Council archive · source document
Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (34.8 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
7 CONCLUSION
In preparing this report, we have achieved all requirements for Site Based Stormwater Management
Plans as described in the State Planning Policy (2017), Noosa Shire Council Planning Scheme
Policies, Queensland Urban Drainage Manual (QUDM) 2016, Plumbing and Drainage Code
AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.