Council archive · source document
Appendix E - sdap-v3.6-state-code-1-response-template · RAL26/0026
Performance outcomes Acceptable outcomes Response
OR
AO37.2 Development achieves the maximum free
field acoustic levels in reference table 2 (item
2.1) by alternative noise attenuation measures
where it is not practical to provide a noise barrier
or earth mound.
OR
AO37.3 Development provides a solid gap-free
fence or other solid gap-free structure along the
full extent of the boundary closest to the state-
controlled road.
Involving the creation of 6 or more new residential lots adjacent to a state-controlled road or type 1 multi-modal corridor
PO38 Reconfiguring a lot minimises free field AO38.1 Development provides noise barrier or Not applicable.
noise intrusion from a state-controlled road. earth mound which is designed, sited and
constructed:
1. to achieve the maximum free field acoustic
levels in reference table 2 (item 2.1);
2. in accordance with:
a. Chapter 7 integrated noise barrier design
of the Transport Noise Management
Code of Practice: Volume 1 (Road Traffic
Noise), Department of Transport and
Main Roads, 2013;
b. Technical Specification-MRTS15 Noise
Fences, Transport and Main Roads,
2019;
c. Technical Specification-MRTS04 General
Earthworks, Transport and Main Roads,
2020.
State Development Assessment Provisions v3.6
State code 1: Development in a state-controlled road environment Page 9 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - sdap-v3.6-state-code-1-response-template.pdfRelated documentApplication case desk ↗
About this file
- File size
- 349 KB (small file)
- File type
No other editions are linked here.