Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                              RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                     22366 C R10 R003 (04.07.22)

                                                                                                       July 2022


6.8      Water Quality Monitoring
         No water quality monitoring is proposed for this development at this stage due to the nature of the
         development and the expected pollutant levels.

6.9      Maintenance
         Maintenance of the SQIDs will be the responsibility of the owners of the development. The
         maintenance should be carried out in accordance with the manufacturer’s recommendations.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                            Page 16

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.