Page 80 of 99
GENERAL COMMITTEE MEETING AGENDA 14 FEBRUARY 2022
Corporate Plan Key Operational Initiatives Outcomes Responsible Update Status Q1 ee,
Focus Areas Areas/Officers
2.2 Adopt and Implement priority activities Delivery of better social Community 21/22 Cultural Action Plan — Key priority Ontrack | On track
implement the from the Cultural Plan, outcomes including a Development/ | activities underway including ITQ for Stage 2
following plans that | Community Health and cohesive resilient Community Gallery Pre-Feasibility study; Shirewide
form part of our Wellbeing Plan and the Sport | community, an active and —_| Development eet aan a re —
Noosa Social and Active Recreation Plan healthy community, an Manager MG an men ae fe ae Se
Strategy - Cultural accessible diverse and Oe Sete Min Sistem SIs) a tree Felt
: ' Community House.
Plan, Community affordable community
Health and
Wellbeing Plan and Sport and Active Recreation Plan
the Sport and Key recommendations currently being
Active Recreation implemented including Feasibility for non-
Plan powered water sports — tender closed and
consultant appointed; Noosa Cycling and
Walking strategy and implementation plan
completed and endorsed; Noosa Trails network
master plan implementation underway; and
Sport infrastructure improvements including LED
lighting for sports fields.
Deliver Floating Land 2021 Increased access to and Galleries/ Floating Land: at the edge of ideas delivered 9'" | On track | Completed
event participation in arts and Gallery to 24th October. In excess of 30 installations and
culture Director performances delivered across Boreen Point
and Park Road Boardwalk.
Annual Christmas convoy Increased community Community Completed 6 — 9th December 2021. Ontrack | Completed
connectedness Development/
Community
Development
Manager
2.3 Implement the New Mobile Library and Accessible and Libraries/ Vehicle tender awarded in July 2021; Kiosk Ontrack | On track
Libraries Strategic Community Outreach Service | contemporary outreach Libraries & ordered for Peregian Community House — unit
Plan is planned and implemented library services Galleries not being shipped until January due to supplier
Manager issues; ITQ currently being prepared for kiosk at
Pomona Community House; New suite of library
outreach programs developed and being
delivered. Three initial focus locations —
Pomona, Peregian and Kin Kin.
2.4 Continue to Continue the construction of Completion of site Director Construction of new Peregian Beach Community; On track | On track
support our Stage 3 of the Rufous Street construction and the new Community House and Green Space nearing completion.
community to utilise | project incl. the construction neighbourhood centre which | Services Transition to new building to occur early in 2022.
Council controlled of the new Peregian Beach will strengthen community Concept design for refit of old community house
land and buildings Community House. connection drafted.
Page 80 of 99See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.