Skip to the record
Search everything, all in one place.

Original source · versioned page text

2022-02-14 General Committee Meeting Agenda

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   14 FEBRUARY 2022




                                       Page 80 of 99

GENERAL COMMITTEE MEETING AGENDA                                                               14 FEBRUARY 2022

     Corporate Plan Key   Operational Initiatives         Outcomes                   Responsible     Update                                       Status Q1    ee,
     Focus Areas                                                                     Areas/Officers
     2.2 Adopt and        Implement priority activities   Delivery of better social  Community      21/22 Cultural Action Plan — Key priority     Ontrack | On track
     implement the       from the Cultural Plan,          outcomes including a       Development/ | activities underway including ITQ for Stage 2
     following plans that | Community Health and          cohesive resilient         Community      Gallery Pre-Feasibility study; Shirewide
     form part of our    Wellbeing Plan and the Sport | community, an active and —_| Development      eet aan a                   re       —
     Noosa Social         and Active Recreation Plan      healthy community, an      Manager          MG    an     men ae fe ae      Se
     Strategy - Cultural                                  accessible diverse and                      Oe Sete Min Sistem SIs) a tree Felt
                   :                                                       '                         Community House.
     Plan, Community                                      affordable community
     Health and
     Wellbeing Plan and                                                                             Sport and Active Recreation Plan
     the Sport and                                                                                   Key recommendations currently being
     Active Recreation                                                                               implemented including Feasibility for non-
     Plan                                                                                            powered water sports — tender closed and
                                                                                                     consultant appointed; Noosa Cycling and
                                                                                                     Walking strategy and implementation plan
                                                                                                     completed and endorsed; Noosa Trails network
                                                                                                     master plan implementation underway; and
                                                                                                     Sport infrastructure improvements including LED
                                                                                                     lighting for sports fields.
                          Deliver Floating Land 2021      Increased access to and   Galleries/       Floating Land: at the edge of ideas delivered 9'" | On track | Completed
                          event                           participation in arts and Gallery          to 24th October. In excess of 30 installations and
                                                          culture                   Director         performances delivered across Boreen Point
                                                                                                     and Park Road Boardwalk.
                         Annual Christmas convoy          Increased community        Community       Completed 6 — 9th December 2021.             Ontrack | Completed
                                                          connectedness              Development/
                                                                                     Community
                                                                                     Development
                                                                                     Manager
     2.3 Implement the    New Mobile Library and          Accessible and             Libraries/      Vehicle tender awarded in July 2021; Kiosk   Ontrack | On track
     Libraries Strategic  Community Outreach Service | contemporary outreach         Libraries &     ordered for Peregian Community House — unit
     Plan                 is planned and implemented      library services           Galleries       not being shipped until January due to supplier
                                                                                     Manager         issues; ITQ currently being prepared for kiosk at
                                                                                                     Pomona Community House; New suite of library
                                                                                                     outreach programs developed and being
                                                                                                     delivered. Three initial focus locations —
                                                                                                     Pomona, Peregian and Kin Kin.
     2.4 Continue to      Continue the construction of    Completion of site         Director        Construction of new Peregian Beach Community; On track | On track
     support our          Stage 3 of the Rufous Street    construction and the new   Community       House and Green Space nearing completion.
     community to utilise | project incl. the construction neighbourhood centre which | Services     Transition to new building to occur early in 2022.
     Council controlled   of the new Peregian Beach       will strengthen community                  Concept design for refit of old community house
     land and buildings   Community House.                connection                                 drafted.

                                                                                                       Page 80 of 99
Log in to download the original file

2022-02-14 General Committee Meeting Agenda(PDF, 14MB).pdf · 14.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.