                                                                  RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                         22366 C R10 R003 (04.07.22)

                                                                                                           July 2022

         responsibility of the owners of the development. The maintenance should be carried out in
         accordance with the Council and Noosa RACV Resort recommendations.

6.4.1    First Flush Device

            First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to the vegetated
            area.

         The initial runoff from the site’s roof area will be directed to the non-disturbed vegetated areas via a
         first flush device/s. This will ensure that accumulated loose material collected in the initial roof runoff
         during a rainfall event is collected and diverted to landscape/garden areas before flows enter the
         rainwater and tank. A first flush device has a set limit on its capacity to convey flows. Once the initial
         runoff from a rainfall event meets this capacity of the first flush device, the remainder of flows for the
         event are diverted to the Lawful Point of Discharge.

6.4.2    Bioretention Basin

            A minimum 30m2 surface area bioretention basin.

         Bioretention basins remove contaminants and sedimentation from stormwater runoff via infiltration
         through layers of soil media. The basin is made of a 400mm filter media layer and a 100mm transition
         layer located above in-situ soil. The basin is to be vegetated, as per the landscape architect’s
         recommendations. These plants provide additional treatment and will prevent clogging of the basin.
         Runoff within the bioretention area gradually infiltrates the soil layers, and freely discharge subsoil to
         an outfall to Weyba Creek. This will be confirmed in the detailed design stage.

6.5      Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
         To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
         is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
         Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
         Supply Systems. This equates to a total rainwater tank volume of 40 kL. Each rainwater tank is to be
         plumbed to be available for outdoor cleaning, washing machines and toilet flushing in accordance
         with Council’s WSUD Planning Scheme Policies.

6.5.1    Internal Demand

         To calculate expected internal demand, the following assumptions were made:

            Toilet requires 25 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
            Guidelines 2010;

            Laundry requires 21 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
            Guidelines 2010;

            Peak occupancy of two (2) people per dwelling for the proposed 16x 2-bedroom units for the
            holiday accommodation in accordance with Table 4.3 of the MUSIC Modelling Guidelines 2010.

         Based on these assumptions the required volume for the internal demand component of the
         rainwater tank is calculated as;

             25 L/day (per person) + 21 L/day (per person) x 2 people per dwelling (peak) = 92 L/day

             Daily demand (representing indoor use) = 92 L/d / 16 units = 1,472 L / day = 1.472 kL / day




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                                Page 14

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.