Original source · versioned page text
2016-09-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 11 of 19
Weighted Attribute Evaluation Spreadsheet
.* — nm * — q . : a Pr s
Portion B - Mill & Fill - Road Resurfacing
PRICE
[8 based on Mill &
Fill OG44 (320)(0-
45mm) x 106]
No, |NAME OF TENDERER (excl of GST) 0 7) 2 0 46 x x n 51 %
1 Unacceptala Vary Poe Poor Sone ‘Vary Good Euaptors
2
3 ‘The ratings
*@ (pero) = Unacceptatée ~ a tal for fat criteria. and extreme risk
+ 20 (twenty) = Very Poor — eo contest of Be submission for thal efteria 6 of a low slaedard and tigh Got
#40 (forty) = Poor — te contert of @e sebrimsin for fat créers & urenipressive and poses a mocersie oat
+0 [sety) © Good « fhe coment of fre subrnission for frat crmerta is mertable and wil need fo be mortored # awarded
NON-CONFORMING TENDERS +20 (eighty) = Very Good = the content of the setynission tor Mat orteria sof a high standard and advantapeoes
EE ES ier
Once all he data ib entered he reseltant scones based 08 The price and son pre clerments are autoeratoaly calculaed for you
Number of Tenders Evaluated = [3 ]
i 2 3
cwnuton Cr were | as| Sy [S| ay | 208 | su, | een ecoproac namin
Score (out Score (out Score (out Downer have a minumim daily qty specified and the prices are more
8 TT 7 TTF | anars- portions to Downer and Atroad with no guarantee of
| oa | | a | 75 | projects. This will enable Downer to do any mil and fill associated
sf = [se | 58 | Sinimomnonnce nora
with the overlay program and Afroads can do mill and fil associated
7
a
Tota! Technical Score Pp eeFS PST
Normalised Techewcal Score (Tn) rr es ee | se
PART Pre men ee ee
Jo Jiroad Surtac Stan Macad.
Tae were as AU ry aw
aie pF
Average Fees (Pav) $ cee
Normatoed Po fe Te
Normalised Price Score (Pn) 100 83
Weighted Price Soore (P
Total Score of price and non price
Boe Pree ts
OTHER DETAILS
Assesment panel member 1
Assesment panel member 2 The Contract Administrator confirms the above weightings
Assesment panel member 3 Contract Administrator's signature:
Assesment panel member 4
Assesment panel member 4
Page 11 of 19See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.