Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                            COMMENTS
                                                AO4.2                                                          N/A. Rainwater captured in
                                                Where infrastructure is located on private land an easement    Bioretention Basin will gradually
                                                is dedicated over the infrastructure in accordance with PSP6   infiltrate to soil layers and freely
                                                Engineering Design Standards - Roads, drainage and             discharges subsoil to an outfall to
                                                earthworks.                                                    Weyba Creek. Refer to Stormwater
                                                                                                               Management Plan prepared by this
                                                                                                               office.
                                                AO4.3                                                          N/A. Rainwater captured in
                                                Any alterations or repairs to infrastructure as a result of    Bioretention Basin will gradually
                                                the development are made at no cost to Council.                infiltrate to soil layers and freely
                                                                                                               discharges subsoil to an outfall to
                                                                                                               Weyba Creek. Refer to Stormwater
                                                                                                               Management Plan prepared by this
                                                                                                               office.
                                                AO4.4                                                          Development will comply.
                                                Development avoids stormwater inflow and infiltration to
                                                the sewer infrastructure network.
                                                AO4.5                                                          N/A. Rainwater captured in
                                                Stormwater infrastructure is designed to minimize              Bioretention Basin will gradually
                                                maintenance costs and the requirement for specialized          infiltrate to soil layers and freely
                                                equipment for maintenance techniques.                          discharges subsoil to an outfall to
                                                                                                               Weyba Creek. Refer to Stormwater
                                                                                                               Management Plan prepared by this
                                                                                                               office.




Page 3 of 12
June 2021

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.