Council archive · source document
Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (34.8 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
6.6 MUSIC Model
The sites stormwater run-off for the development was modelled using MUSIC (version 6.3.0) and the
water quality objectives for South East Queensland specified in the SPP 2017 of 80% TSS reduction,
60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.
Figure 4 - Treatment train
The results of the above MUSIC model are presented in Figure 5.
Figure 5 - Results for the treatment train
The above results meet the percent reduction water quality objectives identified by Noosa Shire
Council standards and the SPP 2017.
Details of the MUSIC model are attached within Appendix G for further information.
Refer to Appendix C for the Preliminary Layout Plans prepared by this office.
6.7 On-site Treatment Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
treatment infrastructure lies within the development site and it shall be maintained and serviced by
the owners of the development at no cost to Council.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.