tewantin and includes a material change of use for
visitor accommodation (94 Multiple Dwellings and 94 Accommodation Buildings), museum, food
and drink outlet, offices and gym. Whilst acknowledging that the proposed development has a
large portion of the site dedicated for uses that are consistent with and contribute or support the
purpose and overall outcomes of the Tourist Accommodation, the plans also include a small portion
of the development for offices.
Although the office use area is only a small portion of the overall development, the concern is that
proposal does not convey how the office use will contribute to and support the current tourist
accommodation activities on the site. The office tenancies may compete with or compromise the
Tewantin District Centre, where such uses are encouraged. In addition there is no evidence to
suggest that there is an overriding lack of supply for office space with the existing centres in
the locality to support this proposal.”
It is noted that there are currently some commercial vacancies along Poinciana Avenue in the
District Centre Zone, with some land owners in the centre citing the difficult market to include office
space in their development.
Car Parking
Acceptable Outcome AO6.1 of the Driveways and Parking Code requires that car parking spaces
be provided at the rates specified in Table 9.4.1.1 – Minimum Parking Requirements Including End
of Trip Facilities. Where unable to achieve minimum car parking rates, Performance Outcome PO6
of the code requires that “…sufficient parking is provided having regard to the specifics of the use
including:
a.    The type and intensity of the land use;
b.    Any existing parking available on the site;
c.    Hours of operation;
d.    Likely number of users;
e.    Accessibility to the site by means other than private motor vehicle;
f.    The peak parking demand periods of uses on the site; and
g.    The availability of alternative car parking.”
The required parking generated by the existing and proposed development is detailed in Table 1
below.



                                                                                       Page 32 of 99

Section 33

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


Table 1 – Car Parking Rates
 Use                                  Floor Area    Parking Rate                  Required Parking
 Existing 94 multiple dwellings and   -             Condition 4 requires 188      188 spaces
 94 Accommodation Units                             spaces
 Food & Drink Outlet                  142m2   Use   1 per 20m2                    7 car spaces
                                      Area
 Indoor Sport & Recreation            387m2         1 per 20m2                    19 car spaces
 Office                               192m2         1 per 20m2                    10 car spaces
 Community Use                        607m2         1 per 20m2                    30 car spaces
                                                    TOTAL:                        254 car spaces

The original development provided a total of 233 spaces. Condition 4 of the original approval
requires "Provision of 1 carparking space for every dwelling unit, accommodation unit and
manager's residence…” which equates to a total of 188 residential spaces. 31 spaces are located
directly adjacent the conference centre and the balance of 14 other spaces are scattered
throughout the development. This aggregate is 233 spaces.
A combination of condition 4 (which requires 188 resident spaces) and the parking required for the
proposed uses, suggests a parking shortfall of at least 21 spaces.
Some matters included in the planning officer’s report at the time of the original approval are
considered relevant and are discussed below.
The applicant has provided the following information regarding parking justification:
“In further support, the original Council officers planning report acknowledged that the conference
centre could have to more than 250 delegates if required and that private functions such as
wedding receptions is likely to occur and that any overflow parking could be accommodated onsite
without the need for cars to be parked on neighbouring streets. The proposed uses will also not
always happen concurrently and that a percentage of the patrons will be staying onsite reduces
the parking generation of the proposal.
The various uses are also anticipated to operate at peak capacity at different times with the
following estimated times:
-Food and Drink Outlet - 12pm to 2pm and 5pm to 9pm
-Museum - 10am to 4pm with peak during functions between 6pm to 12am
-Office - 9am to 4pm weekdays
-Gymnasium - 6am to 6pm
The museum is the largest user of parking spaces, however based on daily foot traffic the only
times the museum is full is during occasional events after 6pm. The peak periods for the combined
uses will be between 12pm and 2pm (~35 spaces) and during museum functions after 6pm
occasionally (~38 spaces).
There is a bus stop located on Hilton Terrace directly outside the site with the 626, 627 and 601
bus routes meaning a regular 10-minute interval allowing access to the site. A pedestrian crossing
is also located directly opposite the site allowing access to the main walking and riding network.
A further 26 spaces are provided directly adjoining the site in Earl Street and overflow event parking
in Hilton Esplanade.
The proposal is providing the number of car parking spaces likely to be generated by the uses and
there has not been any issues raised in the past in regard to car parking. It is considered the
proposal fully complies with the Driveways and Car Parking Code.”
It is considered that while the development does not satisfy the scheme’s parking requirements,
the proposed development will generate no greater parking demands than the existing approved

                                                                                        Page 33 of 99

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022


uses. The applicant is also willing to accept a condition limiting the number of patrons to the gym
to a maximum of 10 persons. Some overflow car parking does further exist in Earl Street (26 new
parking spaces) in reasonable proximity to the site.
The application was referred to Council’s external traffic consultant who advised “…there is
nothing in the existing approval that ties use of the existing conference facility to the
accommodation use, so while it would have been expected that significant conferences at the
existing facility would have had users who also then conveniently stay at the accommodation
overnight, there could be existing conferences where none of the participants use the on-site
accommodation.
I think it would be unreasonable to refuse the proposal on car parking grounds on the basis that
the proposed uses wouldn’t generate an aggregate parking demand in excess to what is
currently permitted.”
CONSULTATION
Referral Agencies
Not applicable
Internal Council Referrals
The application was forwarded to the following internal Council officers:
•    Environmental Health Officer
•    Strategic Planning
Public Notification
The application was publicly notified for fifteen (15) business days in accordance with the Planning
Act 2016. No submissions were received. The following table provides a summary and assessment
of the issues raised by submitters.
CONCLUSION & REASONS FOR DECISION
The proposed development is consistent with the purpose of the Tourist Accommodation Zone to
provide for short-term accommodation and uses to support this accommodation and tourist
attractions apart from the proposed offices. The museum, gym and restaurant will all complement
and enhance the area’s tourism focus and support the site’s visitor accommodation. The proposed
offices, while small in total floor area, do not support this tourism focus and are not consistent with
the purpose of the zone with the code specifically identifying that professional offices are not
established in the Tourist accommodation zone. Further no need has been demonstrated for
additional land to be allocated for office space and the proposed offices, and the proposal has the
potential to undermine the business centre strategies.
It is therefore recommended that the application is approved in part to enable the Community Use
(Surf Museum), Food and Drink Outlet (Restaurant) and Indoor Sport and Recreation (Gym) uses
to occur, with the offices refused.
Departments/Sections Consulted:
       Chief Executive Officer        Community Services                        Corporate Services
       Executive Officer              Community Development                     Financial Services
       Executive Support              Community Facilities                      ICT
                                      Libraries & Galleries                     Procurement & Fleet
                                      Local Laws                                Property
                                      Waste & Environmental Health              Revenue Services

       Executive Services         x   Environment & Sustainable Development     Infrastructure Services
       Community Engagement           Building & Plumbing Services              Asset Management
       Customer Service           x   Development Assessment                    Buildings and Facilities
       Governance                     Economic Development                      Civil Operations
       People and Culture         x   Environmental Services                    Disaster Management
                                      Strategic Land Use Planning               Infrastructure Planning,
                                  x
                                                                                Design and Delivery



                                                                                        Page 34 of 99

Section 35

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 35 of 99

GENERAL COMMITTEE MEETING AGENDA                                           14 FEBRUARY 2022

                                                                                                                                Attachment 1

                                              aes    a rr ne Ca     Wal ra
          =                             aS
         CAFE BAR RESTAURANT AREAS | —                    Lomandra species coastal!
          =e                                Be                 |       al                                          _
         EXTERNAL OIMNGAREA 8037 See               ‘,   I 2.
          =             see                                                  :                                    Nw
          —                                             eae SS                         =  a                    —_
                            pes                          NO    ALE
        [CAR PARKING ACES: 45  =~.                                       ;
                                Os      =
               °            SOA =                                                 a                                      ae
                              ee                          Ls         fel] > ]=|=[=)/07, 7                                eee [P|
                     CN      gf       €%                  et                           “["/ s/s      '                             ee
                   eee      A    ey                             :                              Milan XK b                 a
                               Vee     sy                                                              \                  oe
                                                                                                        \                   = orarcare of ste er
                            CAFE rBaR/                          '                                       .                 very
                    \\      RESTAURANT  .                            22) 23 | 24] 25 | 28 |/ or},        \                —naeea
                                oe              i         a                         7/20/55 2             \              Serwew mew 8 oeenes
                      \\     2 *                h             a                             33) a0 sa} 55  \              eras Pe pooety of he amore
                     YS      Es                                                                              \)
                                           J                                                        Sd      %
                                             =«\>                  awlaje
                (@)         ci                                                            Sl aa] as
                                              We  nee
                                             ht A Pre                    ||
                                            fb Me ese.                   }
                                           / i f    f rae    an        \Hi                                                = a
                                         / Mae            syst   oa        Sy
                                       KEE Rae ig                                       7                                 =
                                       3 (iy :    Bah GON Rat gin Pinks Fee   eS                                         95/3 Hilton Tce
                                     JE Eotb EG                                                                           cere,
                                    Sé;     ag   am ee          deh  abies vase    Cae
                                      rus       .  2           = te       er, ee) Pan SN
                                   / ABE     2     et acl          eye Sepa ee  PERS ena     )
                                  / A   spe    ee      AP eT eee eee — Ar        Bae ee
                                 | [GIES EEC S             BN ey oct s PUN Anes ES ak
                                 JL.  Bee? Re Eee aN                                                                     2107 |" aa |
                                       pCR          eR,     ee eae eee                      \
                                   \ gS eR ae ee Sn eee          bee PP    ge —   ea                                                  =|
                                   | \ PDs siete ste age      re                                                         —
                                      VATED Se Ne                                                                       Peenen anew    |
                                         eee                                                                             TP101 A |
                                                               Figure 1 — Site Plan
                                                                                 Page 35 of 99

Section 36

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 36 of 99

GENERAL COMMITTEE MEETING AGENDA                               14 FEBRUARY 2022

                                                                                                   skeco
                                  _
                           coe wero                                                              Tee uerg om coeur
                                   Sn                                                            Scie oe Brarcen Demers
                                       a                                                         Sapiounscr
                              =              _                                                   =
                         a                                     |              tn                 ONT   En
                            -                     7            |            Sy be                         |
                                                                             Et ita
                          Ty                                                  KITCHEN,
                        (3                                                   : []           :
                          L-
                                           eee \ |                          To
                                 2            0)
                  \                 eS                                  a                   zt   LL
                                   works       >             CT Pe           =a
                     +                                              ————————                     NOOSA SURF
                      \                    oe
                                                  [we              so          ey
                                 oo                                                              Noosaville
                                                                                                 FLOOR PLAN
                                                                                                   swe IONE
                                                                                        a        ee
    (@ s2pustucemsT L008 PUN                         Omces are for shor term lease and must nt Ww he a
         ‘                                                                                       [mwwer Rca |
                                             Figure 2 — Upper Level Plan

                                                                    Page 36 of 99

Section 37

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 37 of 99

GENERAL COMMITTEE MEETING AGENDA                                 14 FEBRUARY 2022

                                                 HBB F000 & Drink - 191m2 (142m2 Use Area)
                                                  ce
       ON-SITE BEFORE COMMENCING CONSTRUCTION WORK [1] Community Use - 607m2
        NOTE: The proposed                        [i ottces - 192m2
        Office does not form                      BBE 100° sport and Recreation - 387m2               skeco
        part of the approval.                                     om                                   BULDING DESGN
                          to ot
                                a                            ee                                     ==
                              a?        _       I —_                           ri     re             hae eC ere
                   —_                     W                eee eee vente              ,              naa    a
                          —                    Cy               ry)     ry)            |            ——_
                                        :                                      TT                   Sevorios,
                               ea                                              Py fap}                        |
                ca                                                             a]
                               ,                                                       1
            ~              Ko                                                               :
                        ! gs                                                            i
                        iy                                                              |
         WA                                                  —                                 Le
                                                                                        |
                                                                                        |
             :                                                                          |

                                      \           0          »                                        ——_
         ra                     a
           LL       }    mu aa                                                                             amo -
      a                                                          pu)
           /™                                                                                       FLOOR LAYOUT
               TS     /                                                                     =       So
                                                                                                    [aren area
                                                                                              ~    —a
     @) SD NEW GROUND FLOOR LAYOUT PLAN                                                             TP203    A |
         1:
                                                Figure 3 — Lower Level Plan
                                                                       Page 37 of 99

Section 38

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022


6          ORGANISATIONAL STRUCTURE

Author           Director Executive Services, Debra Iezzi
                 Executive Services Department

Index            ECM/ Organisational Structures

Attachments      1.    Proposed Organisational Structure
                 2.    New Permanent Positions
                 3.    New Temporary Project Positions
                 4.    All Temporary Project Positions

EXECUTIVE SUMMARY
The organisational structure is the framework around which Council’s operations are resourced to
achieve organisational aims. The review of the organisational structure including positions is
undertaken and reported bi-annually to Council. The purpose of this review is to identify any
changes needed to support the delivery of Council services and projects. Any proposed increase
in the positions, which make up the organisational structure, will result in an increase in employee
costs and have a continuing impact on Council’s operating budget, consequently management
oversight is required. This report outlines proposed changes to the organisation structure for
Council’s information and deliberation.
RECOMMENDATION
That Council note the report by the Director Executive Services Department to the General
Committee Meeting dated 14 February 2022 and adopt the Noosa Council Organisational Structure
as set out in Attachment 1 to the report.

REPORT
The purpose of this report is to highlight changes which have occurred to the organisational
structure since 30/6/21 when Council reviewed and adopted a revised organisational structure in
conjunction with the 2021/22 Operational Plan and Budget.
The attached proposed organisational structure (Attachment 1) identifies current Equivalent Full-
Time positions (EFT) for each Department and Branch. Once adopted by Council it cannot be
changed without a Council resolution. The CEO can approve changes to the underlying detailed
structure of Branches if the overall approved EFT is not changed. This gives management the
flexibility to fine tune the detailed structure as required.
The proposed changes to the organisational structure recommended for approval will increase the
EFT by 2.6, from 384.11 to 386.71. The proposed organisational structure changes by Department
are shown in Attachment 2.
This report also identifies temporary project positions greater than 1 year associated with various
Council projects. These positions will expire at the conclusion of the projects and are not included
in the EFT count however they are essential to the delivery of major projects and do have budgetary
implications. The status of temporary project positions (greater than 1 year) is regularly reported
for Council’s information in the 6 monthly establishment report. Council’s attention is drawn to 4
new temporary positions associated with various projects, refer to Attachment 3. A full list of new
and existing temporary project positions is detailed in Attachment 4.
Previous Council Consideration
Special Meeting, 30 June 2021 Item 5, Page 11
That Council note the report by the Chief Executive Officer to the Special Meeting dated 30 June
2021 and adopt the Noosa Council Organisational Structure as set out in Attachment 1 to the
report.

                                                                                     Page 38 of 99

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                  14 FEBRUARY 2022


Finance
Provision exists within the 2021-2022 budget to fund the proposed changes to the permanent
organisational structure.

Risks & Opportunities
The proposed changes to the EFT and organisational structure are the result of emerging issues
and the need for greater administrative and professional support in the delivery of Council services.
The proposed changes have been reviewed by the Executive Team and are supported. In relation
to temporary project positions, a potential risk is that under the current Noosa Council Certified
Agreement 2018, a casual or maximum term employee working on a systematic and regular basis
for a period of 12 months may apply to convert their status to permanent full time or part time
position depending on the average hours worked over the preceding 12 months. Conversion would
not occur if the appointment was for a specific project or is backfill for staff on leave for a specified
period where there is a defined end date.
While temporary positions provide flexibility for Council particularly in the delivery of significant
projects where specialised skills and experience is required, the salary costs of these positions
require management oversight. The extension of existing temporary project positions and the
creation of new permanent positions are reviewed in the budget approval process.

Consultation
External Consultation - Community & Stakeholder
Nil

Internal Consultation
The Executive Team (including the Director Corporate Services) and various managers were
consulted in the preparation of this report.

Departments/Sections Consulted:

 X    Chief Executive Officer   X   Community Services                      X   Corporate Services
      Executive Support             Director                                    Director
                                    Community Development                       Financial Services
                                    Community Facilities                        Fleet
                                    Libraries & Galleries                       ICT
                                    Local Laws                                  Procurement
                                    Waste & Environmental Health                Property
                                                                                Revenue Services

 X    Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
      Director                      Director                                    Director
      Community Engagement          Building & Plumbing Services                Asset Management
      Customer Service              Development Assessment                      Buildings and Facilities
      Governance                    Economic Development                        Civil Operations
      People and Culture            Environmental Services                      Disaster Management
                                    Strategic Land Use Planning                 Infrastructure Planning,
                                                                                Design and Delivery




                                                                                           Page 39 of 99

Section 40

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 40 of 99

Attachment 1          Proposed Organisational Structure                                  Functions

                                                                                        TOTAL EFT —- 386.71

                                                           Interrial:Aucit                  Chief Executive
                                                                                                  Officer
                                                           CEO's Office                            1 EFT
                                                              2 EFT

                                                                                           Environment and
                in es ae ae                          Executive Services                      Sustainable                         Community Services                         Corporate Services
                Infrastruct                                :      :                               A                                      :      ;                                         y
                426.7 EFT*                              31.31 EFT                           Development                              128.40 EFT                                 44.2 EFT*
                    ,                                                                         53.1 EFT
          ¢  Infrastructure Planning,            e  People and Culture                  ¢ Strategic Land Use                   *  Community Development                   2) linenclal Services
             Design and Delivery                 e  Governance                             Planning                            ¢  Community Facilities                    e  Revenue Services
          ¢ Asset Management                     e  Customer Service                    ¢  Economic Development                ¢  Libraries and Galleries                 e  Information, —
          e  Buildings and Facilities            ¢  Community Engagement                ¢  Development                         e  Local Laws                                 Communications and
          ¢  Civil Operations                                                              Recessment                          e  Waste and Environmental                    Technology
                                                                                        ¢  Building and Plumbing                 Health                                   ° Piseareient
                                                                                        e  Environmental Services                                                         S  rroueny

Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
Further details are available on the individual branch/team structures.
*The structure is subject to council approval

                                                                                                                           Page 40 of 99

Section 41

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 41 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                      14 FEBRUARY 2022

                                                                                     Management

                                                                 Intemal Audit
                                                                                          CHIEF EXECUTIVE
                                                                                              OFFICER
                                                                                                1 EFT
                                                                 CEO's Office

                                         Director Infrastructure   Director Executive     pee plea                Director Community       Director Corporate
                                              Services               Services               anesustainad’é             Services                Services
                                                                                             Development

                                                                                                                                                                        Total EFT: 3

                                                                                                               Page 41 of 99

Section 42

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 42 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                              14 FEBRUARY 2022

                                                                                     Community Services

                                                                                          DIRECTOR                    Administrative
                                                                                   COMMUNITY SERVICES                    Support
                                                                                                                          1 EFT
                                                                                             1 EFT

                         Waste and                          Local Laws                 Community Facilities                    Community                   Libraries and Galleries
                     Environmental Health                   12.7 EFT                      Management                          Development                      Management
                          19.85 EFT                           .                              3.4 EFT                            6.2 EFT                           2 EFT

                                                      Noosa Aquatic Centre  Noosa Leisure Centre     be                 eee                           Libraries           Art Gallery
                                                          19.56 EFT              8.41 EFT             46 EFT               20.27 EFT                  24.71 EFT            4.7 EFT

        Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
        Further details are available on the individual branch/team structures.                                                                                                   Total EFT: 128.40

                                                                                                                        Page 42 of 99

Section 43

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 43 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                               14 FEBRUARY 2022

                                                                                       Corporate Services

                                                                                                DIRECTOR                    Administrative
                                                                                         CORPORATE SERVICES                     Support
                                                                                                   1 EFT                        0.6 EFT

                          Property                 Financial Services            Revenue Services                    ICT                        Procurement                       Fleet
                           a                           9.4 EFT                       6.5 EFT                       12.5 EFT                      4.2 EFT*                        4 EFT

        Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
        Further details are available on the individual branch/team structures.
        *The structure is subject to council approval                                                                                                                               Total EFT: 44.2

                                                                                                                         Page 43 of 99

Section 44

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 44 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                            14 FEBRUARY 2022

                                                               Environment and Sustainable Development

                                                                                           DIRECTOR
                                                                                     ENVIRONMENT AND                    RUPIRIStraHVS
                                                                                        SUSTAINABLE                       Support
                                                                                        DEVELOPMENT                        TERT
                                                                                              1 EFT

                                         Environmental Services   Tee Tod Use          Economic Development!     eins               Building and Plumbing
                                                16 EFT                15 EFT                 2.6 EFT               17.5 EFT               13.5 EFT

        Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
        Further details are available on the individual branch/team structures.                                                                                                Total EFT: 53.1

                                                                                                                     Page 44 of 99

Section 45

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 45 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                            14 FEBRUARY 2022

                                                                                      Executive Services

                                                                                      DIRECTOR EXECUTIVE                 saeenraenies
                                                                                             SERVICES                      Support
                                                                                                EFT                        0.6 EFT

                                           People and Culture                 Governance                    Customer Service                   sreeemean
                                                13.1 EFT                        4 EFT                          9.01 EFT                         hacen

        Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
        Further details are available on the individual branch/team structures.                                                                                                Total EFT: 31.31

                                                                                                                      Page 45 of 99

Section 46

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 46 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                                 14 FEBRUARY 2022

                                                                                      Infrastructure Services

                                                                                               DIRECTOR
                                                                                           INFRASTRUCTURE                   Director's Office
                                                                                                SERVICES                        SEPT
                                                                                                   1 EFT

                                                 ae a                     Asset Management           Buildings and Facilities     Civil Operations           Strategic Projects
                                               esign and Bellvery              9 EFT                        6 EFT                    91.7 EFT                    1 EFT*
                                                   15 EFT

        Note — Fixed term appointments approved by Council are not included within the EFT totals as shown on this structure.
        Further details are available on the individual branch/team structures.
        *The structure is subject to council approval                                                                                                                                  Total EFT: 126.7

                                                                                                                           Page 46 of 99

Section 47

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 47 of 99

GENERAL COMMITTEE MEETING AGENDA                                                         14 FEBRUARY 2022

     Attachment 2 New Permanent Positions

      Corporate Services       Procurement          Procurement Administration         2      The creation of the new part time position of Procurement
                                                    Officer                                   Administration Officer at .6 EFT is required to support
                                                                                              procurement activities and to accommodate a change in
                                                                                              employee work arrangements. It will be offset by a reduction in
                                                                                              the full-time position of Procurement and Contracts Advisor
                                                                                              (PO 10039) from 1 to .6. This will result in a net increase in the
                                                                                              EFT for the Branch from 4 to 4.2.

      Community Services       Libraries and        Digital Services Librarian,               The increase in the part time position of Digital Services
                               Galleries                                                      Librarian (PO10295) currently .6 to full time is required to meet
                                                                                              increased demand for digital services. It will be offset against a
                                                                                              reduction in the EFT casual budget by 4. This has a zero net
                                                                                              impact on the EFT for the branch.
       Development             Development          Short Stay Compliance                     The position of Short Stay Compliance Supervisor was
     Assessment               Assessment            Supervisor                                previously reported to council and created as a temporary
                                                                                              position. This was an error as the position was required to be
                                                                                              ongoing and should have been created as permanent full time.
                                                                                              This will increase the EFT for the branch from 16.5 to 17.5.
       Infrastructure Services | Strategic Projects Project Officer                           The Special Projects Team is a newly created team established
                                                                                              to progress special infrastructure projects. The position of
                                                                                              Project Officer was previously appointed to the Infrastructure
                                                                                              Planning, Design and Delivery Branch however because of the
                                                                                              restructure the position has been moved to the Special Projects
                                                                                              Team. The position (PO10101) is currently 6 EFT. It is
                                                                                              proposed that this position be increased to 1 EFT. This will
                                                                                              increase the EFT of the Team from .6 to 1 and provide a higher
                                                                                              level of project support.
       Infrastructure Services | Infrastructure     Infrastructure Planning Co-               A review of the Branch’s operations and the requirements for
                               Planning, Design    ordinator                                  the delivery of the future capital programme has identified the
                               and delivery                                                   need for a new permanent full-time position of Infrastructure
                                                                                              Planning Co-ordinator (PO10716).
                                                                                              The creation of this position will increase the EFT of the branch
                                                                                              to 15.

                                                                                                 Page 47 of 99

Section 48

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 48 of 99

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022

      Attachment 3 New Temporary Project Positions

       Environment and          Economic           Economic                                Purpose-to assist in progressing the implementation of the Local
       Sustainable              Development        Development               10708         Economic Plan.
      Development                                  Advisor                                 Proposed term 2 yrs to 14/4/23.
       Infrastructure Services  Infrastructure     Project Manager           10717         Purpose-to assist with the management of infrastructure projects
                                Planning, Design                                           in the capital works programme.
                                and Delivery

       Infrastructure Services  Infrastructure     Project Manager           10718         Purpose-to assist with the management of infrastructure projects
                                Planning, Design                                           in the capital works programme.
                                and Delivery

       Infrastructure Services  Infrastructure     Project Officer           10719         Purpose-to assist with the management of infrastructure projects
                                Planning, Design                                           in the capital works programme.
                                and Delivery

                                                                                       Page 48 of 99

Section 49

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 49 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                                            14 FEBRUARY 2022

      Attachment 4 Temporary Project Positions
      Temporary Project Positions (with terms 12 months and greater, excluding leave backfill arrangements)
Pe                                ee em
                   Strategic Land Use Planning |Principal Strategic            Temporary Full Time (3 years, 19/10/16 - |Purpose-to meet project demands associated with the new planning scheme.
                                            Planner                            19/10/19), term extended to 30/6/20. term Originally approved OM 17/12/15.
                                                                              extended to 31/12/20, term extended to Extension granted to 30/6/20 OM 15/12/19.
                                                                              30/6/21, term extended to 30/6/22,     Extension granted to 31/12/20 by CEO and Special Meeting 10/7/20.
                                                                               extension required to 30/9/22.        Extension granted to 30/6/21 OM 17/12/20.
                                                                                                                     Extension granted to 30/9/22 Special Budget meeting 30/6/21.
                                                                                                                     Further extension required to 31/12/22. It is proposed that a submission to be made to the 22/23 budget to have the temporary position converted to permanent
                                                                                                                     given the length of time that has elapsed and given the position now coordinates the place program and project mangers the Shire business centre development
                                                                                                                     land associated planning scheme amendment process currently underway.
                                                                                                                     Salary provision for this position exists within the 21/22 budget (operational and part capital (place program)). Salary budget for further extension beyond
                                                                                                                     30/6/21 to be included subject to approval in the budget.
                   Strategic Land Use Planning |Project Coordinator - 10563    ‘Temporary Full Time (2 years, 06/02/170- |Purpose-to develop the Noosa Counc’ Coastal Hazard Adaption Strategy.
                                            ‘Climate Change                    05/02/19), term extended to 31/12/19, term |Orginally approved at OM 15/12/16.
                                            Adaptation                         extended to 31/12/20, term extended to Term extended to 31/12/19 OM 17/12/18 given the revised agreed project completion date for the Noosa Council Coastal Hazard Adaption Strategy.
                                                                              30/6/21, extension granted to 30/6/22, Extension granted to 30/6/20 OM 15/12/19 to undertake the completion of the broader shire wide adaption planning and a review of the structure of the
                                                                               further extension required to 21/10/22. department.
                                                                                                                     Extension granted to 31/12/20 by CEO and Special Meeting 10/7/20.
                                                                                                                     Extension granted to 30/6/21 OM 17/12/21.
                                                                                                                     Extension granted to 30/6/22 Special Budget Meeting 30/6/21.
                                                                                                                     Further extension required to 21/10/22. The position is to be reviewed as part of the CHAP and associated resourcing requirements.
                                                                                                                     Salary provision for this position exists within the 21/22 budget. Salary budget for future years to be included subject to approval in the budget.

                   Strategic Land Use Planning |Place Program                  Temporary Full Time (12 mths)        |Purpose-to co-ordinate a pilot place making programme.
                                            (Coordinator                                                             Originally endorsed by ET 16/1/19. Project funding provided in 2021 budget Special Meeting 10/7/20.
                                                                                                                     Recruitment to this position on hold to be reviewed in 22/23 budget.
     E&SD          [Development Assessment   |DevelopmentPlanner   [10577      [Temporary Full Time (3 years, 27/08/18- |Purpose-To assist in processing planning applications and in meeting high workloads in the DA Branch.
                                                                              26/08/21), extension granted to 11/1/24. Term extended in leiu of creating the temp. full time Planning Officer position approved as a PMI in the 17/18 Budget Special meeting 6/7/18.
                                                                                                                     Extension granted by CEO to 24/11/23.
                                                                                                                     Extension granted to 11/1/24 OM 17/12/21.
                                                                                                                     Salary provision for this position exists within the current operating budget.
                   [Development Assessment |Development Planner                ‘Temporary full time (3 yrs 3/6/19 - 3/6/22), |Purpose-to assist in processing planning applications and in meeting workloads of the DA Branch.
                                                                               extension granted to 30/6/25.         Approved Council OM 9/4/19 and also reported to Council Special Meeting 28/6/19.
                                                                                                                     Extension granted to 30/6/25 by Special Meeting 30/6/21 to meet continuing high DA workloads.
                                                                                                                     Salary provision for this position exists within the current operating budget.
     E&sD          Development Assessment [Development Engineer | 10623       [Temporary Full Time 3 yrs (18/3/19 -  Purpose-to assist in processing planning applications and in meeting workloads of DA Branch.
                                                                               18/3/22), extension granted to 8/3/24. Approved Council OM 9/4/19 and reported to Council Special Meeting 28/6/2019.
                                                                                                                     Extension granted to 8/3/24 by Special Meeting 30/6/21 to meet continuing high DA workloads.
                                                                                                                     Salary provision for this position exists within the current operating budget.
                   [Development Assessment |DA Admin Support       10687      | Temporary Part time (.6 EFT) for 3 year term|Purpose-to meet increased admin. workloads associated with an increase in DA applications and requirements.
                                            Officer                           |20/7/21-1 8/7/24.                     Approved Special Budget Meeting 30/6/21.
                                                                                                                     Salary provision for this position exists within the current operating budget.
     E&sD          [Development Assessment |Development Planner                Temporary Full Time 3 years concluding Purpose-to meet high workloads associated with an increase in DA applications and DA approval requirements.
                                            (note Graduate                    30/8/24.                               Approved Special Budget Meeting 30/6/21.
                                            Development Planner                                                      Salary provision for this position exists within the current operating budget.
                                             appointed in substitution)
                   [Development Assessment |Compliance Officer     10728       Temporary Full Time (3 years to 2024) |Purpose-to suppport the implementation of the new STA Local Law.
                                                                                                                     Position created Council OM 12 October 21.
                                                                                                                     Salary provision for this position exists within the current operating budget. Salary budget for future years to be included subject to approval in the budget
                   [Development Assessment |Compliance Officer                 Temporary Full Time (3 years to 2024) Purpose-to suppport the implementation of the new STA Local Law.
                                                                                                                     Position created Council OM 12 October 21.
                                                                                                                     Salary provision for this position exists within the current operating budget. Salary budget for future years to be included subject to approval in the budget

                                                                                                                                       Page 49 of 99

Section 50

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 50 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                                                  14 FEBRUARY 2022

      E&SD          Economic Development     Digital Hub Director    10505       Temporary Full Time (2 years, 05/03/18- |Purpose- to facilitate the Peregian Hub’s Implementation Plan.
                                                                                04/03/20), term extended to 12/3/23.   (Originally approved by Council at OM 16/11/17.
                                                                                                                       |A review of the role relative to the future direction of the HUB was undertaken in August 19 and the term was extended to 12/3/23 OM 15/8/19.
                                                                                                                        Salary provision for this position exists within the current operating budget.
      E&SD          Economic Development     [Economic Development |10708        |Temporary Full Time (2 years to 14/4/23). |Purpose-to assist in progressing the implementation of the LEP.
                                             Advisor                                                                   Proposed term 2 yrs to 14/4/23. Approved by CEO.
                                                                                                                        Salary provision for this position exists in the 2021/22 budget. Salary budget for future years to be included subject to approval in the budget. New
      E&SD          [Environmental Services  Principal Environment              [Temporary Full Time (3 years) ending  Purpose-to implement the programme to progress the Noosa River Pian.
                                             \Officer-River Strategy &          30/6/22, extension required to June 2024. [Approved Council Special Meeting 28/6/19.
                                             Management                                                                 Further extension required until June 2024 as a result of the position being vacant..
                                                                                                                        Salary provision for this position exists in the 2021/22 Environment Levy programmes budget. Salary budget for future years to be included subject to approval in
                                                                                                                       the budget.
      E&SD          [Environmental Services   [Bushland Regeneration | 10665     [Temporary Full Time to 31/12/21, extended /Purpose-to undertake new conservation projects including in the coastal dunes, maintaining and expanding current sites and providing support to the Natural
                                             iGanger                            to 31/3/21, further extension required to |Areas Team.
                                                                                30/6/22.                                (Original term to 31/12/21 however term extended to 31/3/21 by Manager.
                                                                                                                       Further extension required to 30/6/22 to progress bushland regeneration efforts.
                                                                                                                        Salary provision for this position exists in the 2021/22 budget.
      E&sD          Environmental Services    [Bushland Regeneration | 10663     Temporary Full Time to 31/12/21, extension |Purpose-to undertake new conservation projects including in the coastal dunes, maintaining and expanding current sites and providing support to the Natural
                                              Worker                            required to 30/6/22.                   Areas Team.
                                                                                                                        Extension required to 30/6/22 to progress bushland regeneration efforts.
                                                                                                                       ‘Salary provision for this position exists in the 2021/22 budget.
                    Environmental Services   Bushland Regeneration | 10664      |Temporary Full Time to 31/12/21, extension |Purpose-to undertake mew conservation projects including in the coastal dunes, maintaining and expanding current sites and providing support to the Natural
                                              Worker                            required to 30/6/22.                   |Areas Team.
                                                                                                                        Extension of term required to 30/6/22 to progress bushland regeneration efforts.
                                                                                                                       ‘Salary provision for this position exists in the 2021/22 budget.
      E&sD         Environmental Services     Bushland Regeneration | 10662      Temporary Full Time to 31/12/21, extension |Purpose-to undertake new conservation projects including in the coastal dunes, maintaining and expanding current sites and providing support to the Natural
                                              Worker                            required to 30/6/22.                   |Areas Team. Note-Subject to grant approval.
                                                                                                                        Extension of term required to 30/6/22 to progress bushland regeneration efforts.
                                                                                                                        Salary provision for this position exists in the 2021/22 budget.
      is            Infrastructure Planning. Project Manager -       10506       [Temporary Full Time (2 years, 2407/18- = |Purpose-to co-ordinate the development of the transport strategy and the implementation of initiatives.
                    [Design and Delivery      Transport innovation              23/07/20), term extended to 24/12/22.     pproved Council OM 20/07/17. Filled under an internal secondment arrangement by Project Manager.
                                              (renamed to Project                                                       ‘erm extended to 24/12/20 by CEO.
                                             Manager - Special                                                          Further extension granted to 24/12/22 Special Meeting 10/7/20.
                                              Projects)                                                                ‘Salary provision for this position exists within the Sustainable Tpt. Levy budget.
      is            Infrastructure Planning,  Project Officer -                  Temporary Part Time (0.6 FTE)(3 years. |Purpose-to assist in advancing the behaviour change components of the Transport Strategy.
                    [Design and Delivery      Transport                         25/11/2018 - 24/11/2022)                  pproved OM 19/8/19.
                                                                                                                        Salary provision for this position exists within the Sustainable Tpt. Levy budget.
      is           Infrastructure Planning.   Designer - Capital Works           [Temporary Full Time (3 years, 2602/18- |Purpose-to ensure efficient and effective delivery and oversight of the capital works programme. Approved Counc’ OM 16/11/17.
                    [Design and Delivery                                        25/02/21), extended to 25/2/23.         Further extension endorsed by ET.
                                                                                                                        Further extension granted to 25/2/23 OM 17/12/20
      is           Infrastructure Planning.  Project Coordinator     10628      [Temporary Full Time (3 years, 28/1/20 - [Purpose-to ensure efficient and effective delivery and oversight of the capital works programme
                    [Design and Delivery                                         17/1/23), extension required to 30/6/25. pproved Council Special Meeting 28/6/19.
                                                                                                                        Further extension required to 30/6/25 to meet future capital works programme.
                                                                                                                        Endorsed by ET.
                                                                                                                        Salary provision for this position exists within the 2021/22 budget. Salary budget for future years to be included subject to approval in the budget.
                   Infrastructure Planning.   Contracts and Project  10628      [Temporary Full Time (3 years, 8/7/19 - |Purpose-to ensure efficient and effective delivery and oversight of the capital works programme
                    [Design and Delivery      Superintendent                    8/7/22), extension required to 20/6/25.   pproved Council Special Meeting 28/6/19.
                                                                                                                        Further extension required to 30/6/25 to meet future capital works programme
                                                                                                                        [Endorsed by ET
                                                                                                                        Salary provision for this position exists within the 2021/22 budget. Salary budget for future years to be included subject to approval in the budget.

                                                                                                                                              Page 50 of 99

Section 51

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 51 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                                                    14 FEBRUARY 2022

     is           Infrastructure Planning,  Infrastructure Planning             [Temporary Full Time (3 years ending    Purpose-to assist with planning, designing and delivering Council's ongoing Capital Works programme, Transport and Placemaking Projects.
                   [Design and Delivery     Officer                              10/8/23), extension required to 30/6/25. Approved Council OM 1012/18.
                                                                                                                        Further extension required to 30/6/25 to meet future capital works programme. Endorsed by ET
                                                                                                                        Salary provision for this position exists within the 2021/22 budget. Salary budget for future years to be included subject to approval in the budget.

     is           Infrastructure Planning,   Designer - Capital Works} 10659    Temporary Full Time from 1/2/21-26/3/23. |Purpose-to assist with the design and delivery of the Tewantin Bypass Stage 1 Project and Capital Works programme.
                   [Design and Delivery                                                                                 Endorsed by ET 17/11/20.
                                                                                                                        [Approved by Council OM 17/12/20.
                                                                                                                       Salary provision for this position exists within the current capital budget.
      Ss           Infrastructure Planning,  Designer - Capital Works |10683    Temporary Full Time from 27/3/21-26/3/23. |Purpose-to assist with the design and delivery of the Tewantin Bypass Stage 1 Project and Capital Works programme.
                                                                                                                        Approved by Council OM 17/12/20.
                                                                                                                       Salary provision for this position exists within the current capital budget.
     is            Infrastructure Planning.  Project Officer! Graduate | 10684  ‘Temporary Full Time for 3 years ending Purpose-to assist with the coordination and management of infrastructure projects in the capital works programme.
                   [Design and Delivery      Engineer Projects                  9/5/23.                                 Endorsed by ET 17/11/20.
                                                                                                                        Approved by Council OM 17/12/20.
                                                                                                                       Salary provision for this position exists within the current capital budget.
     is            Infrastructure Planning,  Project Officer!Graduate | 10685   |Temporary Full Time for 3 years to 6/9/24. |Purpose-to assist with the management of infrastructure projects in the capital works programme. Endorsed by ET 17/11/20.
                   [Design and Delivery      Engineer Projects                                                          Approved by Council OM 17/12/20.
                                                                                                                       Salary provision for this position exists within the current capital budget.
            ine                                                                              ee                                                                                                        ee
                   [Design and Delivery      [Communications and                 10/4/24.                               [Approved by Council OM 17/12/20.
                                            |Consultation Officer                                                       Further extension granted to 30/6/25 by Council Special Meeting 30/6/21.
                                                                                                                       Salary provision for this position exists within the current capital budget.
     is            Infrastructure Planning.  Project Manager                    [Temporary Full Time 3 yrs ending 30/6/25 | Purpose-to assist with the management of infrastructure projects in the capital works programme.
                   [Design and Delivery                                                                                 Endorsed by ET .
                                                                                                                        Salary provision for this position exists within the 2021/22 capital works budget. Salary budget for future years to be included subject to approval in the budget.
                                                                                                                        New
                   Infrastructure Planning.  Project Manager                    [Temporary full time 3 yrs ending 30/6/25 Purpose-to assist with the management of infrastructure projects in the capital works programme.
                   [Design and Delivery                                                                                 Endorsed by ET.
                                                                                                                       Salary provision for this position exists within the 2021/22 capital works budget. Salary budget for future years to be included subject to approval in the budget.
                                                                                                                        iNew
     is            Infrastructure Planning.  Project Officer                    [Temporary full time 3 yrs ending 30/6/25 Purpose-to assist with the management of infrastructure projects in the capital works programme.
                   [Design and Delivery                                                                                 Endorsed by ET.
                                                                                                                        Salary provision for this position exists within the 2021/22 capital works budget. Salary budget for future years to be included subject to approval in the budget.
                                                                                                                        iNew
     is             Sse                     |Asset Technical Officer,           ‘Temporary Full Time (3 years, 16/8/19- Purpose-to ensure alignment of engineering and accounting data and sufficient accurate information
                                             |Asset Data Improvement            2/8/22), extension required to 10/6/23. [Approved Council Special Meeting 28/6/19.
                                             Project renamed to Co-                                                    Extension required to 10/5/23 (note-position vacated, new appointment made, additional term required to attract applicant).
                                             ordinator Asset Systems                                                    Salary provision for this position exists within the current capital budget. Salary budget for future years to be included subject to approval in the budget.
     is            Buildings and Facilities  [Electrical apprentice             ‘Temporary full time (4 years 30/9/19-  Purpose-to improve efficiency and effectiveness of branch operations and WFP requirements.
                                                                               29/9/23).                               Approved Council Special Meeting 28/6/19.
                                                                                                                        Salary for this position exists within the current operating budget
     is            Director's Office        |Aministration Officer  10698       ‘Temporary Full Time 3 yrs to 13/10/23  Purpose-to support increased adminstraitive workloads assocated with the increased capital works programme.
                                                                                                                       Approved Council Special Meeting 30/6/21.
                                                                                                                       Salary provision for this position exists within the current capital budget.
     Corp S        Director's Office         Special Projects Advisor | 10605   [Temporary Full Time (3 years, 1/10/18 - Purpose-to facilitate the delivery of Council's CiAnywhere Enterprise Budgeting system and to meet to meet project demands. Filled under an intemal
                                                                                30/09/21), extension granted to 3/12/21, secondment arrangement by Financial Accountant.
                                                                               further extension granted to 3/12/24.   Originally approved by the CEO for an initial 18 month period.
                                                                                                                        Term extended by 3 years to 3/12/21 Council OM 20/12/18.
                                                                                                                       Extension granted Council Special Meeting 30/6/21.
                                                                                                                        Salary provision for this position exists within the current capital budget.
    Corp S                                   Project Officer, renamed |10617   |Temporary Full Time (2 yrs, 9/12/19-    Purpose-To provide support the implementation of the new Property and Rating system.
                                            ICT System Analyst                   10/12/21), extension granted to to 10/12/24. |Approved Council OM 9/4/19.
                                                                                                                       Intemal secondment arrangement Project Officer P&C Systems.
                                                                                                                        Extension granted 10/12/24 by Council Special meeting 30/6/21.
                                                                                                                       Salary provision for this position exists within the current capital budget.

                                                                                                                                               Page 51 of 99

Section 52

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 52 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                                                  14 FEBRUARY 2022

                                             Systems Support Officer            [Temporary Full Time (2 years - 8/12/20 to + =|Purpose - Temporary role for a penod of 2 years to assist the Noosability Team.

                   [Property                 Property Progect Officer, | 10625  Temporary Full Time (3 years, 2/2/19- Purpose-To ensure the delivery of key pnority projects, improve efficiency and fill service gaps.
                                             renamed property                   1/8/22).                              Approved Council Special Meeting 28/6/19.
                                            |Advisor-Commercial                                                       Salary provision exists within the current operating budget for this position
                   Financial Services        Project Accounting     10632      [Temporary Full Time (3 years).        Purpose-to ensure alignment of engineering and accounting data and sufficient accurate information, asset data improvement project.
                                            Officer renamed to                                                        [Approved Council Special Meeting 28 June 2019. Note: Position not filled.
                                             Finance Project Officer                                                   Salary provision for this position exists within the current capital budget. A submission will be made to the 22/23 budget for the position to be redesigned to a
                                             (Capital Works & Asset                                                   temporary graduate role for 2 years.
                   Financial Services           SSS                             Temporary Full Time (16/0/10 - 16/0/20, |Purpose-to provide support to the branch given the absence of the Management Accountant.
                                                                               further extension granted 17/9/20 -    Extension granted to 31 December 2021 OM 17/12/20.
                                                                                31/12/20), extension granted to 31/12/21, |Extension granted to 30/6/22 Council Special Meeting 30/6/21.
                                                                               Extension granted to 30/6/22, further  Further extension required to 31/12/22.
                                                                               lextension required to 31/12/22.        Salary provision for this position exists within the current operating budget. Salary budget for future years to be included subject to approval in the budget.
                                             Procurement & Contracts | 10578    [Temporary Full Time (3 years Level 6 from |Purpose-to support short & medium term procurement needs associated with an increase in the capital programme.

                   ‘Community Development   |Community Development | 10658     ‘Temporary Full Time (2 years, 1/7/20- Purpose-to enable effective delivery of bushfire community recovery activities, the CD Branch Plan and social strategy initiatves. Temporary position identified
                                         a                                                                            Salary provision for this position to be met by Bushfire R,  z
                                            |Governance Project     10688       Temporary Full Time                    Purpose-to provide additional support to the Governance Branch and subject to the outcomes of the service review of the branch.
                                             Officer                            (6 - 12 months, term extended to 2/5/22) Endorsed by ET 25/11/20.
                                                                                                                      Approved by Council OM 17/12/20 6-12 months term. Term extended to 2/5/22 whilst service review undertaken.
                                                                                                                      Salary provision for this position exists within the current Governance Branch salary budget.
                                            |Governance Systems     10689       Temporary Full Time                    Purpose-to assist in the implementation of corporate governance reporting systems.
                                             Officer                           (3 years to 20/11/24 )                  Endorsed by ET 25/11/20.
                                                                                                                       Approved by Council OM 17/12/20.
                                                                                                                      Salary provision for this position exists within the current operating budget. Budget for future years to be reviewed as part of the ICT capital programme.
                   People and Culture        People and Culture     10668      [Temporary Part Time/Full Time          Purpose-To support the delivery of the program of work and increase service coverage to the business areas.
                                            Advisor                             (12 months, 06/0 1/21 - 06/01/22), extension [Endorsed by ET 14/10/2020.
                                                                               granted to 30/6/24.                     Approved by Council OM 17/12/20.
                                                                                                                      [Extension granted to 30/6/24 by Special Council Meeting 30/6/21.
                                                                                                                       Salary provision for this position exists within the current operating budget. Salary budget for future years to be included subject to approval in the budget.
                   People and Culture        People and Culture                | Temporary Part Time/Full Time (12 months |Purpose-to provide additional support to Civil Operations Branch in the implementation of outcomes of the Civil Operations Service Review. Original term 1/7/21-
                                            Advisor                             1/7/21-30/6/22), extension required to 30/6/22.
                                                                               30/6/23.                               Extension required to 30/6/23 to assist in the implementation of the review of the Branch.
                                                                                                                       Salary provision for this position exists within the Civil Operations salary budget (vacancies). Salary budget for future year to be met from the Civil Operations
                                                                                                                       salaries budget (vacancies).

                                                                                                                                              Page 52 of 99

Section 53

GENERAL COMMITTEE MEETING AGENDA                                             14 FEBRUARY 2022


7    COUNCILLOR REPRESENTATION ON COUNCIL OF MAYORS WORKING GROUPS

Author           Acting Chief Executive Officer, Larry Sengstock
                 CEO’s Office

Index            ECM/ Subject / 27.61 Council of Mayors

Attachments      1.    Invitation letter from Council of Mayors for Working Groups


EXECUTIVE SUMMARY
The Council of Mayors (SEQ) meets on a regular basis and addresses issues affecting south-east
Queensland. The Mayors of those member councils work together to advocate to other levels of
government on SEQ Council needs. The Council of Mayors (CoMSEQ) also operate various
working groups which provide an opportunity for Councillors to get involved in policy development
and major projects that have an impact on SEQ. The Council of Mayors have written to Council
inviting nominations for Noosa Councillors and staff to be involved in such working groups.
This report seeks to formalise the appointments of Noosa Shire Councillors to the following three
working groups that CoMSEQ have requested to date:
1.   SEQ2032 Legacy Working Group
2.   SEQ Waste Working Group
3.   SEQ Economic Development Working Group

RECOMMENDATION
That Council note the report by the Acting Chief Executive Officer to the General Committee
Meeting dated 14 February 2021 and
1.   Appoint Cr Stewart as Council’s representative on the SEQ 2032 Legacy Working Group;
2.   Appoint Cr <insert name> as Council’s representative and Cr <insert name> as the proxy for
     the SEQ Waste Working Group;
3.   Appoint Cr <insert name> as Council’s representative and <insert name> as the proxy for
     the SEQ Economic Development Working Group.

REPORT
The purpose of this report is to nominate representation on the following Council of Mayors Working
Groups, which aim to encourage regional collaboration and coordination across a number of key
project areas.
•    SEQ 2032 Legacy Working Group
     Identify, collaborate and work on regional legacy and advocacy priorities for SEQ ahead of
     the 2032 Brisbane Olympic and Paralympic Games.
     As nominations were required urgently for this group, the Mayor, CEO and Director of
     Infrastructure were selected as the nominees for this Group. This report formalises that
     appointment.
•    SEQ Waste Working Group
     The focus of this working group is to provide support in the implementation of the SEQ Waste
     Management Plan. It also provides a forum for councils to share learnings and engage with
     industry and government partners.
     Council are invited to nominate one primary Councillor with a proxy Councillor and one
     Council waste management officer. The staff appointment will be nominated by the CEO.

                                                                                    Page 53 of 99

Section 54

GENERAL COMMITTEE MEETING AGENDA                                               14 FEBRUARY 2022


•        SEQ Economic Development Working Group
         Provides a forum to explore coordinated strategic economic development opportunities
         across the region; provides a forum for councils to share learnings and engage with industry
         and government partners.
         Council are invited to nominate one primary Councillor with a proxy Councillor and one
         Council Economic Development officer. The staff appointment will be nominated by the
         CEO.
Previous Council Consideration
Council makes a range of Councillor appointments to various working groups, boards and
committees. Those appointments only apply until the time of change of Council following an
election and hence this report identifies these appointments only for the term of this Council.
Finance
Council pays an annual membership fee to the Council of Mayors (SEQ) which includes the
representatives on the working groups.
Risks & Opportunities
The CoMSEQ provides this opportunity for our Council to engage more closely with other SEQ
local governments. Representation on these working groups provides opportunities for our
Councillors to engage with elected representatives from other local governments dealing with these
specific topics and gives Council a further opportunity to raise issues with the CoMSEQ who can
advocate on our behalf.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Nil.
Departments/Sections Consulted:

    X   Chief Executive Officer    Community Services                        Corporate Services
        Executive Officer          Director                                  Director
        Executive Support          Community Development                     Financial Services
                                   Community Facilities                      ICT
                                   Libraries & Galleries                     Procurement & Fleet
                                   Local Laws                                Property
                                   Waste & Environmental Health              Revenue Services

        Executive Services         Environment & Sustainable Development     Infrastructure Services
        Director                   Director                                  Director
        Community Engagement       Building & Plumbing Services              Asset Management
        Customer Service           Development Assessment                    Buildings and Facilities
        Governance                 Economic Development                      Civil Operations
        People and Culture         Environmental Services                    Disaster Management
                                   Strategic Land Use Planning               Infrastructure Planning,
                                                                             Design and Delivery




                                                                                        Page 54 of 99

Section 55

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


   ATTACHMENT 1




                                       Page 55 of 99

GENERAL COMMITTEE MEETING AGENDA                                      14 FEBRUARY 2022

     ATTACHMENT 1
                                                                            8
                                                                            3
                                                                          Boe
                                                                         Ssse
                                                                           eoe®
                                                                     Council of Mayors
                                                                      South Easr Queensland

            20 January 2022

            Mayor Clare Stewart and CEO
            Noosa Council
            PO Box 141
            Tewantin QLD 4565

            Dear Mayor Clare Stewart and Mr Scott Waters,

                                Council of Mayors (SEQ) Working Groups
            Firstly, | would like to thank and congratulate Noosa Council for re-joining the Council of Mayors
            (SEQ) (CoMSEQ).
            As you are aware, CoMSEQ is Australia’s largest regional advocacy organisation representing
            the interests of the Councils across SEQ. CoMSEQ’s mission is to consistently deliver better
            regional funding, policy and collaborative outcomes for the communities of South East
            Queensland. Noosa is an important part of SEQ and by working together, we have an opportunity
            to strengthen our voice and advocacy to other levels of government on key regional matters.
            Thank you for the opportunity to provide an update to Noosa Council in December 2021 about
            CoMSEQ’s key region-shaping initiatives. As highlighted, please find below an overview of
            current COMSEQ working groups. Noosa Council is able to nominate representation on these
            groups which aim to encourage regional collaboration and coordination across a number of key
            project areas.
                 SEQ 2032 Legacy Working Group
                Identify, collaborate and work on regional legacy and advocacy priorities for SEQ ahead of
                the 2032 Brisbane Olympic and Paralympic Games. CoMSEQ recently wrote to you with
                details of this group and | acknowledge your response with nominations.
                 SEQ Waste Working Group
                The focus of this working group is to provide support in the implementation of the SEQ
                 Waste Management Plan. It also provides a forum for councils to share learnings and
                engage with industry and government partners.
                Chair: Mayor Greg Christensen, Scenic Rim Regional Council
                Noosa Council Membership: One primary Councillor with a proxy Councillor and one
                Council waste management officer.
                 SEQ Economic Development Working Group
                Provides a forum to explore coordinated strategic economic development opportunities
                 across the region; provides a forum for councils to share leamings and engage with
                 industry and government partners.
                 Chair. Mayor Paul Antonio, Toowoomba Regional Council
                Council Membership: One primary Councillor with a proxy Councillor and one Council
                 Economic Development officer.

                                                                            Page 55 of 99

Section 56

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 56 of 99

GENERAL COMMITTEE MEETING AGENDA                                      14 FEBRUARY 2022

   Additionally, COMSEQ often engages with Council officers outside of these groups to support a
   range of regional matters such as the Regional Planning process. It would be appreciated if you
   were able to nominate a contact point for Noosa Council for land use and infrastructure planning
    matters.
   Along with this, some councils choose to have a ‘Council Coordinator’ who is the primary contact
   officer for all matters related to Council of Mayors (SEQ). This is not mandatory, however, should
   there be an officer you wish to make our primary contact, we will add them to our distribution lists
   for all matters.
   We're excited to welcome Noosa Council, and on behalf of the CoMSEQ team | look forward to
   working with you and your officers on region-shaping priorities for communities of South East
    Queensland.
   lf you have any questions please do not hesitate to contact me on (07) 3040 3479 or 0417 732
   461 or alternatively Matthew Hendry, Manager Advocacy and Engagement at
   matthew [email protected] or 0417 603 634.
   Yours sincerely

    KA
   Cf

   Scott Smith
   Chief Executive Officer

                             Level 12, 343 Albert Street, Brisbane OLD 4000
                             PO Box 12995, GEORGE STREET, QLD 4003
                         T (07) 3040 3460 F (07) 3211 5889 www.seqmayors.qid gov.au
                                     ABN 87 141 329 302
                                                                            Page 56 of 99

Section 57

GENERAL COMMITTEE MEETING AGENDA                                                           14 FEBRUARY 2022


8      FINANCIAL PERFORMANCE REPORT – JANUARY 2022

Author                Financial Services Manager (Acting), Pauline Coles
                      Corporate Services Department

Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments           1.   Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.   Statement of Financial Position
                      3.   Statement of Cash Flows
                      4.   Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 31 January 2022 is positive with
operating revenues outperforming forecast and operating expenditure below forecast YTD. Capital
revenues are in line with forecast with capital expenditure slightly behind due to the timing of project
delivery. The budget position presented in this report and attachments reflects Budget Review 2
(BR2), which was adopted by Council at the January 2022 Ordinary Meeting.

     YTD Financial Performance Summary
                              Budget             Actual       Variance       Variance
                                                                                                Status
                                 $m                 $m             $m              %
 Operating Revenue                 $95.4             $97.2          $1.8         1.9%         On Track
 Operating Expense                 $61.0             $59.3          $1.7         2.8%         On Track
 Operating Position                $34.4             $37.9          $3.5        10.2%
 Capital Revenue                    $9.8             $10.0          $0.1         1.5%         On Track
 Capital
                                   $20.0             $17.0          $3.0        15.2%       Below Budget
 Expenditure*
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget
    $120
                           $95.4             $97.2
    $100

     $80
                                                                                $61.0       $59.3
     $60

     $40

     $20

      $-
                           Operating Revenue                                  Operating Expenditure
                                           YTD Budget ($m)          YTD Actual ($m)

Council’s performance against key measures of financial sustainability has been calculated as at
January 2022. These indicators enable the reader to assess Council’s success in managing its

                                                                                                    Page 57 of 99

Section 58

GENERAL COMMITTEE MEETING AGENDA                                                      14 FEBRUARY 2022


budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                                    Current
                                    Target                        Actual YTD                Status
                                                    Budget
 Operating Surplus Ratio            0-10%            -0.6%           39.0%                On Track
 Net Financial Liabilities Ratio    <60%            -12.7%           -65.4%             Above Target
 Cash Cover Ratio                  3 months        8.8 months     11.2 months           Above Target
 Asset Sustainability Ratio         > 90%           130.1%           37.3%                On Track

RECOMMENDATION
That Council note the report by the Financial Services Manager (Acting) to the General Committee
Meeting dated 14 February 2022 outlining January 2022 year to date financial performance against
budget, including changes to the financial performance report with the inclusion of key financial
sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 58.3%)
Council has received 89% ($97.1 million) of its operating revenue budget ($109.6 million).
Commentary on each revenue category is provided below.

 Category             Summary                  Comments
 Rates and            $75.9 million (102%)     •   Waste utility charges $444k above YTD budget (102.5%
 Levies               of the annual budget         or $13.6 million of $13.2 million annual budget earned)
                      of $74.8 million has     •   General rate (net of discounts) $179k below YTD budget
                      been earned                  (101.4% or $57.0 million of $56.2 million annual budget
                                                   earned)
 Fees and             $5.7 million (70%) of    •   Development assessment fees $99k above YTD budget
 Charges              the   $8.2     million       (67.4% or $1.6 million of $2.4 million annual budget
                      annual budget has            earned)
                      been earned              •   Plumbing application fees $105k above YTD budget
                                                   (78% or $1.0 million of $1.3 million annual budget
                                                   earned)
                                               •   Revenue Services fees for change of ownership and
                                                   searches $43k above YTD budget (74.1% or $314k of
                                                   $423k annual budget earned)

 Sale of Goods        $7.4 million (67%) of    •   Holiday Park sales $423k above YTD budget (74% or
 and Services         the   $11.1    million       $2.3 million of $3.1 million annual budget earned) –
                      annual budget has            Positive revenue variances that hold through the
                      been received                financial year will be offset in part by additional variable
                                                   operating costs
                                               •   Waste management sale of recoverable materials $309k
                                                   above YTD budget (93% or $1.0 million of $1.1 million
                                                   annual budget earned)
 Interest             $399k (60%) of the       •   Interest revenues on cash invested will need ongoing
 Received             $670k annual budget          monitoring to ensure returns on surplus funds are
                      has been earned              maximised as investment rates begin to increase.
 Other Revenue        $1.8m (58%) of the       •   Other revenue is in line with budget expectations at this
                      $3.1 million annual          stage



                                                                                              Page 58 of 99

Section 59

GENERAL COMMITTEE MEETING AGENDA                                                                      14 FEBRUARY 2022


 Category                 Summary                         Comments
                          budget has         been
                          earned
 Operating                $3.2 million (55%) of           •   Operating grants are in line with budget expectations at
 Grants,                  the    $5.9    million              this stage.
 Subsidies                annual budget has               •   50% ($1.2 million) of the financial assistance grant was
                          been received                       again prepaid in June 2021 and may impact on Council’s
                                                              2021/22 final operating position if the prepayment
                                                              approach is discontinued by the Australian government.
 Unitywater               On track                        •   Unitywater distributions are fixed each year so little
 Distributions                                                budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

   $8.0
                                                    $7.4
                                             $6.6                                      YTD Budget ($m)
   $7.0
                   $5.7                                                                YTD Actual ($m)
   $6.0     $5.3
   $5.0
   $4.0
                                                                                              $3.2 $3.3
                                                                                                           $2.6 $2.6
   $3.0
   $2.0
                                                                $1.2 $1.3
                                                                                $0.6 $0.6
   $1.0
                              $0.4 $0.4
   $0.0
               Charges




                                                                    Income




                                                                                    Other




                                                                                                              Unitywater
                                               Goods &




                                                                                                  Grants
                                               Services
                                               Sales of




                                                                     Rental
                                  Interest
               Fees &




                                                                                                               Share of
Operating Expenditure (YTD Benchmark 58.3%)
Actual operating expenditure is currently 54% ($59.3 million) of full year budget ($110.1 million).
Detailed commentary for each expenditure category is provided below.

 Category                 Summary                               Comments
 Employee                 $20.8 million (55%) of the            •       YTD under expenditure for permanent staff
 Costs                    annual budget of $38.1 million                salaries and wages ($2.5 million) due to position
                          has been expended                             vacancies, partially offset by additional spend
                                                                        on casual staff and external labour hire ($1.0
                                                                        million).
 Materials and            $26.3 million (51%) of the            •       Waste Management $271k below YTD budget
 Services                 $51.1 million annual budget                   (54% or $6.1 million of $11.3 million annual
                          has been expended.                            budget spent)
                                                                •       Environment Services costs $333k below YTD
                                                                        budget (27.3% or $981k of $3.6 million annual
                                                                        budget spent) – COVID-19 impacts on staff
                                                                        have delayed project delivery YTD.
                                                                •       Libraries & Galleries $221k below YTD budget
                                                                        (43% or $777k of $1.8 million annual budget
                                                                        spent) – timing of programs
                                                                •       Development Assessment $90k below YTD
                                                                        budget (44% or $741k of $1.3 million annual
                                                                        budget spent) – timing of development appeal
                                                                        costs.

                                                                                                           Page 59 of 99

Section 60

GENERAL COMMITTEE MEETING AGENDA                                                                                               14 FEBRUARY 2022


 Category                    Summary                               Comments
                                                                   • Holiday Parks $444k above YTD budget (79%
                                                                      or $1.3 million of $1.67 million annual budget
                                                                      spent) – offset by additional revenue.
 Finance Costs               On track                              Nil
 Depreciation                On track                              Nil
 Other Expenses              On track                              Nil

Figure 3: Operating Expenditure Position by Type

$30.0
                                        $27.2
                                                  $26.3
$25.0                                                                                           YTD Budget ($m)
            $21.6 $20.8                                                                         YTD Actual ($m)
$20.0

$15.0
                                                                                                       $11.4 $11.4
$10.0

 $5.0
                                                                  $0.6                   $0.7                                        $0.1           $0.1
 $0.0
                                                                         Finance Costs
                                            Materials




                                                                                                           Depreciation
                 Employees




                                                                                                                                            Other
Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure as at 31 January 2022 is outlined below, which includes the first
instalment payment to Tourism Noosa under the funding agreement.
 Expenditure                            Annual Budget                                    YTD Budget                         YTD       YTD
                                                  $m                                            $m                        Actual   Varianc
                                                                                                                             $m          e

 Payment to Tourism Noosa                                 $2.52                                   $1.26                    $1.26               -

 Economic Development                                     $0.96                                   $0.33                    $0.47    ($0.1)

 Total                                                    $3.48                                   $1.59                    $1.73    ($0.1)

The payment of the second instalment to Tourism Noosa for 2021-22 ($1.26m) is due in February
2022.
YTD Economic Development expenditure is below budget due to lower employee costs ($55k), as
the Branch Manager was acting as Director of Environment & Sustainable Development for the
first part of the financial year. This has also impacted timing for delivery of initiatives under the
Local Economic Plan ($83k).
Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
all tourism and economic development activity. Any general rate revenue shortfall is funded
through other general revenue sources to ensure all planned activities are undertaken in full.




                                                                                                                                     Page 60 of 99

Section 61

GENERAL COMMITTEE MEETING AGENDA                                                  14 FEBRUARY 2022


Capital Revenue
YTD capital revenue of $9.8 million received comprises cash contributions from developers ($1.6
million) and capital grants ($7.7 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.
Figure 4: Capital Revenue by Type

  $9.0
                                                 $7.7               $7.7
  $8.0
                                                                           YTD Budget ($m)
  $7.0
                                                                           YTD Actual ($m)
  $6.0
  $5.0
  $4.0
  $3.0
                 $1.5                    $1.6
  $2.0
                                                                                $0.7                 $0.7
  $1.0
  $0.0
                         Contributions




                                                        Subsidies




                                                                                       Contributed
                                                         Grants /




                                                                                         Assets
                            Cash




Capital Program
Actual capital expenditure (excluding commitments) is $17.0 million (YTD budget $20.0 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.
Figure 5: Capital Program Delivery Performance
 $18.0
                 $15.7
 $16.0
                                         $13.4                              YTD Budget ($m)
 $14.0
                                                                            YTD Actual ($m)
 $12.0
 $10.0
  $8.0
  $6.0
  $4.0
                                                 $1.9               $1.2
  $2.0                                                                          $0.6                 $0.6
  $0.0
                  Capital works                   Other capital                Loan redemption


Cash Management and Investment Performance
Total cash on hand at the end of January was $83.2 million. Included in this balance are funds held
in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant and other capital works grants, January rates payments
received, and unspent monies committed for funding capital projects which are underway and will
continue during the financial year.
The following pie charts present the mix of cash held at January 2022 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds

                                                                                                     Page 61 of 99

Section 62

GENERAL COMMITTEE MEETING AGENDA                                                                    14 FEBRUARY 2022


Figure 6: Closing Cash Held by Agency and Credit Rating




                                CBA                                                   A1 +
                                16%                                              (Commercial Banks)
                                                                                      16%




                                                                                                     A1 +
                                          QTC                                                       (QTC)
                                          84%                                                        84%




The following chart monitors the 12 month trend on total cash and the agencies invested. While
the bulk of cash from the second bi-annual issue of rates and levies is forecast to be received in
February, early payments received during January provided for an increase in cash overall of $7
million. These funds will be reinvested in line with Council’s Investment Policy.

Figure 7: 12 Month Trend of Cash Invested by Agency
 120,000,000



 100,000,000



  80,000,000



  60,000,000



  40,000,000



  20,000,000



          -
              Feb-21   Mar-21   Apr-21   May-21   Jun-21   Jul-21   Aug-21   Sep-21   Oct-21   Nov-21   Dec-21     Jan-22

                Bendigo TD        Westpac TD         NAB TD         Suncorp TD        CBA TD       QTC           CBA Operating


Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.




                                                                                                             Page 62 of 99

Section 63

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                             14 FEBRUARY 2022


Category                                                                                                                                                                          Comments
Operating Surplus Ratio                                                                                                                                                           • Intent: Identifies the extent to
                                      90%   82.6%
                                                                                                                                                                                    which       revenues        cover
                                      80%
                                                                                                                                                                                    operational expenses, to ensure
                                      70%
                                                                                                                                                                                    community      equity    is   not
                                                         60.9%
                                                                                                                                                                                    degraded
                                      60%
                                      50%                          44.5%                                                                                                          • Target: 0 – 10%
                                                                                                            39.0%
                                      40%                                     30.5%
                                                                                                                                                                                  • Result: 39.0%
                                      30%                                                                                                                                         • Comment: The ratio is at the
                                                                                         18.3%
                                      20%
                                                                                                    8.3%
                                                                                                                                                                                    second peak for the year
                                      10%                                                                                                                                           following the issue of rates and
                                       0%                                                                                                                                           levies in January. This ratio will
                                     -10%                                                                                                                                           slowly decline as expenditure on
                                             Jul        Aug        Sep        Oct        Nov        Dec         Jan        Feb        Mar        Apr        May        Jun          operations occurs through to the
                                                                                                                                                                                    end of the financial year at 30
                                                              Actual                                   Budget                                      Target                           June 2022.

Cash Expense Cover                                                                                                                                                                • Intent: Indicates how long
                                     14.0                                                                                                                                           council can continue paying its
                                             12.5                                                               12.8       12.5
                                                        12.2                                                                          11.9                                          day-to-day expenses from cash
 Months (Cash to Cover Operations)




                                                                   11.6                                                                          11.8
                                     12.0                                     10.9                                                                          10.8       11.2         at bank without needing
                                                                                         10.1       10.4
                                     10.0
                                                                                                                                                                                    additional cash flows
                                                                                                                                                                                  • Target: > 3 months
                                      8.0
                                                                                                                                                                                  • Result: 11.2 months
                                      6.0
                                                                                                                                                                                  • Comment: Council is forecast
                                      4.0                                                                                                                                           to remain above target for the
                                                                                                                                                                                    financial year. Business as
                                      2.0                                                                                                                                           usual expenditure through to 30
                                       -            -          -          -          -          -           -          -          -          -          -          -          -     June 2022 will continue to
                                            Feb         Mar        Apr        May        Jun         Jul        Aug        Sep        Oct        Nov        Dec        Jan          diminish     Council’s     cash
                                                                                                                                                                                    holdings, albeit not below the
                                                         Actual                                                                   Minimum (>0 months)
                                                         Target (3 months)                                                        Maximum (6 months)                                target range of 3 – 6 months.

Asset Sustainability Ratio                                                                                                                                                        • Intent: Measures the extent to
                                     140%                                                                                                                          130.1%
                                                                                                                                                                                    which assets are being replaced
                                                                                                                                                                                    as their condition degrades to
                                     120%                                                                                                                                           ensure service potential is
                                     100%
                                                                                                                                                                                    maintained
                                                                                                                                                                        90%       • Target: 90% of depreciation
                                     80%
                                                                                                                                                                                    budget spent on renewals
                                     60%                                                                                                                                            annually
                                                                                                31.6% 37.3%                                                                       • Result: In line with budget
                                     40%                                       26.3%
                                                                          17.2%
                                                                                                                                                                                  • Comment: Construction on
                                     20%
                                                    6.5% 10.1%                                                                                                                      renewal projects slowed over
                                            0.9%                                                                                                                                    the holiday period resulting in a
                                      0%
                                            Jul         Aug        Sep        Oct        Nov     Dec            Jan    Feb        Mar        Apr        May        Jun              slight deviation to budget YTD.
                                                                                                                                                                                    The capital works program
                                               Actual Renewal Spend (%)                                    Target (%)                    Renewals Budget (%)                        remains on track and this ratio
                                                                                                                                                                                    will continue to increase each
                                                                                                                                                                                    month as expenditure on
                                                                                                                                                                                    renewals occurs.




                                                                                                                                                                                                    Page 63 of 99

Section 64

GENERAL COMMITTEE MEETING AGENDA                                                                                                                       14 FEBRUARY 2022


Category                                                                                                                                    Comments
Net Financial Liabilities Ratio                                                                                                             • Intent: Outlines the level that
                                                                                                                                              net Council debt can be serviced
             80%
                                                        60%
                                                                                                                                              by operating revenues. A ratio
             60%                                                                                                                              below zero implies that liabilities
                                                                                                                                              are less than cash (and other
             40%
                                                                                                                                              current assets) and there is
             20%                                                                                                                              adequate borrowing capacity
                                                                                                                                              available if needed.
                                  0%
                                                                                                                                            • Target: less than 60%
 -20%
                                                                                       -13%
                                                                                                                                            • Result: -65%
 -40%                                                                                                                                       • Comment: Council has low debt
                                                                                                                                              levels and strong cash holdings.
 -60%
                                                                                                                        -65%
 -80%
                                                       Target                          Budget                         YTD Actual


Investment Return                                                                                                                           • Intent: Ensure appropriate
                                                                                                                                              return on investment yield for
                                                                                                                                              cash at bank.
                                                                                                                                            • Target: 0.25% above current
                                                                                                                                              Bloomberg commonwealth 10-
                                                                                                                                              year bond rate yield (0.08%)
                                                                                                                                            • Result: 0.34%
                                                                                                                                            • Comment: Regardless of the
                                                                                                                                              current levels of low long-term
                                                                                                                                              bond     and    interest   rates
                                                                                                                                              Council’s investment return still
                                                                                                                                              remains above target.
                                                                                                                                               As investment rates increase
                                                                                                                                               opportunities to maximise
                                                                                                                                               returns on surplus funds will be
                                                                                                                                               explored in line with Council’s
                                                                                                                                               investment policy.

Rates in Arrears                                                                                                                            • Intent: Ensuring that the
                                                                                                                                              amount of unpaid rates remains
                                         12.0%
 Percentage of Annual Rates in Arrears




                                                                                                       10.2%                                  sustainable and does not
                                         10.0%           9.5%                                                                                 negatively impact cash flows
                                                                                                                                            • Target: 5% industry benchmark
                                          8.0%                  7.4%                                           7.3%
                                                                       6.2%                                            6.5%                 • Result: 5.8%
                                                                                                                              6.0%   5.8%
                                          6.0%   5.0%
                                                                              5.7%
                                                                                       5.2%                                                 • Comment:       Rates      arrears
                                                                                                4.6%
                                                                                                                                              continue to decline from the high
                                          4.0%                                                                                                point in the cycle however they
                                                                                                                                              remain slightly above target.
                                          2.0%
                                                                                                                                              Recovery action may be
                                          0.0%
                                                                                                                                              considered where appropriate.
                                                 Feb     Mar    Apr    May    Jun       Jul     Aug     Sep    Oct     Nov     Dec   Jan

                                                                              Actual             Target




Previous Council Consideration
Nil.
Finance
As above.

                                                                                                                                                               Page 64 of 99

Section 65

GENERAL COMMITTEE MEETING AGENDA                                                     14 FEBRUARY 2022


Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability.
Some examples of identified risks within the register that could have potential impact on Council’s
operational performance, capital program delivery, cashflow and cash reserves include:
•        Substantial damage to or failure of Council infrastructure due to natural disaster or other
         emergent issue that may require significant unplanned investment;
•        Closure of Council facilities due to ongoing Covid 19 restrictions;
•        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
•        Economic conditions affecting ratepayers’ ability to pay rates;
•        Market driven increases in construction and operational costs significantly above estimates;
•        Labour and material shortages and delays.
Actions to manage and mitigate financial risk on these factors include monthly ongoing financial
reporting to identify and address issues, conservative budgeting and compliance with the Financial
Sustainability Policy, regular budget reviews, effective liquidity management to ensure sufficient
fiscal flexibility, as well as the Reserves and Restricted Cash policy requiring both a disaster
management reserve and 3 months cash cover reserves to fund emergent matters.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

          Departments/Sections Consulted:

X      Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Support             Director                                X   Director
                                     Community Development                   X   Financial Services
                                     Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

X      Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                              Page 65 of 99

Section 66

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022



ATTACHMENT 1




                                       Page 66 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                  14 FEBRUARY 2022

ATTACHMENT 1

    Profit and Loss Statement
    Revenue
       Recurrent Revenue
       Rates, levies and charges                           74,794          75,401          75,989           588        102%
       Fees and charges                                      8.246          5,326           5,732           406        70%
       Interest received                                      670            304            399                5       60%
       Sale of Goods and major services                     11,004          6,573           7,401           828        67%
       Sale of contract and recoverable works                 23                -              0               0        1%
       Rental & lease income                                 1,885          1,243           1,254             11       67%
       Other income                                          1,244                          574             (63)       46%
       Grants, subsidies, contributions and donations        5,925          3,241           3,257             17       55%
       Unitywater Distributions                              5,650          2.571           2,571              -       46%
                                                           109,530        95,384          97,176           1,792       89%
    Expenses
       Recurrent Expenses
       Employee benefits                                  38,134           21,566         20,786             780       55%
       Materials and services                               51,001         27,202         26,305            807        51%
       Finance costs                                         1.114            61             655            (13)       50%
      Depreciation                                          19,589         11,427          11,428            (2)       58%
      Other expenses                                         233             140              06             46        41%
                                                           110,164        60,977          39,270           1,707       54%
   Operating Result                                          63               OT             906            as
    Summary of Capital Expenditure and Funding
    Capital Funding
      Capital cash contributions and infrastructure charges  1,397          1,508           1,617            108       116%
       Contributed assets                                    1,500           655            601              36        46%
       Capital grants and subsidies                         18,963         7,665           7,665               -       40%
       Cash / revenue                                      22,860          10,828           8,561         (2.266)      37%
       New loan borrowings                                  4,859               7               -              -        o%
      Other capital revenue                                     -               -               -              -        Oo%
  Total Capital Funding                                      STS           08ST            8S               aay
    Capital Expenditure
       Contributed assets                                    1,500           655            601              36        46%
       Capital works - constructed assets                  41,980          17,263          14,766         (2,487)      35%
       Capital works - other capital                        4,792          2,080            1,545          (545)       32%
       Loan redemption                                       1,297           648             648               -       50%
      Other anes caninure                                       -               -           883             883         Oo%

                                                                                                          Page 66 of 99

Section 67

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


 ATTACHMENT 2




                                       Page 67 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                     14 FEBRUARY 2022

   ATTACHMENT 2

          Current Assets
              Cash and cash equivalents                                     65,875                 83,220                  68,895
               Trade and other receivables                                   10,286                39,863                   7467
               Inventories                                                     144                     151                    144
               Contract Assets                                                    -                  487                     487
               Other current assets                                           3,425                  4.257                  4.955
                                                                            79,730                 127,888                 81,048
               Non Current Assets held for sale                                   -                      -                      -
          Total Current Assets                                              79,730                 127,388                 81,948
          Non Current Assets
               Trade and other receivables                                  53,761                 40.468                  49,468
              Other non current Assets                                            -                      -                      -
               Investments                                                  88,040                 92,434                  92,434
               Investment property                                            3,000                  2.900                  2,900
               Right of Use Assets                                              89                    8a                      89
               Intangible assets                                             2,825                   2.831                  3,036
          Total Non Current Assets                                        1,146,853              1,105,404              1,100,506
          Total Assets                                                    1,226,584              1,233,392              1,182,454
          C     ¢ Liabiliti
               Trade and other payables                                       7,34                  14.268                 10,468
               Contract Liabilities                                           4.377                  4.377                  4,377
              Borrowings                                                       246                    629                    956
              Provisions                                                      8,103                  5,087                  4,047
              Other                                                           3,988                  3.138                  2,898
          Total Current Liabilities                                         24,783                 27.525                  23,669

              Borrowings                                                    24,390                 20.258                  20,258
              Provisions                                                     16,555                 16,555                 16,555
          Total Non Current Liabilities                                      41,011                36,879                  36,879
          Total Liabilities                                                 65,794                 64.404                  60,549
          Net Community Assets                                           1,160,791              1,168,987              1,121,905
          Community Equity
               Asset Revaluation Surplus                                    126,128                108,561                108,473
               Retained Surplus / (Defeciency)                                    -                      -                      -
               Shire Capital                                              1,034,661              1,013,432                900,512
               Current Year Net Eamings                                           -                46.995                  13,920
          Total Community Equity                                         1,160,790              1,168,987              41,121,305

                                                                                                              Page 67 of 99

Section 68

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


 ATTACHMENT 3




                                       Page 68 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                 14 FEBRUARY 2022

   ATTACHMENT 3

         Receipts from Customers                                            04.649            62,254             93,975
          Payments to Suppliers and Employees                              (90,066)          (47,666)           (84.528)
                                                                             4,582            14,588              9447
          Investment and Interest Revenue Received                           3,270              1,408             3.401
         Rental Income                                                        1,873             1,254             1,365
         Non Capital Grants and Contributions                                5,887             3,257              6,085
          Income Tax Equivalent Received                                      1,200             932               1,450
          Income from Equity Investments                                      1,850             630               1,600
          Payments:
         Borrowing Costs                                                         -                 -             (2.499)
         Interest Expense                                                     (516)              (83)              (131)
         [Net Cash Inflow/(Outfiow) from Operating Activities ==            18.448           24986              20.719

          Receipts:
         Proceeds of Sale of Property, Plant and Equipment                       -               103               217
          Grants, Subsidies, Contributions and Donations                    20,360             9,282             13,679
          Payments:
          Payments of Property, Plant and Equipment                        (45,953)           (16,192)          (22.721)
         Payments for Intangible Assets                                       (829)             (343)            (1,385)
         Net Movement im Loans and Advances                                      -               125               125
         [Net Cash Inflow/(Outfiow) from Investing Activities =            (26.422)           (7.025)          (10,085),
    Cash Flows from Financing Activities
          Receipts:
         Proceeds from Borrowings                                            4,859                 -              2.500
          Payments:
         Repayment of Borrowings                                              (736)            (626)             (1,263)
         Net Cash Inflow/(Outfiow) from Financing Activities ==                NZS             6G)             2
         [Net Increase/(Decrease) in Cash and Cash Equivalents held =       (4.453)           44.3350          A 87H
         Cash and Cash Equivalents at the beginning of the reporting period 70,028            68,004             57,023
         Cash and Cash Equivalents atthe end ofthe reporting period §=      65.875          82298

                                                                                                         Page 68 of 99

Section 69

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


 ATTACHMENT 4




                                       Page 69 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                 14 FEBRUARY 2022

   ATTACHMENT 4

         Materials and services
         Advertising and Marketing                             227             141             128             12        57%
         Administration Supplies and Consumables                751            411             375            36         50%
         Audit Expenditure                                      174             11              12             (1)       7%
         Communications and IT                                 684            466              511           (46)        75%
         Commission Paid                                      1,218           674             907           (233)        74%
        Consultancy Services                                  1,278           574             629            (55)        40%
        Contract Services                                   24,287           12,727         12,135           503         50%
         Contributions, Donations, Sponsorship and Prizes     3,471           1,922          1,881             41        54%
         Electricity                                          1,728           1,017          1,006             10        58%
        internal Fleet Costs and External Plant Hire          1,668            2950          1,053           (103)       63%
        Grants Paid to Community Organisations                1,939           1,085          1,203           (118)       62%
         Insurance                                             703            673             644             30         82%
         Legal Expenses                                       1,866            e156           801             115        43%
         Operating Leases and Rentals                          w2              218             217              1        72%
         Software and Maintenance                             2,166           1,308          1,258            50         58%
         Subscriptions and Registrations                       369            284             204             (8)        80%
         Waste Levy Payments                                  1,460           851             924            (72)        63%
         Water and Sewerage Charges                           1,080           607             425             182        30%
         All Other Materials and Services                     5,708          2,367           1,902           464         33%
                                                             31,091          27,202        26,305             897        51%

                                                                                                         Page 69 of 99

Section 70

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022


9    OPERATIONAL PLAN PROGRESS REPORT – SECOND QUARTER 2021-22
Author           Acting Chief Executive Officer, Larry Sengstock
                 CEO’s Office

Index            ECM/ Subject/ Corporate Planning

Attachments      1.    Operational Plan Progress
                 2.    Key Performance Indicators


EXECUTIVE SUMMARY
Officers provide an updated status report to Council on a quarterly basis. This report reflects the
activities set out in the Operational Plan for the second quarter of the 2021/22 financial year.
The Operational Plan relates to the five key themes in the Corporate Plan and contains 76 agreed
initiatives that relate to the key focus areas.
In summary, the organisation is achieving strong results. Of the 76 initiatives being reported on,
only 3 are not started and 6 are behind schedule; while the remaining 67 are either completed or
on track to be completed within the agreed timeframes.
Covid restrictions have caused some delays, but these are being negotiated well and the
recruitment of a new CEO has delayed the advent of the corporate plan redevelopment.
RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Services and Organisation
Committee Meeting dated 14 February 2022 regarding the 2021-22 Operational Plan and:
A.   Note the progress report for the 2021-22 Operational Plan to 31 December 2021 provided
     as Attachment 1; and
B.   Note the status of Council’s Key Performance Indicators provided as Attachment 2.


REPORT
The purpose of this report is to provide Council with an overview of progress and status of the
implementation of the annual Operational Plan and provide details of Council’s quarterly Key
Performance Indicators (KPIs).

The following graphic shows the methodology employed by Council in terms of the strategic
planning and reporting structure. The Corporate Plan provides the high level strategic direction for
Noosa Shire Council with the Operational Plan being the first level of implementation.




                                                                                     Page 70 of 99

Section 71

GENERAL COMMITTEE MEETING AGENDA                                                14 FEBRUARY 2022


1.      2021-22 OPERATIONAL PLAN
The Operational Plan contains details of the specific projects that were adopted by Council as part
of its budget process. The reporting format for the FY 2021/22 operational plan contains
operational initiatives based on the key focus areas of the Corporate Plan whereas the “business
as usual” activities are included in Branch Plans.
Details of each Operational Plan Initiative are set out in Attachment 1 with a progress update of
each item using the following status criteria of
•     completed
•     on track
•     behind schedule
•     not started
Additional comments on each item are also provided by the responsible officers for completeness.
It is important to note that this report is for the 2nd quarter 2021/22 and only reflects the progress
as at 31 December 2021.
There are 76 operational initiatives grouped under and answerable to the 5 key themes of the
adopted Corporate Plan of:
•    Noosa Environment
•    Noosa Community
•    Noosa Economy
•    Long Term Planning for Noosa Shire
•    Excellence as a Council
The current overall status of these initiatives is:

       Status                    Quarter 1            Quarter 2        Quarter 3          Quarter 4
                                  (July –             (Oct – Dec       (Jan – Mar           (Mar –
                                 Sept 2020)             2020)             2021)           June 2021)
       Not started                    3                   3
       Behind Schedule                9                   6
       On Track                      63                  62
       Completed                      1                   5
In summary, three of the projects remain ‘not started’. Items 4.4 and 4.5 in the report are associated
with the decision to delay the development of the new Corporate plan to allow input from the new
CEO. The third is item 5.2 and reflects Council’s decision to hold off on any decisions on the
development of Carpenters Lane land holding.
Pleasingly an additional four initiatives were completed in this quarter which is also reflected in the
decrease in “behind schedule” and ‘on track’ status.
Note - some of these initiatives are multi-year projects and have been categorised as “on track”
given the initiative will be completed in a future financial year.
The following table provides a brief summary of a number of high interest initiatives. The full list
can be seen in Attachment 1.
      Initiatives                             Comment
Coastal Hazards Adaption Plan                 Second round of community consultation complete and CHAP
(CHAP)                                        approved by Council in November 2021. CHAP currently with
                                              State for final endorsement. Scoping for implementation
                                              projects and grant applications underway



                                                                                       Page 71 of 99

Section 72

GENERAL COMMITTEE MEETING AGENDA                                              14 FEBRUARY 2022


      Initiatives                        Comment
Increase  Community         Grants       Completed – two grant rounds had and additional Alliance
programme                                recipients.
Implement priority activities from       Council adopted the update directional document –
the Local Economic Plan to build         “Economic Development Strategy 2021-2030”.
the     resilience    of   Noosa’s       The Economic Development Manager returned to the role
traditional sectors and continue to      following 12 months acting in a Director role.
build capacity in growth sectors         Two additional contracted resources engaged to drive
that diversify the economy               Destination Management and a focus on Green economy
                                         industry development.
                                         Successful in receiving $50k from the federal government to
                                         assess and develop options for employment hub activation.
Work with the Noosa River                The Noosa River Stakeholder Advisory Committee (NRSAC)
Stakeholder Advisory Committee           has continued to meet throughout the quarter with key
and Marine Safety Queensland to          outcomes being participation in the speed and safety review of
                                         the Noosa River by Maritime Safety Queensland. The
better manage the Noosa River
                                         committee has commenced exploring River Use aspects of the
                                         Noosa River Plan.
                                         Some actions have been delayed by the vacant position of the
                                         Principal Environment Officer – River Strategy and
                                         Engagement and recruitment is ongoing.
Short    Stay       Local     Law        Short Stay local law to commence on 1st February 2022.
implementation
Continue with the construction of        Playground construction continues with practical completion
the Cooroy/Hinterland All-Abilities      set for March 2022, and landscaping establishment period
Playground                               ending February 2022.


2.    KEY PERFORMANCE INDICATORS
As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. 16 of those KPIs are reported to Council on a quarterly basis. The KPIs are included in
Attachment 2.
A selection of some of the key statistics arising from the KPI assessments are shown below:
Our People
•     The issue of staff turnover has been topical recently. For the information of Council, our
      historical staff turnover has been as per the table below:
        Year                                 Staff turnover rate (percentage)
        2014/15                              11.06%
        2015/16                              13.06%
        2016/17                              8.9%
        2017/18                              8.2%
        2018/19                              10.9%
        2019/20                              9.6%
        2020/21                              6.6%

•     The staff turnover rate in this second quarter of 2021/22 has decreased from 4.7% to
      approximately 3.3%. It is important to note that these percentages only relate to the
      movement in permanent positions and do not include temporary and casual positions.


                                                                                      Page 72 of 99

Section 73

GENERAL COMMITTEE MEETING AGENDA                                                 14 FEBRUARY 2022


Our Customers
•    The number of customer requests has reduced in this quarter however in some areas there
     has been an increase such as the environment portfolio.
•    The average wait time for customers who contact the call centre has reduced in this quarter.
Our Finances
•    Rate arrears continue to decline however they remain slightly above the preferred target.
•     Council’s working capital ratio remains above 2 supporting Council’s strong liquidity position.
Our Systems and Processes
The use of online services continues to increase year on year. The proportion of payments
continues to be high as cash payments are being limited due to the COVID-19 pandemic.

3.    CLOSED SESSION ITEMS
At the request of Councillors, this part of the report identifies whether or not there have been any
matters dealt with in confidential session within Council or Committee meetings which have
subsequently been made public. There were two in this quarter. The community can keep up to
date with this information by checking Council's website – https://www.noosa.qld.gov.au/decision-
making

Previous Council Consideration
Quarterly reports are provided to Council outlining our progress with the Operational Plan.

Finance
The projects within the Operational Plan are reviewed and funded as part of Council’s annual
budget process.

Risks & Opportunities
A failure to achieve the outcomes set out in the Operational Plan would be problematic. In some
cases, projects may take longer than anticipated to achieve the best outcome.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
The details of each of the Operational Plan activities have been provided by relevant Departments.
Departments/Sections Consulted:

 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Support             Director                                    Director
                                   Community Development                       Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
 X   Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 73 of 99

Section 74

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 74 of 99

GENERAL COMMITTEE MEETING AGENDA                                                               14 FEBRUARY 2022

                           Attachment 1
                                                                                              Noosa Council 2021/22 Operational Plan Quarterly Progress Report
                       Theme - Noosa Environment
     se                Corporate Plan Goal - Our environment is protected and enhanced and is valued by the community

     Corporate Plan Key  Operational Initiatives         Outcomes                   Responsible     Cholera                                    Status Q1    Q2
     Focus Areas                                                                    Areas/Officers
     1.1 Adopt an        Implement priority activities   Protection of the Shire’s  Environmental | The Noosa Environment Strategy is currently | Ontrack | On track
     overarching         from the Environment            natural environment and    Services/       guiding priorities for the Noosa environment
     Environment         Strategy                        achievement of strategic   Environmental | 24 a second annual report on implementation
    Strategy                                             environmental targets      Services        actions has been drafted and is included in the
                                                                                    Manager         report for the 8 February Planning and
                                                                                                    Environment Committee meeting of Council.
     1.2 Revitalise the | Work with the Noosa River      Management of key threats | Co-chaired by | The Noosa River Stakeholder Advisory      Ontrack | Behind
     Noosa River Plan _| Stakeholder Advisory            to the Noosa River System | CEO with MSQ/| Committee (NRSAC) has continued to meet                Schedule
                         Committee and Marine Safety | and its Environmental and | CEo;s            throughout the quarter with key outcomes
                         Queensland to better            Social values              Environmental | being participation in the speed and safety
                         manage the Noosa River                                     Services/       review of the Noosa River by Maritime Safety
                                                                                    Environmental Queensland. The committee has commenced
                                                                                    Seninge         exploring River Use aspects of the Noosa
                                                                                    Manager         River Plan.
                                                                                                    Some actions have been delayed by the
                                                                                                    vacant position of the Principal Environment
                                                                                                    Officer — River Strategy and Engagement and
                                                                                                    recruitment is ongoing.
                         Continue to partner with the    Oyster beds in the Noosa   Environmental | TNC continues to experience project delays Behind      Behind
                         Nature Conservancy to           River are rebuilt to improve | Services/   due to inability to obtain approvals from  Schedule | Schedule
                         implement the Oyster Reef       habitat for fish and marine Environmental | Queensland Government authorities.
                         Restoration Project in the      life                       Services        An Executive Level Forum as defined in the
                         Noosa River                                               Manager          Partnership Agreement was conducted with
                                                                                                    officers from Noosa Council and TNC in
                                                                                                    attendance to discuss the project.
                                                                                                    A report will be presented to the March PE
                                                                                                    Committee meeting for Council consideration
                                                                                                    of next steps.
     1.3 Implement       Implement the annual action     Reduce Council's           Environmental | The focus in the Quarter has been the      Ontrack | Ontrack
     Council’s Zero      plan for the Zero Emissions     emissions                  Services/       completion of the carbon reporting,
                         Organisational Strateg                                                     establishment of the Climate Change

                                                                                                       Page 74 of 99

Section 75

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 75 of 99

GENERAL COMMITTEE MEETING AGENDA                                                               14 FEBRUARY 2022

     Corporate Plan Key  Operational Initiatives         Outcomes                    Responsible     Updates                                    Status Q1     Q2
     Focus Areas                                                                     Areas/Officers
     Emissions Strategy                                                              Environmental | Response Community Reference Group and
                                                                                     Services        the Climate Change Response Grants (both
                                                                                    Manager          new initiatives).
                          Develop the Emissions          Achievement of Council's    Environmental | Carbon footprint for 20/21 has been completed] Ontrack | On track
                          Reduction Offset Strategy for | nett zero emissions target Services/       and is being reported to the 8 February PE
                         Council’s operations.           2026                        Environmental | Committee of Council.
                                                                                     Services        Commenced piloting WRI Landuse, Landuse
                                                                                    Manager          Change and Forestry Guidance for
                                                                                                     Greenhouse Gas Accounting.
     1.4 Adopt and        Progress the implementation | Optimisation of landfill,    Waste Services/| 10 year capital works plan completed pending | Ontrack | Ontrack
     implement the       of the Noosaville Eumundi       control leachate and       Manager          final designs for stage 3 cells and RRA
     following plans that | Road Landfill Master Plan    emissions capture           Waste &         configuration. Cell 1.1 and 2.2 expansion this
     form part of our                                                                Environmental | financial year including final capping works
     Environment                                                                     Health          and new storm water management system.
     Sohocw Bian         Continue to implement the       Continuation of Pine and    Co-ordinated by| The Draft Yurol-Ringtail State Forest     Ontrack | Ontrack
     Buchire        ,    Yurol Ringtail Forestry         Hardwood removal and        CEO &           Ecological Restoration Plan and Vegetation
     Management Plan      project                        broad scale revegetation in Environmental   Assessment has been completed and handed
     Coastal          “                                  preparation for transfer of Services/       over to the Operational Team consisting of
     Management Plan,                                    land to National Park       Environmental | QPWS, Landcare and Greenfleet to inform
     Flood Management                                                                Services        nursery propagation and plantings of
     Plan, Koala                                                                    Manager          approximately 1000ha of former plantation
     Conservation Plan,                                                                              as
     Waterways and                                                                                   QUT koala baseline and vegetation monitoring
    Wetlands                                                                                         and dog threat assessment using drone
     Management Plan,                                                                                technology completed for year 1 of 3 and
     Open space Plan,                                                                                report and presentation provided by QUT.
     Waste Reduction                                                                                 Community engagement regarding trail
     and Recycling                                                                                   closures, fire management and general project
     Plan.                                                                                           information is ongoing, in collaboration with
                                                                                                     QPWS, HQ@P and DAF.
                                                                                                     Vegetation Assessment Officer continued
                                                                                                     shire vegetation assessment project to update
                                                                                                     Regional Ecosystem Herbarium Mapping and
                                                                                                     Noosa Plan Biodiversity Overlay Mapping to
                                                                                                     support Development Assessment Branch.
                          Develop a new Noosa Waste      Achieve waste minimisation | Waste Services/) New waste manager appointed late August. Ontrack | Ontrack
                         Strategy                        and diversion targets and  Manager          Planning and scoping of Strategy including
                                                         support net zero emissions | Waste &        communication plan commenced. Target for
                                                         target                      Environmental | draft sign off end of FY.
                                                                                     Health

                                                                                                        Page 75 of 99

Section 76

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 76 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                 14 FEBRUARY 2022

     Corporate Plan Key   Operational Initiatives         Outcomes                   Responsible      Updates                                     Status Q1     Q2
     Focus Areas                                                                      Areas/Officers
                          Improved Flying Fox             Properly maintained flying | Environmental | Council's subsidised service program is active | Ontrack | On track
                          Management process              fox infrastructure          Services/       at sites at Kin Kin, Pinaroo Park and Wallace
                                                                                      Environmental | Park, but Flying-fox numbers are reduced.
                                                                                      Services        External grant funding of $24,000 will provide
                                                                                     Manager          for expert advice on management options at
                                                                                                      Kin Kin and Wallace/Pinaroo Park into the
                                                                                                      future. RFQ will be tendered to contractors in
                                                                                                      January 2022.
                          Implement the Noosa             Clear prioritisation of     Environmental | Bushland Strategic Management Plan and      Ontrack | Ontrack
                          Bushland Reserve Strategic      resources towards          Services/        Strategic Fire Management Plan endorsed in
                          Management Plan and Fire        bushland management and | Environmental | June 2021 and Fire Management Officer on
                          Management Plan                 active involvement of the  Services         board in September 2021.
                                                          community in the            Manager
                                                          restoration of degraded                     Consultants have completed draft
                                                          bushland areas                              management plan for Noosa Banks and
                                                                                                      engagement with community will recommence.
                                                                                                      The Coastal Foreshore Management Plan has
                                                                                                      commenced.

                                                                                                      Extra grant funding has kept on extra staff in
                                                                                                      Natural Areas, undertaking specific projects
                                                                                                      and local sites, including the Eastern Beaches.
                                                                                                      The Community Bushcare program is currently
                                                                                                      at capacity with demand for new groups still
                                                                                                      coming in, this will be reviewed at budget time.

                                                                                                         Page 76 of 99

Section 77

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 77 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                 14 FEBRUARY 2022

     Corporate Plan Key   Operational Initiatives         Outcomes                    Responsible     Updates                                     Status Q1     Q2
     Focus Areas                                                                      Areas/Officers
     1.5 Reinforce our | Streetscape upgrade project    | Improved management of _| Infrastructure _ | Participate in council workshops and working | Ontrack | On track
     Noosa Design         implementation                  Noosa’s public areas and —_| Planning,      groups and are consistent with message to
    Principles                                            built environment to align  Design &        apply design principals.
                                                          with the Noosa Design       Delivery, Civil           .        .   .              .
                                                          Principles and Noosa Style | Operations          ere of design vision statements into
                                                                                      (Civil Works &  all PMP’s ongoing.
                                                                                      Mtce), Civil    Planning and detailed design of the Noosa
                                                                                      Operations      Drive Pathway underway.
                                                                                      (Parks &
                                                                                      Gardens), Asset} Planning for Noosa Junction Streetscape
                                                                                      Management/ | upgrade subject to formal budget agreement.
                                                                                      Inirast uetire  Renewal of design palettes underway.
                                                                                      Planning
                                                                                      Design &
                                                                                      Delivery
                                                                                      Manager
     1.6 Manage           Continue to implement best      Development outcomes        Development     Appointed new Senior Environment Officer    On track    On track
     development within | practice Development            aligned with the            Assessment/     with this officer participating in workshops with
     the Noosa Shire in | Assessment services that        environmental controls      Development | the Environment Services team and
     accordance with      deliver the strategic           included in the Noosa Plan | Assessment     Environment Levy working group.
     Noosa's              environmental outcomes          2020                       Manager          Training workshop held for planners and
     environmental        committed to in the Noosa                                                   senior environment officer on state koala
     outcomes             Plan 2020                                                                   habitat requirements.

     1.7 Plan our         Community ZEN emissions         The Noosa Community is      Environmental | Investigations are ongoing into community   Ontrack | Ontrack
     response to climate | project implementation         assisted to become zero     Services/       battery option and funding opportunities with
     change                                               net emissions by 2026       Project Officer | ZEN Inc.
                                                                                      — Carbon        Climate Change Response Plan Community
                                                                                      Reduction       Reference Group has been established - 2
                                                                                                      meetings have been held to date.
                                                                                                      Noosa & Sunshine Coast Councils received a
                                                                                                      grant to implement the first 2 phases of the
                                                                                                      LGAQ Climate Risk Framework for Local
                                                                                                      Governments — internal and external surveys
                                                                                                      completed, internal climate risk workshops
                                                                                                      completed, external workshops scheduled.
                                                                                                      Noosa Youth Advocacy Group presented to
                                                                                                      Council on the outcomes of the Youth Climate
                                                                                                      Summit.

                                                                                                         Page 77 of 99

Section 78

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 78 of 99

GENERAL COMMITTEE MEETING AGENDA                                                             14 FEBRUARY 2022

     Corporate Plan Key  Operational Initiatives        Outcomes                  Responsible     Updates                                    Status Q1    Q2
     Focus Areas                                                                   Areas/Officers
                         Continue to progress the       The Council has a plan to  Strategic Land | Second round of community consultation  Behind      On track
                         finalisation and               respond to the challenges  Use Planning/ | complete and CHAP approved by Council in | Schedule
                         implementation of the          of climate change on our   Director       November 2021. CHAP currently with State for
                         Coastal Hazard Adaption        coastal areas              Environment &| final endorsement. Scoping for implementation
                         Plan (CHAP)                                               Sustainable    projects and grant applications underway.
                                                                                   Development
                         Finalise the development of    Climate risks and          Strategic Land | The CCRP was endorsed by Council August | Ontrack | Ontrack
                         the Climate Change             emissions reduction are    Use Planning/ | 2021. ACCRP Community Reference Group
                         Response Plan & commence       considered and responded | Director       has been established to provide advice on
                         implementation                 to in a holistic way       Environment &| implementation and meetings have
                                                                                   Sustainable    commenced.
                                                                                   Development
                         Continue the implementation    Improved management of     Environmental | A dedicated Fire Management Officer was   On track   On track
                         of Council’s Fire              our bushland reserves with | Services/    appointed in September. He is currently
                         Management Plans and           regard to fire and the     Environmental | reviewing training, equipment and vehicles, as
                         bushland reserves              implementation of a more   Services       well as maintaining fire trails as we head into
                                                        proactive, specialised    Manager         the summer season.
                                                        burning regime
                         Noosa Heads Main Beach         Improved management of | Asset            SARA has agreed to an application timeframe | Behind  On track
                         SEMP                           shoreline erosion in Noosa | Management/ | extension, previously due October 2021, now | Schedule
                                                        Main Beach and Noosa       Asset Planning| February 2022.
                                                        Ret                        Coordinator    BMT Global preparing sediment sampling and
                                                                                                  analysis plan (SAP).
                                                                                                  Forecast SAP finalisation and approval during
                                                                                                  January and February 2022.
                         Coastal Reserve                Develop a detailed         Asset          A dedicated officer for this project has started | Ontrack | Ontrack
                         Management Plan                management Plan for the    Management/ | in early October and had finalised the project
                                                        eastern beaches to         Asset Planning| Plan and has begun direct engagement with
                                                        manage encroachments,      Coordinator;   community stakeholders.
                                                        accesses and works inthe | Environment
                                                        anes                       Officer —      Background survey has been completed and
                                                                                   Coastal        a workshop with Councillors to refine plan
                                                                                   Management | direction is scheduled for early February.

                                                                                                     Page 78 of 99

Section 79

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 79 of 99

GENERAL COMMITTEE MEETING AGENDA                                                             14 FEBRUARY 2022

           Q                                                                                Noosa Council 2021/22 Operational Plan Quarterly Progress Report
      &        a) Theme - The Noosa Community
          &           Corporate Plan Goal - Our community is connected, safe and happy and able to meet their potential

     Corporate Plan Key  Operational Initiatives         Outcomes                   Responsible     Update                                      Status Q1    es
     Focus Areas                                                                    Areas/Officers
     2.1 Undertake       Implement priority activities   An effective framework to | Community      Priority for 21/22:                         Ontrack | On track
     implementation of   from the Social Strategy        continue to improve        Development/ | Lead a social services mapping exercise and
     the Noosa Social                                    community wellbeing and    Community      development of a social services position paper.
    Strategy                                             cohesiveness               Development | Development and implementation of a 12 month
                                                                                    Manager        calendar of volunteer workshops that are
                                                                                                    responsive to community needs.
                         Support the community with      Improved community                        Council has initiated proceedings inthe Planning | On track | On track
                         the intensity of usage of the   outcomes through Council                  and Environment Court seeking orders to limit
                         Kin Kin Quarry                  advocacy                                  the impact of the quarry on local residents. An
                                                                                                    interim hearing was held on 12 November with
                                                                                                   the outcome being non favourable to the request
                                                                                                   for reduced truck movements during school bus
                                                                                                   times. The Kin Kin Quarry Roundtable continues
                                                                                                   to meet on a regular basis.  The next court
                                                                                                    proceedings will occur on March 2-4,2022
                                                                                                   where affidavits will be considered.
                         Maintain our relationship with | A positive and effective  Director        Relationship building focused around new    Ontrack | On track
                         the local indigenous            partnership built on trust and | Community Council point of contact. Key inclusion of Kabi
                         community                       respect                    Services        Kabi community in Floating Land 2021.

                                                                                                      Page 79 of 99

Section 80

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 80 of 99

GENERAL COMMITTEE MEETING AGENDA                                                               14 FEBRUARY 2022

     Corporate Plan Key   Operational Initiatives         Outcomes                   Responsible     Update                                       Status Q1    ee,
     Focus Areas                                                                     Areas/Officers
     2.2 Adopt and        Implement priority activities   Delivery of better social  Community      21/22 Cultural Action Plan — Key priority     Ontrack | On track
     implement the       from the Cultural Plan,          outcomes including a       Development/ | activities underway including ITQ for Stage 2
     following plans that | Community Health and          cohesive resilient         Community      Gallery Pre-Feasibility study; Shirewide
     form part of our    Wellbeing Plan and the Sport | community, an active and —_| Development      eet aan a                   re       —
     Noosa Social         and Active Recreation Plan      healthy community, an      Manager          MG    an     men ae fe ae      Se
     Strategy - Cultural                                  accessible diverse and                      Oe Sete Min Sistem SIs) a tree Felt
                   :                                                       '                         Community House.
     Plan, Community                                      affordable community
     Health and
     Wellbeing Plan and                                                                             Sport and Active Recreation Plan
     the Sport and                                                                                   Key recommendations currently being
     Active Recreation                                                                               implemented including Feasibility for non-
     Plan                                                                                            powered water sports — tender closed and
                                                                                                     consultant appointed; Noosa Cycling and
                                                                                                     Walking strategy and implementation plan
                                                                                                     completed and endorsed; Noosa Trails network
                                                                                                     master plan implementation underway; and
                                                                                                     Sport infrastructure improvements including LED
                                                                                                     lighting for sports fields.
                          Deliver Floating Land 2021      Increased access to and   Galleries/       Floating Land: at the edge of ideas delivered 9'" | On track | Completed
                          event                           participation in arts and Gallery          to 24th October. In excess of 30 installations and
                                                          culture                   Director         performances delivered across Boreen Point
                                                                                                     and Park Road Boardwalk.
                         Annual Christmas convoy          Increased community        Community       Completed 6 — 9th December 2021.             Ontrack | Completed
                                                          connectedness              Development/
                                                                                     Community
                                                                                     Development
                                                                                     Manager
     2.3 Implement the    New Mobile Library and          Accessible and             Libraries/      Vehicle tender awarded in July 2021; Kiosk   Ontrack | On track
     Libraries Strategic  Community Outreach Service | contemporary outreach         Libraries &     ordered for Peregian Community House — unit
     Plan                 is planned and implemented      library services           Galleries       not being shipped until January due to supplier
                                                                                     Manager         issues; ITQ currently being prepared for kiosk at
                                                                                                     Pomona Community House; New suite of library
                                                                                                     outreach programs developed and being
                                                                                                     delivered. Three initial focus locations —
                                                                                                     Pomona, Peregian and Kin Kin.
     2.4 Continue to      Continue the construction of    Completion of site         Director        Construction of new Peregian Beach Community; On track | On track
     support our          Stage 3 of the Rufous Street    construction and the new   Community       House and Green Space nearing completion.
     community to utilise | project incl. the construction neighbourhood centre which | Services     Transition to new building to occur early in 2022.
     Council controlled   of the new Peregian Beach       will strengthen community                  Concept design for refit of old community house
     land and buildings   Community House.                connection                                 drafted.

                                                                                                       Page 80 of 99

The text continues on section 81.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.