2022-02-14 General Committee Meeting Agenda

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 81 of 99

GENERAL COMMITTEE MEETING AGENDA                                                                14 FEBRUARY 2022

     Corporate Plan Key   Operational Initiatives         Outcomes                    Responsible     Update                                        Status Q1    ee,
     Focus Areas                                                                      Areas/Officers
     through formal       Increase Community Grants       Improved community          Community       Completed — two grant rounds had and          Ontrack | Completed
     tenure               programme                       participation and social    Development/ | additional Alliance recipients.
     arrangements                                         benefits                    Community
                                                                                      Development
                                                                                      Manager
                          Sunshine Beach skate ramp       Improved design to better   Infrastructure  Design and specifications reviewed.           Ontrack | On track
                          renewal                         integrate skate facilities with | Planning Design) Tender out November 2021. Tender award at
                                                          surrounding infrastructure  & Delivery,     December 2021 round of meetings.
                                                          and environment             Infrastructure | Completion due prior to end of financial year.
                                                                                      Planning
                                                                                      Design &
                                                                                      Delivery
                                                                                      Manager
                          Kin Kin Recreational Centre     Increased community         Property/       Stage 1 works including stripping out of the  Ontrack | On track
                          Renewal                         connection and responsible | Property       internal timber cladding, vinyl flooring, kitchen
                                                          management of assets        Manager         and removal/cleaning of the microbat guano are
                                                                                                      currently underway and are forecasted to
                                                                                                      conclude on the 17-18 January 2022.
                          Progress the implementation     Strategic direction for the Community       Commenced implementation of                   Ontrack | On track
                          of the Master Plans for the     development and             Development/ | recommendations.
                          Noosa District Sports Complex | implementation of sport and | Community     Concept design for redevelopment of Cooroy
                          and Cooroy Sports Complex       recreation facilities       Development | Sports Complex.
                                                                                      Manager         Resurfacing Noosa District Network courts.
                                                                                                      Undertaking feasibility study of Regen Wellbeing
                                                                                                      Hub.
     2.5 Plan and build | Continue with the construction | Completion by the end of   Infrastructure | Playground construction continues with practical | Behind | Behind
     an iconic all        of the Cooroy/Hinterland All-| 2021 to increase interaction | Planning Design| completion set for March 2022, and landscaping | Schedule | Schedule
     abilities playground | Abilities Playground          and inclusiveness           & Delivery/     establishment period ending February 2022.
     at Cooroy                                                                        Infrastructure
                                                                                      Planning
                                                                                      Design &
                                                                                      Delivery
                                                                                      Manager
     2.6 Explore options | Pre-Feasibility Study Noosa    Options and scenarios fora | Director       Invitation to Quote drafted and released, closing | Not On track
     for and investigate | Regional Gallery (Stage 2)     new regional art gallery are | Community    on 4 February 2020.                           started
     the feasibility of                                   analysed to assist Council in | Services
     relocating the                                       deciding whether or not to
     Noosa Regional                                       proceed to a further stage in
     Gallery                                              this project

                                                                                                        Page 81 of 99
Log in to download the original file

2022-02-14 General Committee Meeting Agenda(PDF, 14MB).pdf · 14.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.