Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-02-14 General Committee Meeting Agenda

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022


ATTACHMENT 2




                                       Page 19 of 99

GENERAL COMMITTEE MEETING AGENDA                                            14 FEBRUARY 2022

ATTACHMENT 2
         2                                   PO BOX 761 BUDERIM 4554 | PH: 0408 725 826

    2™ February 2022

    Glen Conforti
    Senior Strategic Planner
    Noosa Council
     [email protected]

    Dear Glen
    RE: HYDROLOGY CONSTRAINTS REVIEW FOR 30 TOULAMBI STREET NOOSA
    Please find below a review of the hydrology constraints for land located at 30 Toulambi St Noosa.
     Scope
    This review has been undertaken to identify constraints relating to hydrology so that Council can
    be informed of issues which may impact the development potential for land located at 30
     Toulambi St, Noosa. It is understood that Council is exploring social/affordable housing
    opportunities across various Council land holdings, of which this is one.
    This review was informed by the following tasks:
        1. Desktop review based on Council online mapping layers
        2. Site inspection to ground-truth online mapping and identify other potential issues

    Drainage Patterns
    The subject site is located adjacent to a sag point in the road network. The sag is located
    immediately in front of the adjacent property 28 Toulambi St and is identified by the presence of a
    side-entry stormwater pit in front of the property. The catchment contributing to this sag point is
    shown in Figure 1 and the sag is shown in Figure 2.
     Although the underground piped stormwater network continues from this sag point into Wyandra
    St, it is clear from the site inspection that excess surface flows/ponding from the sag will
    preferentially flow into 28 Toulambi St rather than continuing into Wyandra street, due to the
    relative levels at this location.
    The frequency with which surface flows will enter 28 Toulambi Street from the road drainage
    network is currently unknown and in practice will depend on both the magnitude of the specific
    rainfall events experienced as well as the degree of blockage of the stormwater inlets at the sag
    and at other locations in the upstream drainage network.
    It is expected that overland flows into 28 Toulambi St would occur relatively infrequently, however
    would almost certainly occur for events more frequent than the 1%AEP which is the current

     a

                                                                                   Page 19 of 99
Log in to download the original file

2022-02-14 General Committee Meeting Agenda(PDF, 14MB).pdf · 14.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.